- First Name
- Cory
- Joined
- Jul 2, 2021
- Threads
- 17
- Messages
- 864
- Reaction score
- 1,701
- Location
- Dallas, TX
- Vehicle(s)
- Audi A4, Chevy Chevelle SS, 2022 Maverick XLT
- Engine
- 2.5L Hybrid
- Thread starter
- #91
Very good.In Tim's video he is states that about 30% of his 45 allocations this month that got the production email from Ford were Hybrids.
And with the upcoming ramp of Maverick production in November (2700) and December (4900) if that 30% still holds then 2280 lucky ones will get their Maverick Hybrids scheduled for production over the next six weeks.
I was one of the lucky ones as I got my "scheduled for production" Ford emails last Thursday.
From another tread I saw someone post they got their hybrid scheduled for 11/7. They had my exact build from the same dealer and ordered 1 day after me but they didn’t have Lux package. Lux, assuming spray in liner, is still stopping builds.
Sponsored