Was that said in this week’s stream? Last I heard him say that we need to submit a new ‘23 order and will have both ‘22 & ‘23 orders simultaneously until ‘22 scheduling is completed.
Yes. That’s how I interpreted this week’s video.
Sponsored

 

skadizzle

2.5L Hybrid
Well-known member
Joined
Nov 2, 2021
Threads
42
Messages
1,886
Reaction score
2,011
Location
Orlando, Florida
Vehicle(s)
2023 Ford Maverick Lariat BAP
Engine
2.5L Hybrid
Clubs
 
Yes. That’s how I interpreted this week’s video.
That's not how you put your message. 22s will not be autorolled. If you ordered at Long McArthur he is going to place new 2023 orders for those 22 orders but that's his. You have to place a new 2023 order on 8/2 and the 22 could still get scheduled after up to 8/18. If it does, the 23 order is canceled and you get no private offer.
 

JazzyJockJeffcoat

2.5L Hybrid
Well-known member
Joined
Oct 11, 2021
Threads
0
Messages
99
Reaction score
140
Location
MD
Vehicle(s)
Chevy
Engine
2.5L Hybrid
Agreed. I’m in the same boat. Mid-September XLT hybrid with luxury and co pilot 360. I’ve seen many orders placed months after mine with the same build get scheduled. FIFO is a blatant lie
Ordered a hybrid XLT in the same time period (9/13) but dropped options, next week is supposed to be my build week, Ford rep says this time for real. Haven't seen many October hybrids built yet. Hopefully you get there.
 

WannaMav

2.5L Hybrid
Well-known member
Joined
Oct 9, 2021
Threads
78
Messages
896
Reaction score
1,381
Location
Hawaii
Vehicle(s)
2022 Maverick hybrid
Engine
2.5L Hybrid
I’d be happy with getting scheduled this coming week, but the last date I read said Ford would be scheduling through Aug 18.

How will everyone feel if you place your updated order for a 2023 on Aug 2 and them get scheduled for a 2022 still? 🙃
Carryover '22 orders to model year '23 do not have to be placed only on August 2nd. There is a window of roughly a month or so when those can be entered into the system and all such carryover orders should receive the same unique order date, regardless of what the calendar says on the date the '23 model year order is made.

As no '23s will be built until late October, this levels the playing field for those who may hold out to place a carryover order until after '22 scheduling ceases.
 

Pietalian

2.0L EcoBoost
Member
First Name
Daniel
Joined
Aug 25, 2021
Threads
2
Messages
20
Reaction score
36
Location
Indiana
Vehicle(s)
2013 Ford Focus, 2019 Chrysler Pacifica
Engine
2.0L EcoBoost
Would ordering a 2023 get a person a Maverick sooner than waiting for a 2022?
I certainly hope not, although we've seen plenty of strange outcomes in the scheduling process over the last year. Assuming the current constraint items are still constraints going into model year 2023, it seems possible that some highly-constrained 22s might be produced after non-constrained 23s.
 

Sponsored

Pietalian

2.0L EcoBoost
Member
First Name
Daniel
Joined
Aug 25, 2021
Threads
2
Messages
20
Reaction score
36
Location
Indiana
Vehicle(s)
2013 Ford Focus, 2019 Chrysler Pacifica
Engine
2.0L EcoBoost
Carryover '22 orders to model year '23 do not have to be placed only on August 2nd. There is a window of roughly a month or so when those can be entered into the system and all such carryover orders should receive the same unique order date, regardless of what the calendar says on the date the '23 model year order is made.

As no '23s will be built until late October, this levels the playing field for those who may hold out to place a carryover order until after '22 scheduling ceases.
Agreed, my point was more that some people might want to take advantage of trim changes, different paint colors, etc if they rollover. I'd switch to Eruption Green if they offer it in 23, but I'd rather get my 22 scheduled - "a bird in hand" and all that. I'm sure I'll find something to complain about either way 😆
 

fordluvr44

2.5L Hybrid
Well-known member
Joined
Apr 10, 2022
Threads
5
Messages
70
Reaction score
89
Location
CA
Vehicle(s)
Yes
Engine
2.5L Hybrid
I realize this might not be the perfect spot to ask, but -

When I order a 2023, will I have ANY insight or rough estimate into when I'll be able to take delivery?

Without a car right now (motorcycle as primary) and trying to plan some life stuff out. 3 months vs 9 months vs 18 months kinda has different implications so just any rough idea would be cool.

Did Ford clue you in when y'all ordered in 2022?
 

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
7
Messages
2,469
Reaction score
4,279
Location
GA
Vehicle(s)
2020 Porsche Macan S/2023 Integra 6MT
Engine
2.5L Hybrid
I ordered a FWD XL EB at the end of December and took delivery in April. So the wait on that was not bad.
 

Sam the Ram

Member
First Name
Steve
Joined
Mar 17, 2022
Threads
0
Messages
11
Reaction score
31
Location
Albuquerque NM 87112
Vehicle(s)
2000 S-10
Interestingply, I got an email from my dealer saying that my xlt hybrid (ordered in late oct) was scheduled to be built the week of 9/12, yet I haven’t received anything from ford. Still, sounds like good news.
Does anyone have any idea how many builds are actually built in a weeks time?
 

Tone

2.0L EcoBoost
Well-known member
First Name
Tony
Joined
Jan 21, 2022
Threads
3
Messages
202
Reaction score
164
Location
Millcreek, Utah
Vehicle(s)
Ranger
Engine
2.0L EcoBoost
Does anyone have any idea how many builds are actually built in a weeks time?
From their published numbers: They averaged 7558 per month which would be 378 per day if production is 5 days a week. 1889 per week.
 

Clive

2.5L Hybrid
Well-known member
Joined
Oct 22, 2021
Threads
10
Messages
309
Reaction score
439
Location
Los Angeles
Vehicle(s)
2022 Maverick XLT 2.0
Engine
2.5L Hybrid
Looks like scheduling this week has been canceled (per blue oval):
Ford Maverick ⏰ Maverick Scheduling Next Week (7/25) For Production Build Week 9/19 1659040400583