Yes exactly.. it means that at least 1 Maverick truck will be built in each of those weeks. Of course it could mean, we were planning on building at least 1 truck a week…. But if we don’t there’s not a damn thing you can do about it. Cause you know, we at Ford “just don’t care”.
There are likely a bunch of criteria that go into the order pull for production. Parts constraints, destination, worker availability (covid impacts)... maybe even profit on the build. I would think they want to optimize what they are building and delivering. At least that is what I would do.... and its certainly not been a FIFO process.
Sponsored

 

99nbbullitt

2.5L Hybrid
Active member
First Name
Gary
Joined
Dec 23, 2021
Threads
0
Messages
32
Reaction score
13
Location
Texas
Vehicle(s)
2023 Ford Maverick
Engine
2.5L Hybrid
I'm thinking with a July 7 order date you'll probably get scheduled next week for either the 2nd or 3rd week of march......I agree Ford is not going to get all the MY22 hybrids built, their just stringing people along for the next 7 or 8 months hoping they'll stick around for MY23.
I won't wait around even though I have loyality to Ford. My father retired from Ford Motor Co. In Louisville KY. I still have multiple family members that are still employed there. But I believe in corporate integrity if I'm treated fairly and honestly then I will be also. I have owned many Ford models thru the years. I just ask the Ford do what they publicize to customers that remain devoted to Ford products. Like I said before I have received conformation of my order but not a word since. My order number is G333 for the Maverick XL Hybrid base package carbonized gray.
 

Rattler

2.0L EcoBoost
Member
First Name
Craig
Joined
Dec 9, 2021
Threads
0
Messages
5
Reaction score
4
Location
Reno
Vehicle(s)
XLT Maverick
Engine
2.0L EcoBoost
Let’s just say you’re still unscheduled…late March builds will be chosen soon. That leaves only 4 months April-May-June-July before August retooling for 2023MY production. Then we have holiday shutdowns to plan for Cinco de Mayo and a few others. Not to mention the unplanned issues of transportation, supply chain, quality control, labor shortage, quarantine and the impending and ongoing Omicron shutdowns and ripple effects we have yet to see. Bottom line is a huge % of potential Maverick buyers who ordered and waited for months will be left with a constant reminder - a closet sized pile of tailgate letter stickers, hood deflectors and cruise control setups that were never able to be installed…as their new car dreams were destroyed. Based simply on their decision to pay $500 for a factory option that never was - darned sprayin bed liner.
#mavdreamkiller
Waiting patiently for something. My order was put it in November. I wish my dealer can tell me something...🙌 🥺
Nice to see more than 1 week being scheduled next week. Fingers crossed for a lot of people, really hoping production picks up for us all..
I ordered mine 1st of November had a build date on Valentine's Day 14th of February just got a message from ford saying the new build date it's going to be February 7th so they upped it a week .Hoorah
 

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
8
Messages
2,494
Reaction score
4,367
Location
GA
Vehicle(s)
2024 XLT Hybrid & 2024 Tesla M3P
Engine
2.5L Hybrid
I won't wait around even though I have loyality to Ford. My father retired from Ford Motor Co. In Louisville KY. I still have multiple family members that are still employed there. But I believe in corporate integrity if I'm treated fairly and honestly then I will be also. I have owned many Ford models thru the years. I just ask the Ford do what they publicize to customers that remain devoted to Ford products. Like I said before I have received conformation of my order but not a word since. My order number is G333 for the Maverick XL Hybrid base package carbonized gray.
I'm not sure what the question is. When did you order?
 

Sponsored

tsharpe9

New member
First Name
Thom Sharpe
Joined
Sep 19, 2021
Threads
0
Messages
1
Reaction score
1
Location
Florida
Vehicle(s)
Maverick
No, first MY 2023 production is currently scheduled for October 24. https://www.mavericktruckclub.com/f...-2022-production-begins-october-24-2022.6860/
My prediction is they will make only slight changes for 2023 since the 2022 is already so popular. So assuming a 2 week shutdown between model years, they could be producing MY 2022 up until October 7th.
Ordered my hybrid Maverick 6/17/21 stuck at the Jacksonville port waiting to be offloaded and delivered to my dealer. At least it’s closer than it was I’m Missouri a month ago.
 

Turtle

2.5L Hybrid
Well-known member
First Name
Dennis
Joined
Jul 26, 2021
Threads
54
Messages
765
Reaction score
888
Location
MD
Vehicle(s)
Escape Hybrid
Engine
2.5L Hybrid
You and me both are waiting on June orders.
I suspect if Ford wanted to clear out all the remaining June / July orders it would take more than two months. Except it doesn't work that way if you ordered from a local small dealership. They do not get allocations. July order that has been priority 2 for six weeks and still not scheduled.
 
Sponsored

DCM26

2.5L Hybrid
Member
First Name
Daniel
Joined
Jul 28, 2021
Threads
0
Messages
14
Reaction score
2
Location
60506
Vehicle(s)
Sonata
Engine
2.5L Hybrid
Interesting... Just got a call from my dealer with my VIN assigned and said it will be scheduled for 3/14 production. Maybe they get the order pull list earlier than the emails go out.
When did u order??
 

edcrawfordlv

2.5L Hybrid
Active member
Joined
Nov 21, 2021
Threads
0
Messages
31
Reaction score
58
Location
las vegas
Vehicle(s)
rav4
Engine
2.5L Hybrid
October 25th, 2021 from Autonation Ford in Corpus Christi, Texas
Same day I ordered my hybrid. Even then, I was expecting Early summer delivery and I believe my dealer quoted 12+ weeks. What was your expectation when you ordered?
 

SpacemanSpiff

2.5L Hybrid
Well-known member
First Name
Tyreese
Joined
Jun 23, 2021
Threads
11
Messages
354
Reaction score
811
Location
Mid-west
Vehicle(s)
F-15 Eagle
Engine
2.5L Hybrid
What happens if Ford cannot build all of the orders for model year 2022 before the next model year, 2023, rolls out in late summer 2022? At their current production pace, safety recalls, and Covid set backs is it realistic that they can build all of the orders? Some on this site have been waiting since July-Aug for a build date. What happens to those who ordered in late fall before the cutoff?
I placed my order on June 14. I do NOT have a build date as of yet. I know of at least another person that ordered the very first day, June 8 - also without a scheduled build date.
 

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
8
Messages
2,494
Reaction score
4,367
Location
GA
Vehicle(s)
2024 XLT Hybrid & 2024 Tesla M3P
Engine
2.5L Hybrid
October 25th, 2021 from Autonation Ford in Corpus Christi, Texas
Well then you're gonna need to chill out. There are people who ordered 4 months before you that still have no build date or anything. Even I ordered almost 3 weeks before you, and I don't expect to hear anything for quite some time.