Keep the Badlands! You'll love it, way more capable then any Maverick! I bought a BS, still no build date on the Maverick.Scheduled!
Edited to follow format:
- Time email was received: 12:56PM EST
- Your scheduled build week: January 31, 2022
- 🛻 All relevant build info : Hybrid, Cyber Orange, Lariat, Lux package, co-pilot 360, Sun-roof.
- Your region, if comfortable: Upstate NY
- Your original order date: 6/11/2021
- Dealer: Chapman, Horsham PA
Now I have a dilemma, I have a deposit down (fully refundable) on a 21 Bronco Sport Badlands which arrived today and I am supposed to see/test drive tomorrow. WHAT TO DO....
lariat ECO AWD NO LUX ScheduledReposado Tequila here- I need this truck- Anyone get a Lariat Lux Eco scheduled ?
A oldie but goodie.. Ford's scheduling system:Crazy on how the scheduling is done, Dbarr ordered almost the exact same build as me from the same dealer yet he ordered in June and I ordered 8/2 and I got a build date. Only difference in builds was he ordered 360 and I didn’t. Both hybrid, XLT, Lux, Moonroof, rear window.
Over 3 months for me without a peep. I'm now looking for any available Santa Cruz Limiteds within a reasonable travel distance, and if they will give me a reasonable price. Tired of the promise-filled void. I'm giving ford until year end.Reposado Tequila here- I need this truck- Anyone get a Lariat Lux Eco scheduled ?
I seen one!!!!I still haven’t even see the maverick in person. I really hope it looks nice and larger in person
Me thinks 6 months, I ordered in mid August, mid February they should catch up.......I’m just hoping to get all of the backlog scheduled for January so maybe us November order people get scheduled in February
BadLands it is! My brother has one and it is the Alpha Male/Female Truck of the Year. Hands down Super Truck if you pay MSRP..Keep the Badlands! You'll love it, way more capable then any Maverick! I bought a BS, still no build date on the Maverick.