- First Name
- Jim
- Joined
- Oct 28, 2021
- Threads
- 9
- Messages
- 519
- Reaction score
- 513
- Location
- Rochester NY
- Vehicle(s)
- 2022 Ford Maverick XLT Ecoboost
- Engine
- 2.0L EcoBoost
Great/ So I was told I was scheduled 6/6. But from what some said, that was probably pushed to 6/13. So scheduled 6/13 to be built August 1st (at the earliest). Add to the fact that I have the XLT luxury package, so good chance it gets delayed at least once. Then add at least 3 weeks for transport ..... so maybe September, who knows. But as far as I know, October is when the last 2022 will be built, correct? So then what happens? All unbuilt 2022 go to the front of the 2023 line? Sheesh.Yes, everything up to 8/1 is already scheduled.
Sponsored