- First Name
- Chris
- Joined
- Jul 3, 2021
- Threads
- 11
- Messages
- 4,378
- Reaction score
- 9,209
- Location
- Tucson, AZ
- Vehicle(s)
- 15 Breakout, 21 Road King Special, 22 Maverick XLT
- Engine
- 2.5L Hybrid
What it means is that out of the total number of builds for that week only 40% could be hybrids, actual numbers will depend upon supplies. XLT LUX package with SIBL was at 3% (don't quote me on that number) so that means of the XLT hybrids scheduled only 3% of those that have LUX package with SIBL will get built. So there's many different ways to slice the scheduling pie. Because you have to figure in the number allocations given to your dealership for that week, which then you get into the priority number your dealership has assigned your build!
Lastly, don't bash Ford or their scheduling team like I've done on this forum, because I think they're secretly keeping me from getting a build date!
Lastly, don't bash Ford or their scheduling team like I've done on this forum, because I think they're secretly keeping me from getting a build date!
Sponsored