Had gotten Ford email with 5/9 build, next week email with 5/2, next week with 5/9 again and this week email with 5/16 date. Ordered Rapid Red FE with no other options on 7/12.
Sponsored

 

unlimited

2.5L Hybrid
Well-known member
First Name
Heidi
Joined
Sep 23, 2021
Threads
5
Messages
178
Reaction score
167
Location
Missouri
Vehicle(s)
F-150 Limited
Engine
2.5L Hybrid
Had gotten Ford email with 5/9 build, next week email with 5/2, next week with 5/9 again and this week email with 5/16 date. Ordered Rapid Red FE with no other options on 7/12.
Well at least they are some what working on it. :cautious:
 

Automate

2.5L Hybrid
Well-known member
Joined
Jul 21, 2021
Threads
53
Messages
1,637
Reaction score
1,884
Location
Atlanta GA, USA (ATL)
Vehicle(s)
Fusion Hybrid, Mav XL Hybrid
Engine
2.5L Hybrid
40/60 Hybrid/Ecoboost
That does not make sense.
If they have enough parts to make 10,000 * 0.4 = 4000 Hybrids in June
And the reason for only 2800 Mavs in July is vacation time and not parts.
They should be able to make 2800 Hybrids in July
 

Ndn01chief

2.5L Hybrid
Member
First Name
Michael
Joined
Oct 14, 2021
Threads
2
Messages
7
Reaction score
26
Location
AL
Vehicle(s)
2015 Ford Escape
Engine
2.5L Hybrid
I see this post every week but what is it telling me? I only see they are scheduling for the week but do not see how many they are building or what orders they are building. I ordered my hybrid xlt luxury package, 360, moonroof and sliding rear window. I under stand my constraints are the lux and 360.
 
Joined
Feb 8, 2022
Threads
0
Messages
6
Reaction score
9
Location
OLATHE, KS
Vehicle(s)
Toyota Tacoma
September 3rd, 2021 order here. Anybody else from late August/ early September hitting up Ford every day like I am?

XLT hybrid, copilot 360, lux package w/tonneau cover. carbonized grey :cool:
Surprised you have been scheduled...Sept 17 here with everything you had except I went Lariat. Called two weeks ago and got a VIN with an estimated build of 5/30
 

Sponsored

dvkreshpan

2.5L Hybrid
Member
First Name
Vi
Joined
Apr 21, 2022
Threads
1
Messages
24
Reaction score
16
Location
Conway sc
Vehicle(s)
Dodge
Engine
2.5L Hybrid
I ordered my maverick hybrid in oct was confirmed oct 21 .have not heard anything yet or vin . I hope I be in this build here’s hoping .
 

fordvideoguy

Well-known member
First Name
Tim
Joined
Jul 10, 2021
Threads
123
Messages
1,827
Reaction score
6,799
Location
Salina, KS
Website
www.long-mcarthur.com
Vehicle(s)
2022 F-150 Lightning, 2021 Ford Bronco
Engine
Undecided
That does not make sense.
If they have enough parts to make 10,000 * 0.4 = 4000 Hybrids in June
And the reason for only 2800 Mavs in July is vacation time and not parts.
They should be able to make 2800 Hybrids in July
I was joking about vacation. Trying to make fun of only producing 2800. Their preventative have always been 40/60.
 

dvkreshpan

2.5L Hybrid
Member
First Name
Vi
Joined
Apr 21, 2022
Threads
1
Messages
24
Reaction score
16
Location
Conway sc
Vehicle(s)
Dodge
Engine
2.5L Hybrid
I ordered mine oct 21 no vin yet no question answered called the ford production number said I have order in processing should have my ford maverick hybrid scheduled soon . I not understand why can not get any answers or a thread hope.
 

theway-yay-ting

2.5L Hybrid
Well-known member
First Name
Al
Joined
Feb 2, 2022
Threads
39
Messages
1,396
Reaction score
2,345
Location
Virginia
Vehicle(s)
2014 Honda CR-V, 2019 Kia Sportage
Engine
2.5L Hybrid
That does not make sense.
If they have enough parts to make 10,000 * 0.4 = 4000 Hybrids in June
And the reason for only 2800 Mavs in July is vacation time and not parts.
They should be able to make 2800 Hybrids in July
They’ve been saying for months that the hybrid is constrained at 40%, so I would assume their scheduling target mix Is 40/60 every month, no?

I’m starting to believe they are literally running out of hybrid parts as we head toward the end of the MY22 production cycle. Even though they’ll build until 10/21, I suspect they’ll end up building dealer stock EBs toward the tail end, since they clearly over-forecast the EB components needed.
 
Last edited:
Sponsored

lagrene

2.5L Hybrid
Active member
First Name
Milton
Joined
Apr 18, 2022
Threads
0
Messages
31
Reaction score
17
Location
New Orleans
Vehicle(s)
Ford Maverick XLT
Engine
2.5L Hybrid
September 3rd, 2021 order here. Anybody else from late August/ early September hitting up Ford every day like I am?

XLT hybrid, copilot 360, lux package w/tonneau cover. carbonized grey :cool:
 

lagrene

2.5L Hybrid
Active member
First Name
Milton
Joined
Apr 18, 2022
Threads
0
Messages
31
Reaction score
17
Location
New Orleans
Vehicle(s)
Ford Maverick XLT
Engine
2.5L Hybrid
Order and confirmed on 8/2/21 Area 51, hybrid XLT Lux & 360. Sliding rear window and rolling tonneau cover. Heard nothing but early promise of some free FITS.
 

Vols44

2.5L Hybrid
Well-known member
Joined
Sep 19, 2021
Threads
0
Messages
731
Reaction score
700
Location
Missouri
Vehicle(s)
2018 Edge
Engine
2.5L Hybrid
That does not make sense.
If they have enough parts to make 10,000 * 0.4 = 4000 Hybrids in June
And the reason for only 2800 Mavs in July is vacation time and not parts.
They should be able to make 2800 Hybrids in July
During a recent YT live stream @fordvideoguy mentioned that Ford must be caught up on Ecoboost orders. Long McArthur only has a handful of June through August Ecoboost orders left. Most of the hybrid June and July orders have multiple constrained items.

The 40/60 balance is the end goal because that's the number of drivetrains anticipated at the beginning of the MY.
 

pistons pissing

2.5L Hybrid
Well-known member
First Name
Cody
Joined
Mar 7, 2022
Threads
1
Messages
249
Reaction score
401
Location
oklahoma
Vehicle(s)
2015 toyota camry
Engine
2.5L Hybrid
I do not understand the chart. Can someone explain please.
Those are build weeks. Maverick has scheduled builds every week in June. Some months they may only have 1 or 2 build weeks as you can see some ford models have none in June.
 

HBTuttle

Member
First Name
Brandon
Joined
Mar 19, 2022
Threads
0
Messages
15
Reaction score
8
Location
Newberg, OR
Vehicle(s)
2015 Ford Escape SE
During a recent YT live stream @fordvideoguy mentioned that Ford must be caught up on Ecoboost orders. Long McArthur only has a handful of June through August Ecoboost orders left. Most of the hybrid June and July orders have multiple constrained items.

The 40/60 balance is the end goal because that's the number of drivetrains anticipated at the beginning of the MY.