For those with September, October and November Hybrid orders (sorry, this is targeting only The Hybrid side of the ‘separate but equal’ Maverick equation):
you may be ciphering, guessing and correlating order dates vs schedule dates to figure where you are in queue, especially with the recent ‘consultant and constraints’ hoax thread (I never got the previewed email, but there may have been a reason).
My Salesman sent an email Thursday afternoon, a barebones email and surprising, informing “here’s your vin for a 6-6 schedule date”.
September 21, 2021 order dates, large list of constraints, none deleted, being built as entered (no deposit, non-binding, MSRP).
Looks to me like the plant is chewing through summer hybrid orders and tickling early fall orders. Keep the faith, baby!
I’ve written this elsewhere in this Forum, but perhaps it’ll calm and salve the jangled nerves: my guy said in September “it’ll be 6 to 9 months, w/o any glitches or supply problems”. Nailed it, which helped keep perspective as the weeks/months piled up.
So I’ve got a D-Day schedule with the New over/under (4th? 5th? There’s been a few) for when it gets driven off the lot as July 4th. As with all the previous dates, I’m taking the over.
Hang in there!
you may be ciphering, guessing and correlating order dates vs schedule dates to figure where you are in queue, especially with the recent ‘consultant and constraints’ hoax thread (I never got the previewed email, but there may have been a reason).
My Salesman sent an email Thursday afternoon, a barebones email and surprising, informing “here’s your vin for a 6-6 schedule date”.
September 21, 2021 order dates, large list of constraints, none deleted, being built as entered (no deposit, non-binding, MSRP).
Looks to me like the plant is chewing through summer hybrid orders and tickling early fall orders. Keep the faith, baby!
I’ve written this elsewhere in this Forum, but perhaps it’ll calm and salve the jangled nerves: my guy said in September “it’ll be 6 to 9 months, w/o any glitches or supply problems”. Nailed it, which helped keep perspective as the weeks/months piled up.
So I’ve got a D-Day schedule with the New over/under (4th? 5th? There’s been a few) for when it gets driven off the lot as July 4th. As with all the previous dates, I’m taking the over.
Hang in there!