Ok, I get that, but what really bugs me is seeing someone post a build date for the same trim level as mine (Lariat Lux Hybrid) with an order date 3 weeks LATER than mine. What’s up with that?all Hybrids - however, certain trim levels are constraints (lux packages) and are scheduling at a MUCH LOWER percentage...17%-20% of non-lux