Hi all! I ordered an XLT Lux Hybrid on Oct 30, 2021. I lost all hope of my truck being built this year, so last week I reached out to my dealer to inquire about submitting a ‘23 order. Much to my surprise, my dealer said that my truck was scheduled for the week of 10/17. I called Ford customer service last week, and they confirmed the 10/17 build week and provided my VIN. Today I called Ford for an update, and they said that my build week is now 10/24.
This got me wondering… will Ford actually produce every ‘22 Maverick which has a VIN assigned? My VIN ends in B03xxx, and I’ve seen other customers comment with B11xxx VINs. This means that Ford must intend to produce over 111,000 ‘22 Mavericks.
If we look at the numbers, Ford had built 86,939 ‘22 Mavericks by the end of August. In order to build 111k Mavericks, Ford would need to build about 10k/month up until Nov. 14th (the date which they are allegedly switching over to ‘23 production). Considering that Ford has yet to build 10k Mavericks in any given month, this sounds improbable.
So, can we actually depend on Ford building all of the ‘22 orders which have been assigned VINs? I keep reading more and more posts about ‘22 orders being pushed back, and it’s making me wonder if I should be submitting a ‘23 order as a contingency plan. However, I don’t think I’d be eligible for the “private offer” since I was already assigned a VIN.
This got me wondering… will Ford actually produce every ‘22 Maverick which has a VIN assigned? My VIN ends in B03xxx, and I’ve seen other customers comment with B11xxx VINs. This means that Ford must intend to produce over 111,000 ‘22 Mavericks.
If we look at the numbers, Ford had built 86,939 ‘22 Mavericks by the end of August. In order to build 111k Mavericks, Ford would need to build about 10k/month up until Nov. 14th (the date which they are allegedly switching over to ‘23 production). Considering that Ford has yet to build 10k Mavericks in any given month, this sounds improbable.
So, can we actually depend on Ford building all of the ‘22 orders which have been assigned VINs? I keep reading more and more posts about ‘22 orders being pushed back, and it’s making me wonder if I should be submitting a ‘23 order as a contingency plan. However, I don’t think I’d be eligible for the “private offer” since I was already assigned a VIN.
Sponsored