I'm trying to make sense of the timeframe I could expect to wait for my Hybrid XLT, which was ordered on 1 November 2021. I read that there have been 20,000+ Mavs already built. I also read that there have been over 100,000 reservations received and that the max number that can be built is 800/day, or 4,000/week. To simplify, let's say there have been 120,000 reservations minus 20,000 built equals 100,000 more to build. At 4,000/week, it will take 25 weeks to get all of them off the production line and rolling to their owners. #100,000 should be on the transport on May 25, 2022, all things being equal, which of course, they aren't. For those in the know, is this a realistic assumption?