New Email 10/18/22 - 2022 with Dec Build date

Captain

2.0L EcoBoost
Well-known member
First Name
Jim
Joined
Sep 19, 2021
Threads
13
Messages
894
Reaction score
1,180
Location
Union County, NJ
Vehicle(s)
63 Nova Convertible /
Engine
2.0L EcoBoost
Clubs
 
Just received another change date…. Back to October 31, 2022 build week…. Thankful it’s not December.
Sponsored

 

Sikinboat

2.5L Hybrid
Member
First Name
Cody
Joined
Aug 26, 2022
Threads
1
Messages
13
Reaction score
19
Location
Mo
Vehicle(s)
2021 bronco 22 maverick hybrid on order
Engine
2.5L Hybrid
9/17/21 order date xlt lux co pilot 360, spray in liner original 10/17, 10/30, 11/14, now 12/5 if it’s rolled over they better figure out how to add the things that were on the 22 I would have ordered it different if given the chance I work for Ford but this is becoming beyond a joke
 

MvrkECWI

2.5L Hybrid
Well-known member
Joined
Apr 8, 2022
Threads
4
Messages
236
Reaction score
481
Location
54701
Vehicle(s)
Maverick, Crosstrek
Engine
2.5L Hybrid
Ford's allocation system allowed later orders to get built while others waited. Makes me even madder.
 

Sponsored

NJ Pinelands

2.5L Hybrid
Well-known member
Joined
Oct 31, 2021
Threads
187
Messages
2,212
Reaction score
2,654
Location
New Jersey
Vehicle(s)
Chevrolet
Engine
2.5L Hybrid
Ordered 12/13/2021. Received a VIN and August 22 build week . . . a while ago. Cannot even remember anymore. Moved to September something something. Then October 7. And now it's the laughable Tuesday night set your clock by it e-mail: October 4, then 11, then 17, then 24, then 31. At some point it's just pointless and meaningless.

What a cluster.
Ford flat out lied to thousands of people in August. They knew the builds in September were never going to happen.
 

Rob in VB

2.5L Hybrid
Member
First Name
Rob
Joined
Jan 3, 2022
Threads
2
Messages
23
Reaction score
37
Location
Virginia Beach, VA
Vehicle(s)
Cactus Gray Lariat Hybrid
Engine
2.5L Hybrid
Lariat Hybrid. Ordered Nov 5, 2021. I’ve also been bumped to Dec 12th.
If that does mean I will be converted to MY23, I hope that means I can at least get the black appearance package.
Ford Maverick New Email 10/18/22 - 2022 with Dec Build date 293E9ACD-0CCD-4B2C-8355-C447196E05A7
 

CallBall

2.5L Hybrid
Well-known member
Joined
Jul 30, 2022
Threads
2
Messages
48
Reaction score
35
Location
NC
Vehicle(s)
Honda Accord Coupe
Engine
2.5L Hybrid
Just got moved to the week of 11/21.

Hybrid Lariat Lux with trailer hitch, Touchlink lighting, full size spare, and wheel lock kit. Order placed on 10/25/21, confirmed on 10/29/21. Build weeks were 9/12, 9/26, 10/17, and 10/31. This is really sucking the excitement and anticipation right out of me. I’m sure I’ll be happy with the truck when (if?) I finally get it, but I’m just over it right now.
 

mktmgrjrm

2.5L Hybrid
Well-known member
First Name
John
Joined
Sep 19, 2021
Threads
15
Messages
356
Reaction score
418
Location
North Central Ohio
Vehicle(s)
Ford Maverick Hybrid, Ford Fusion Hybrid
Engine
2.5L Hybrid
Got an email from FORD while I was listening to @fordvideoguy advising me that my MY22 Lariat Lux has been pushed to week of 12/12 (7th time pushed). Oh, well - I kinda wanted to get pushed to MY23 anyway to get nav in the SYNC3 system. Guess I probably won't need the winter tires I've already bought for this year. Better get out the Armor-All and coat them up good.
 
Sponsored

225er

2.5L Hybrid
Active member
First Name
Michael
Joined
Oct 25, 2021
Threads
4
Messages
43
Reaction score
73
Location
Baton Rouge
Vehicle(s)
2015 Tacoma
Engine
2.5L Hybrid
Just saw it, wtf give me a 2023 if I have to wait til 2023 to get my truck I ordered in 2021
 

MakinDoForNow

2.5L Hybrid
Well-known member
First Name
James
Joined
Sep 24, 2021
Threads
1
Messages
4,929
Reaction score
3,185
Location
Texas
Vehicle(s)
2022 Maverick
Engine
2.5L Hybrid
Ha! I just got an email too. Pushed back another week.

11/2/21 Confirmed Order
7/12 VIN Assigned
9/5 Production Date
10'3 Production Date
10/17 Production Date
10/24 Production Date
10/31 Production Date
11/14 Production Date

11/21 Production Date
Wow you are getting a date before me. I had 10/31 Production Date until 7:23pm on 10/18 when I was pushed to 11/28. Pretty quick I suspect they will announce a run of 2022.5 model maverick in special ERUPTION GREEN with a hood decal of 4 leaf clovers. I might even wet my pants and say the wait was worth it!
 

KungFuGrip

2.5L Hybrid
Well-known member
First Name
Jim
Joined
Oct 6, 2021
Threads
1
Messages
55
Reaction score
81
Location
Kansas
Vehicle(s)
2022 Maverick Hybrid XLT
Engine
2.5L Hybrid
Annnnnd I'm moved to 11/28. Let's see if that sticks.
 

haleedog

2.5L Hybrid
Active member
Joined
Jan 27, 2022
Threads
1
Messages
39
Reaction score
28
Location
DFW
Vehicle(s)
2009 F150, 2016 Lincoln MKX
Engine
2.5L Hybrid
Annnnnd I'm moved to 11/28. Let's see if that sticks.
Yep got the email last week moving from week of 11/7 to week of 11/14, and today get moved to 12/12. XLT hybrid orders 11/01/21