I was scheduled for the week of July 24th, now it has been changed to the week of July 29th. Do I need to worry? Does anyone know what this means..
Sponsored

 

bridges1992

2.0L EcoBoost
Well-known member
First Name
Caleb
Joined
Sep 30, 2022
Threads
1
Messages
101
Reaction score
45
Location
West Virginia
Vehicle(s)
Corolla
Engine
2.0L EcoBoost
Same week it’s now specially saying they are planning on building your truck that day.
 

HTX

2.5L Hybrid
Well-known member
First Name
Jon
Joined
Apr 12, 2022
Threads
10
Messages
572
Reaction score
560
Location
Houston TX
Vehicle(s)
CR-V
Engine
2.5L Hybrid
Normal. Keep calm and carry on (waiting).
 

Feldgary53

2.5L Hybrid
Well-known member
First Name
Gary
Joined
Mar 4, 2021
Threads
17
Messages
238
Reaction score
239
Location
Portland,Oregon
Vehicle(s)
‘23 Maverick Lariat Hybrid, ‘13 Porsche 911,’22 Porsche Macan S
Engine
2.5L Hybrid
I agree with previous posts that they have settled on a day of your build week now.
The same thing happened to me and changed a couple times in same week and after contacting Ford Chat I was told it's the day not the week as it shows on the tracker. So my week of July 31 became Aug 1 then Aug 3 and is holding.
 

Old Man

2.0L EcoBoost
Banned
Banned
First Name
Mike
Joined
Jan 6, 2023
Threads
6
Messages
1,332
Reaction score
1,731
Location
Nebraska
Vehicle(s)
2023 Lariat
Engine
2.0L EcoBoost
As long as it says week of it can move around a little. When it says day of then it is set to go to production.
 

Sponsored

Utjazz

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Dec 26, 2022
Threads
14
Messages
55
Reaction score
92
Location
St George, UT
Vehicle(s)
Ford Maverick to be
Engine
2.5L Hybrid
I was scheduled for the week of July 24th, now it has been changed to the week of July 29th. Do I need to worry? Does anyone know what this means..
My date changed as well. Originally it said week of July 17. Then it was also moved back to week of 22. I thought “oh well it’s the same week, so maybe no big deal”… then on July 11, I checked and the window sticker was there, and it indicated “in production” with a new date of week of July 19. Nothing has changed or updated since then. So hopefully, like someone on the thread indicated, maybe my build date is tomorrow the 19th!
So look about during week before your scheduled for the window sticker! Once I saw that, that’s when it got exciting to me! Good luck!
 

Hardening2753

2.5L Hybrid
Well-known member
Joined
Jul 30, 2022
Threads
19
Messages
967
Reaction score
807
Location
USA
Vehicle(s)
Ford Maverick Hybrid
Engine
2.5L Hybrid
Clubs
 
I was scheduled for the week of July 24th, now it has been changed to the week of July 29th. Do I need to worry? Does anyone know what this means..
Pretty normal
 

WJOHNM

2.0L EcoBoost
Well-known member
First Name
John
Joined
Oct 24, 2021
Threads
11
Messages
956
Reaction score
990
Location
New York,LI
Vehicle(s)
22 FX4, 25 LARIAT HYBRID, 26 LOBO 702.
Engine
2.0L EcoBoost
Clubs
 
I was scheduled for the week of July 24th, now it has been changed to the week of July 29th. Do I need to worry? Does anyone know what this means..
Mine changed 3 times, think its common, have had my truck 14 months now.
 

Deleted member 5597

Guest
For my '22 hybrid XLT w/lux and CP360 that I ordered on 15 Oct 21, I received a scheduling letter in Aug 22 for production the week of 19 Sept. It was pushed back every week going into December, where it was finally canceled.

The '23 hybrid Lariat w/lux, BAP and CP 360 that I ordered on 15 Sept 22 will not be built as well.

Do you have to worry? Well, yes.
 

Mikew555

2.0L EcoBoost
Well-known member
First Name
mike
Joined
Jun 4, 2022
Threads
6
Messages
109
Reaction score
62
Location
South Carolina
Vehicle(s)
ford maverick
Engine
2.0L EcoBoost
Ford did that to me a few times! Don't worry you'll get your maverick. They're just messing with your mind.....
 
Sponsored

commadorebob

2.0L EcoBoost
Well-known member
First Name
Bob
Joined
Sep 17, 2022
Threads
62
Messages
4,954
Reaction score
10,548
Location
Alabama
Vehicle(s)
2025 Expedition Max Platinum; 2023 Maverick Lariat
Engine
2.0L EcoBoost
The wait is almost over and is worth it.

But yes, like others have said, Ford is now selecting the specific day of the week to build it. Window sticker should pop soon, if not already.
 

Azmig88

2.0L EcoBoost
Well-known member
First Name
Ted
Joined
Feb 25, 2023
Threads
32
Messages
605
Reaction score
526
Location
Illinois
Vehicle(s)
2022 Ford Maverick 2.0 Lariat
Engine
2.0L EcoBoost
Mine changed twice
Nothing to worry about
Very normal

Erase it from your mind 😀
 

NotAnonymous

2.5L Hybrid
Well-known member
Joined
Jun 9, 2021
Threads
2
Messages
871
Reaction score
1,257
Location
Indiana
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
Situation normal - my build week changed 3 times back in early 2022.
 

WJOHNM

2.0L EcoBoost
Well-known member
First Name
John
Joined
Oct 24, 2021
Threads
11
Messages
956
Reaction score
990
Location
New York,LI
Vehicle(s)
22 FX4, 25 LARIAT HYBRID, 26 LOBO 702.
Engine
2.0L EcoBoost
Clubs
 
mine changed 3 times it happens.
 

LSchicago

2.5L Hybrid
Well-known member
First Name
Lloyd
Joined
Jul 19, 2022
Threads
83
Messages
4,029
Reaction score
5,227
Location
IL
Vehicle(s)
2018 Mustang GT, 99 E150 Clb Wgn, 23 Mav XL Hybrid
Engine
2.5L Hybrid
Clubs
 
I was scheduled for the week of July 24th, now it has been changed to the week of July 29th. Do I need to worry? Does anyone know what this means..
No see my sig. Mine changed 4 times, and in build BEFORE the scheduled week. Dates change.