And my June 10th orders keeps getting pushed back, had a VIN for a month now, means nothing.
Sponsored

 

Kylescc13

Member
First Name
Kyle
Joined
Feb 16, 2022
Threads
0
Messages
15
Reaction score
16
Location
Canada
Vehicle(s)
F150 Waiting for Maverick
I ordered Oct 15 last year and I finally got a vin last week and I think its built
 

TorqueWrenchUSA

2.0L EcoBoost
Well-known member
First Name
Joe
Joined
Oct 28, 2021
Threads
6
Messages
72
Reaction score
79
Location
Cincinnati, Ohio
Vehicle(s)
03' VDC Outback wagon, 97' zoom zoom Miata
Engine
2.0L EcoBoost
Heard from my dealer that I'm a priority 2 for my late October order. Which is cool and all, except I don't expect it to get scheduled anytime soon since I have a lux package with the sibl that I didn't want to change to the dibl. And the 4K I'm sure isn't helping either lol. Congrats to those getting scheduled and built 😎
 

Sponsored

XLTLUXCG

Well-known member
Joined
Nov 19, 2021
Threads
3
Messages
232
Reaction score
272
Location
Fort Worth
Vehicle(s)
Kia - soon to be XLT Maverick

MvrkECWI

2.5L Hybrid
Well-known member
Joined
Apr 8, 2022
Threads
4
Messages
236
Reaction score
481
Location
54701
Vehicle(s)
Maverick, Crosstrek
Engine
2.5L Hybrid
With only 1 week scheduling I'm going with Ben Franklin: "Optimists only expect the best to happen and are, therefore, constantly disappointed. I, however, always prepare myself for the worst and am, therefore, pleasantly surprised!"
Hoping for pleasantly surprised, but I'm prepared for the usual...disappointment.
 

vabchusa

2.5L Hybrid
Well-known member
First Name
Bill
Joined
Aug 9, 2021
Threads
7
Messages
293
Reaction score
542
Location
Va Bch, VA 23452
Vehicle(s)
2015 Ford C Max SE, 2022 Maverick First Edition
Engine
2.5L Hybrid
Clubs
 
Another week and another push back on my build. First scheduled for 5/9, moved to 5/2, then back to 5/9, then to 5/16, then 5/23 and now to 5/30. This is getting old fast. 7/12 order First Edition Rapid Red, Lariat lux and Copilot 360 packages with no other extras.
 

UncleDuke

Well-known member
Joined
Sep 8, 2021
Threads
25
Messages
236
Reaction score
549
Location
nevada
Vehicle(s)
fusion
Here we go AGAIN 5:10 pm your production date has changed !!!!!!!!!!!

This is getting old!!!!!
 

Delzona

2.5L Hybrid
Well-known member
First Name
Chris
Joined
Jul 3, 2021
Threads
11
Messages
4,378
Reaction score
9,209
Location
Tucson, AZ
Vehicle(s)
15 Breakout, 21 Road King Special, 22 Maverick XLT
Engine
2.5L Hybrid
And my June 10th orders keeps getting pushed back, had a VIN for a month now, means nothing.
My build week got moved 3 times before final getting started and that was over a month period!
 
Sponsored

Mabcim

2.0L EcoBoost
Well-known member
First Name
Mark
Joined
Oct 4, 2021
Threads
2
Messages
793
Reaction score
613
Location
Rochester, NY
Vehicle(s)
22 Maverick Lariat 2.0 AWD; 20 Escape SEL 2.0 AWD
Engine
2.0L EcoBoost
Clubs
 
Similar experience here. I was scheduled for next week, 5/16, which held for a few weeks (and even when I called last week); even had a build day. Called Thursday and was now week 5/23 (no build day). Just got an email saying I’m now 5/30. Things are changing too fast to not be a chip shipment issue of some kind. I have a feeling our chips are going to F150s
 

Delzona

2.5L Hybrid
Well-known member
First Name
Chris
Joined
Jul 3, 2021
Threads
11
Messages
4,378
Reaction score
9,209
Location
Tucson, AZ
Vehicle(s)
15 Breakout, 21 Road King Special, 22 Maverick XLT
Engine
2.5L Hybrid

XLTLUXCG

Well-known member
Joined
Nov 19, 2021
Threads
3
Messages
232
Reaction score
272
Location
Fort Worth
Vehicle(s)
Kia - soon to be XLT Maverick

Delzona

2.5L Hybrid
Well-known member
First Name
Chris
Joined
Jul 3, 2021
Threads
11
Messages
4,378
Reaction score
9,209
Location
Tucson, AZ
Vehicle(s)
15 Breakout, 21 Road King Special, 22 Maverick XLT
Engine
2.5L Hybrid

n0maverick

2.5L Hybrid
Well-known member
Joined
Dec 27, 2021
Threads
0
Messages
326
Reaction score
466
Location
MidMO
Vehicle(s)
2022 Tiguan, 2022 Maverick, 2013 Escape
Engine
2.5L Hybrid
Similar experience here. I was scheduled for next week, 5/16, which held for a few weeks (and even when I called last week); even had a build day. Called Thursday and was now week 5/23 (no build day). Just got an email saying I’m now 5/30. Things are changing too fast to not be a chip shipment issue of some kind. I have a feeling our chips are going to F150s
I feel like I won the lottery getting shipped out today before these delays!