Interesting that they're scheduling for build weeks of 5/16 & 5/23, as that is what they were scheduling for last week as well.
 

Jcaver98

Active member
First Name
Justin
Joined
Jan 4, 2022
Threads
0
Messages
29
Reaction score
10
Location
Plantersville, AL
Vehicle(s)
2007 GMC Sierra
Interesting that they're scheduling for build weeks of 5/16 & 5/23, as that is what they were scheduling for last week as well.
I know. I guess they want to schedule more for those 2 weeks.
 

theway-yay-ting

2.5L Hybrid
Well-known member
First Name
Al
Joined
Feb 2, 2022
Threads
39
Messages
1,396
Reaction score
2,345
Location
Virginia
Vehicle(s)
2014 Honda CR-V, 2019 Kia Sportage
Engine
2.5L Hybrid
I know. I guess they want to schedule more for those 2 weeks.
Coupled with the fact that Bronco Sport scheduling just says "Retail Order Scheduling Only" (last time they explicitly scheduled Bronco Sports for specific weeks was 3/21, and that was for 5/16 & 5/23 also), hopefully this means that they are prioritizing Mavericks over Bronco Sports for at least those two weeks of production at Hermosillo.
 

Sponsored

theway-yay-ting

2.5L Hybrid
Well-known member
First Name
Al
Joined
Feb 2, 2022
Threads
39
Messages
1,396
Reaction score
2,345
Location
Virginia
Vehicle(s)
2014 Honda CR-V, 2019 Kia Sportage
Engine
2.5L Hybrid
If your maverick is scheduled in May you may get it in June sometime.
Mine (late Oct order) is not getting scheduled until late summer at best, but here's hoping... 🤷‍♂️
 

theway-yay-ting

2.5L Hybrid
Well-known member
First Name
Al
Joined
Feb 2, 2022
Threads
39
Messages
1,396
Reaction score
2,345
Location
Virginia
Vehicle(s)
2014 Honda CR-V, 2019 Kia Sportage
Engine
2.5L Hybrid
or will it be more like July nellie
Typical timeline from built to delivered seems to be 4-6 weeks. But that also assumes the truck doesn't get put on a parts hold for missing components after the build starts.
 

hunterdon1

2.0L EcoBoost
Well-known member
First Name
Don
Joined
Sep 3, 2021
Threads
3
Messages
183
Reaction score
362
Location
Charlotte Mi
Vehicle(s)
2014 Ford Focus
Engine
2.0L EcoBoost
My Maverick was scheduled for the week of April 4th. Rescheduled for the week of April 18th. Rescheduled for the week of April 25th. Rescheduled for the week of April 11th. And just yesterday scheduled for the week of April 25th. Even Ford doesn't know when they will build my truck.
 

Meintc

2.5L Hybrid
Well-known member
First Name
Lynette
Joined
Oct 4, 2021
Threads
16
Messages
1,410
Reaction score
1,823
Location
Northern Lower Michigan
Vehicle(s)
2018 Ford Escape
Engine
2.5L Hybrid
My Maverick was scheduled for the week of April 4th. Rescheduled for the week of April 18th. Rescheduled for the week of April 25th. Rescheduled for the week of April 11th. And just yesterday scheduled for the week of April 25th. Even Ford doesn't know when they will build my truck.
This is why I don't want multiple emails on Scheduling. Just tell me when it's built. This would make me crazy, and I don't need to be any more crazy than I already am. 🤪
 
Sponsored

Delzona

2.5L Hybrid
Well-known member
First Name
Chris
Joined
Jul 3, 2021
Threads
11
Messages
4,378
Reaction score
9,209
Location
Tucson, AZ
Vehicle(s)
15 Breakout, 21 Road King Special, 22 Maverick XLT
Engine
2.5L Hybrid
My Maverick was scheduled for the week of April 4th. Rescheduled for the week of April 18th. Rescheduled for the week of April 25th. Rescheduled for the week of April 11th. And just yesterday scheduled for the week of April 25th. Even Ford doesn't know when they will build my truck.
I got the same ping-pong emails from Ford too. Must be supply issues again 🙄 😒
 

Cardsfan22

Member
First Name
Brenda
Joined
Jan 14, 2022
Threads
1
Messages
6
Reaction score
21
Location
Lakewood
Vehicle(s)
Nissan Rogue Dodge Dakota
I was told my Maverick is scheduled for May 16!! I have a Velocity Blue Lariat with lux pkg
 

JoshC

2.5L Hybrid
Well-known member
First Name
Joshua
Joined
Oct 4, 2021
Threads
7
Messages
62
Reaction score
125
Location
Pennsylvania
Vehicle(s)
2013 Ford Focus
Engine
2.5L Hybrid
Here’s hoping my 9/15 hybrid ,XLT lux package, co-pilot 360 order gets scheduled. Slim chance, I know because of all the constraints on my build.
 

davnau

2.5L Hybrid
Well-known member
First Name
Dave
Joined
Jul 29, 2021
Threads
6
Messages
206
Reaction score
370
Location
Barberton, OH, US
Vehicle(s)
'73 Ford Mustang
Engine
2.5L Hybrid
I was told my Maverick is scheduled for May 16!! I have a Velocity Blue Lariat with lux pkg
I finally got a VIN for my June 17 order of a Velocity Blue Maverick XL Hybrid with only a trailer hitch. No scheduled production date yet via email nor the online Ford trackers. Got the VIN from a call to Ford yesterday. From recent postings in another thread, it's looking like a lot of the outstanding June and July Hybrid orders are going to get built in May and June. I'm wondering if Ford is diverting some Hybrid parts from the Escape plant to the Maverick (plus the unique Maverick e-CVT) at Hermosillo to get some of these old orders built and shipped. In any case, glad to finally have a VIN for MY22! Looking forward to maybe a delivery by July 4, if I get lucky. Also will mean mine will have the upgraded firmware for the glowing cats and touch screen radio issues. All good!