Sponsored

Mainer

2.0L EcoBoost
Member
Joined
Aug 3, 2020
Threads
2
Messages
5
Reaction score
22
Location
Portland
Vehicle(s)
'16 JKU
Engine
2.0L EcoBoost
Maverick production will be scheduling this upcoming week of August 30 -- for build weeks 10/18 and 10/25.

Here's the full list of production week scheduling the upcoming week:

Production Week Scheduling - Week of August 30, 2021.webp
Production Week Scheduling - Week of August 30, 2021 (2).webp


Ford Maverick Maverick scheduling this upcoming week (of 8/30) for production build weeks 10/18 and 10/25 maverick-scheduling-august30
Sponsored

 
Last edited by a moderator:

adawalli

2.5L Hybrid
Well-known member
First Name
Adam
Joined
Jul 21, 2021
Threads
37
Messages
608
Reaction score
1,194
Location
North Carolina
Vehicle(s)
2017 Ford Explorer Platinum, 2010 Toyota Prius 3
Engine
2.5L Hybrid

NotAnonymous

2.5L Hybrid
Well-known member
Joined
Jun 9, 2021
Threads
2
Messages
871
Reaction score
1,257
Location
Indiana
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
Well, even though there is a near-zero chance of mine getting scheduled, I hope this is true for many members here!
 

zeketolliver

2.5L Hybrid
Well-known member
First Name
Jake
Joined
Apr 12, 2021
Threads
25
Messages
517
Reaction score
936
Location
Columbus, OH
Vehicle(s)
2023 Hyundai Tuscon NLine
Engine
2.5L Hybrid
Also, this points to Maverick scheduling taking a 2 week hiatus, vice actual production dates being pushed back another two weeks.

...as always, assuming this post tidbit is true.
 

Zezeka

Active member
First Name
Joe
Joined
Aug 5, 2021
Threads
9
Messages
35
Reaction score
124
Location
Great Mills, MD
Vehicle(s)
Dodge Grand Caravan
Maverick scheduling for week of August 30th

maverick-scheduling-august30.webp
This is so odd. I originally posted this thread, so how did your post replace mine?
 

Sponsored

OP
OP

Mainer

2.0L EcoBoost
Member
Joined
Aug 3, 2020
Threads
2
Messages
5
Reaction score
22
Location
Portland
Vehicle(s)
'16 JKU
Engine
2.0L EcoBoost
This is so odd. I originally posted this thread, so how did your post replace mine?
I think I posted it first in the wrong section and seems threads got merged.
 

Hdang1980

2.5L Hybrid
Well-known member
Joined
Aug 14, 2021
Threads
17
Messages
958
Reaction score
1,783
Location
Elk Grove, CA
Vehicle(s)
2022 Ford Maverick Hybrid
Engine
2.5L Hybrid
Ah yes... Let another round of scheduling foreplay commence. Excuse me while I choose which animal to offer as a blood sacrifice to the scheduling gods.
 

Zezeka

Active member
First Name
Joe
Joined
Aug 5, 2021
Threads
9
Messages
35
Reaction score
124
Location
Great Mills, MD
Vehicle(s)
Dodge Grand Caravan
I think I posted it first in the wrong section and seems threads got merged.
That makes sense. It’s honestly not a big deal. I’m just happy that the info is out there.
 

BDennis

2.5L Hybrid
Well-known member
First Name
Bruce
Joined
Jun 29, 2021
Threads
43
Messages
802
Reaction score
873
Location
So Cal
Vehicle(s)
2022 Maverick hybrid & E450 Leprechaun
Engine
2.5L Hybrid
So they skipped a few weeks of emails, but scheduled the next week so really no manufacturing time was missed. I received a scheduling email on 8/12 for a build week of 10/11. Emails coming out next Thursday are for build week of 10/18.
 

BDennis

2.5L Hybrid
Well-known member
First Name
Bruce
Joined
Jun 29, 2021
Threads
43
Messages
802
Reaction score
873
Location
So Cal
Vehicle(s)
2022 Maverick hybrid & E450 Leprechaun
Engine
2.5L Hybrid
Also, this points to Maverick scheduling taking a 2 week hiatus, vice actual production dates being pushed back another two weeks.

...as always, assuming this post tidbit is true.
The emails coming out next week are for scheduling the week of 10/18. My scheduling email arrived 8/12 for build the week of 10/11. No build hiatus based on this other than a hiatus of email for a few weeks.
 
Sponsored

brnpttmn

2.5L Hybrid
Well-known member
Joined
Aug 12, 2021
Threads
1
Messages
1,213
Reaction score
1,955
Location
MN
Vehicle(s)
Maverick Hybrid
Engine
2.5L Hybrid
The emails coming out next week are for scheduling the week of 10/18. My scheduling email arrived 8/12 for build the week of 10/11. No build hiatus based on this other than a hiatus of email for a few weeks.
I think this was pretty much expected. My assumption is they took a break to clean up some stuff (particularly the 4K / FWD issue).
 
Last edited:

dldsm7

2.5L Hybrid
Well-known member
First Name
Dan
Joined
Jun 21, 2021
Threads
3
Messages
124
Reaction score
168
Location
Charleston
Vehicle(s)
2012 Subaru Outback
Engine
2.5L Hybrid
Ah yes... Let another round of scheduling foreplay commence. Excuse me while I choose which animal to offer as a blood sacrifice to the scheduling gods.
I removed the spray in liners in my two builds so I am sure I will get scheduled with my June dates.
Pls.
 

BDennis

2.5L Hybrid
Well-known member
First Name
Bruce
Joined
Jun 29, 2021
Threads
43
Messages
802
Reaction score
873
Location
So Cal
Vehicle(s)
2022 Maverick hybrid & E450 Leprechaun
Engine
2.5L Hybrid
Out of curiosity....how many units are assembled daily from this Ford facility in Mexico?
Max capacity is 385,000 units a year, but remember Maverick is not the only vehicle they make there.
 

BDennis

2.5L Hybrid
Well-known member
First Name
Bruce
Joined
Jun 29, 2021
Threads
43
Messages
802
Reaction score
873
Location
So Cal
Vehicle(s)
2022 Maverick hybrid & E450 Leprechaun
Engine
2.5L Hybrid
I think this was pretty much expected. My assumption is they took a break to clean up some stuff (particularly the 4K / FWD issue).
There is no break in manufacturing, just in email notifications.
Sponsored

 
 







Top