- First Name
- Matt
- Joined
- Dec 19, 2021
- Threads
- 47
- Messages
- 2,149
- Reaction score
- 2,520
- Location
- Abilene Tx
- Vehicle(s)
- 94 Silverado , 07 mustang, 69 barracuda
- Engine
- 2.0L EcoBoost
- Banned
- #1,831
My build week went from august 8th to august 1st to august 15th. All in a matter of about 6 weeks. Fairly straightforward, it's a silver XLT, AWD, 4K, with FS spare, and in cab 400W power inverter. That's it. No constraint items. Maybe it was pushed back a little bit to get to the people who have been waiting since before my december order date.
Sponsored
Last edited: