Sponsored

Lone Star Proud

2.5L Hybrid
Well-known member
First Name
William
Joined
Aug 31, 2021
Threads
17
Messages
593
Reaction score
1,470
Location
Central Texas
Vehicle(s)
Ford Maverick XLT
Engine
2.5L Hybrid
Small world I work in small olde Lockhart, I'm glad you got scheduled, I contacted Lockhart motor company in October and was turned away from placing and order. So I took my money elsewhere. I have seen quite a few mavs running around here.
I have yet to see one anywhere on the road or around town.
Sponsored

 

Toni

Member
First Name
Toni
Joined
Jan 23, 2022
Threads
0
Messages
5
Reaction score
0
Location
Belle Vernon, Pa
Vehicle(s)
Jeep
I ordered my maverick 11-23-2021, I put it on Order List and Stats and I do not see, or have heard anything on my truck. Any news?
 

MikeInFla

Well-known member
First Name
Mike
Joined
Jan 25, 2022
Threads
2
Messages
123
Reaction score
217
Location
Panama City, FL
Vehicle(s)
2000 Ford Ranger, 2016 VW Passat, 2017 VW Beetle
That tonneau cover is hurting your chances and possibly the vault. I remember if floormats were on the constraints list anymore.
I was told the other day by my dealer to drop the tonneau cover and the swing tool box. When I asked about floor mats she said they were fine as was the drop in tray liner. They said they can order a cover and get it in 3-5 days for me so I will do that.
 

Imlooney

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Dec 2, 2021
Threads
5
Messages
77
Reaction score
117
Location
Kearny, AZ
Vehicle(s)
Maverick Hybrid
Engine
2.5L Hybrid
As near as I can figure, build dates are 8 months out from order date. My order date was 11/4 so I'm not getting excited until June.
 

Mspi

2.5L Hybrid
Well-known member
First Name
Mspi
Joined
Jan 27, 2022
Threads
8
Messages
56
Reaction score
100
Location
Texas
Vehicle(s)
2022 Lariat Maverick
Engine
2.5L Hybrid
That tonneau cover is hurting your chances and possibly the vault. I remember if floormats were on the constraints list anymore.
I am really afraid to change and drop the tonneau cover, I have skeptical feelings that my dealership wont do something right and screw it up were i get out of line up.. I do know im priority 02 but wont that mess that up and go back to priority 10
 

Sponsored

Mspi

2.5L Hybrid
Well-known member
First Name
Mspi
Joined
Jan 27, 2022
Threads
8
Messages
56
Reaction score
100
Location
Texas
Vehicle(s)
2022 Lariat Maverick
Engine
2.5L Hybrid
ok i just callled Dealership and dropped the Tonneau cover i hope it didnt mess up priority code 02 LOL... and put me back at 10.. I told them to try to put me back at 02.
 

Kameron512

Well-known member
First Name
Kameron
Joined
Mar 4, 2022
Threads
0
Messages
59
Reaction score
99
Location
Texas
Vehicle(s)
Maverick lariat hybrid lux cp360
I have yet to see one anywhere on the road or around town.
Really? I been seeing a VB and a white XL on 183. I even saw an XL on a hauler going south on 183 which I assumed was going to the dealer. Did they contact you when they got one in so you could go see it?
 

Lone Star Proud

2.5L Hybrid
Well-known member
First Name
William
Joined
Aug 31, 2021
Threads
17
Messages
593
Reaction score
1,470
Location
Central Texas
Vehicle(s)
Ford Maverick XLT
Engine
2.5L Hybrid
Really? I been seeing a VB and a white XL on 183. I even saw an XL on a hauler going south on 183 which I assumed was going to the dealer. Did they contact you when they got one in so you could go see it?
Yes. I have seen one at the dealer but never one on the road or parked somewhere. Hope to get this one by mid May.
 

MaveRicky

Member
First Name
Rick
Joined
Sep 8, 2021
Threads
2
Messages
9
Reaction score
20
Location
NJ
Vehicle(s)
mazda 3
No have not received any emails. My email address is confirmed in Ford's system. But at least I can track it. I work at the Ford dealership, so I know there will be no funny business.
 
Sponsored

Xbbqpitmaster

2.5L Hybrid
Well-known member
First Name
Bill
Joined
Dec 21, 2021
Threads
11
Messages
377
Reaction score
376
Location
Full Time Gypsy
Vehicle(s)
2023 Kia Seltos S
Engine
2.5L Hybrid
Another week, and another no-show email.
 

Dadmezz

2.5L Hybrid
Well-known member
Joined
Nov 16, 2021
Threads
5
Messages
331
Reaction score
323
Location
Akron, Ohio
Vehicle(s)
Subaru
Engine
2.5L Hybrid
As near as I can figure, build dates are 8 months out from order date. My order date was 11/4 so I'm not getting excited until June.
Yep, 11/3 here.
 

Peps

2.5L Hybrid
Well-known member
Joined
Jul 22, 2021
Threads
29
Messages
366
Reaction score
404
Location
New England USA
Vehicle(s)
2020 Volvo XC40
Engine
2.5L Hybrid

THE PRODUCTION DATE FOR YOUR VEHICLE HAS CHANGED


Just got an email from Ford 8 PM friday 3/4 telling me that the production date was moved a week earlier to April 11th.
As someone that has been waiting since July, I writing this to say that maybe Ford is improving its supply chain & production capacity.... so stick around a bit longer my fellow maverick without a production date; soon will come for you too.
I have on order a hybrid xlt lux 360..

We have made an adjustment to the production date for your 2022 Maverick XLT.
Your vehicle is now scheduled to be built the week of April 11, 2022. We will continue to keep you informed regarding your vehicle's production status
Sponsored

 
 




Top