THIS.As a former call center slave, please don't share their email address
Sponsored
THIS.As a former call center slave, please don't share their email address
Mine was supposed to have been built on September 23One way that this would be confirmed is if forum folks who have their hybrid build but not shipped start posted they're getting shipping dates!
Here is @fordvideoguy Youtube Videos site:Hope the approval is true, but I won't believe it until the OKTB is announced by @fordvideoguy
THE PRODUCTION DATE FOR YOUR VEHICLE HAS CHANGED. |
Dear Steven We have made an adjustment to the production date for your 2022 Maverick LARIAT. Your vehicle is now scheduled to be built the week of December 6, 2021. We will continue to keep you informed regarding your vehicle's production status. Thank you. FE Area 51 Hybrid Order confirmed by Ford 6/30 Original schedule was for Dec. 12 |
Have mercy on her poor soul guys.As a former call center slave, please don't share their email address as it really isn't this person's responsibility to be the POC for all things Maverick. Maybe they took initiative to find out more information and maybe they shared more than they possibly should normally to ease tensions. I'd hate for someone to hate-call/email this person because they "lied" about the epa stuff or something.
I'm a regular follower of the Tuesday night episodes.Here is @fordvideoguy Youtube Videos site:
Long McArthur
If this news is valid he will post a new video otherwise on Tuesday evenings he has a live stream where I am sure he will bring it up.
Gotta upgrade to the Doctor Frankenstein package and the smoker's add-on for that.Have mercy on her poor soul guys.
The Flex-Bed does not include a Torches and Pitchfork Compartment w/DIY 12V Ingiter after all.
Knowing that order date is not the only factor determining production schedule, when was your order created?
THE PRODUCTION DATE FOR YOUR VEHICLE HAS CHANGED. Dear Steven
We have made an adjustment to the production date for your 2022 Maverick LARIAT.
Your vehicle is now scheduled to be built the week of December 6, 2021. We will continue to keep you informed regarding your vehicle's production status.
Thank you.
FE Area 51 Hybrid
Order confirmed by Ford 6/30
Original schedule was for Dec. 12
Thanks for the information from Customer Service.1st Post, previous interaction was solely as a stalker, lurking...
The 800-334-4375 Ford Marketing # is a valid option, just requires patience. Eventually spoke with Cassie, who is (unofficially) The Maverick Specialist, who provided a wealth of information:
* The EPA Certifications causing the Hybrid delays have been received, opening up the floodgates to release the Marevicks previously built and begin the build the Mavericks previously ordered. Cassie said this information is suitable for publication. Done!
* She confirmed that the Spray In Liner REMAINS as an option for the Lariat Lux Package AND that there was a November 10 cutoff for the XLT Lux Package to receive a Spray In Liner.
* 9-21 was the receipt date of the Ford confirming email I received ('you're in our system, Scheduled For Production will be the next benchmark you'll receive from Ford').
* Cassie confirmed this Carbonized Gray Hybrid Lux Package Lariat with my name on it is in the Ford system, which means my Dealer Salesman did well...
* I am in queue, just like I've been since September.
*Groundhog Day 2022 is the current over/under for the date this Maverick will be driven off the lot. I'm taking the 'under'.
On to the day. Take care.
Never! We, the September orders, shall never let anything diminish our hope! (Unless we have to wait as long as the June orders)Take the Over, odds are better on the Over with a Sept. order date
Can you give some ideas of what prevents a car from being OKTB? Is it something as simple as "we don't have x product to do the finishing touch" or is it more about regulations being cleared since the hybrid isn't 1:1 with the ecoboost?Thanks for the information from Customer Service.
I do want everyone to know that there is a difference between EPA Certifications released and OKTB. Ford told us (I released a video) on October 21 that EPA was released giving us those numbers but Ford said that there is still some work that needs to be done before they can be released from the factory to ship to dealers (OKTB).
Any idea when the OKTB is?Thanks for the information from Customer Service.
I do want everyone to know that there is a difference between EPA Certifications released and OKTB. Ford told us (I released a video) on October 21 that EPA was released giving us those numbers but Ford said that there is still some work that needs to be done before they can be released from the factory to ship to dealers (OKTB). But now that we have EPA numbers the factory will open up the "floodgates" to build more hybrid which is why we (Long McArthur) saw 20 allocations (0 hybrids) in October and seeing 118 allocations in November. We should see a bunch more hybrids scheduled for January production.
Another thing I noticed is that the Drop-in Bedliner (DIBL) change on the XLT Luxury Package happened sometime between 11/1 and 11/6, not 11/10. Just to clarify for those with those orders. Look at your order sheet and you will see one or the other on the sheet as part of that package. That is what will be built on your order. As confirmed by the Brand Manager, orders submitted before the change will still have Spray-in Bedliner (SIBL).
Thank you to the OP for posting, don't be shy to post, we love getting all the details we can on the Maverick. I just wanted to clarify information I have for those that don't get a chance to watch the weekly live stream or my Maverick videos.