- Joined
- May 29, 2024
- Threads
- 29
- Messages
- 7,174
- Reaction score
- 12,003
- Location
- Central Nevada & Utah
- Vehicle(s)
- Maverick XLT Hybrid
- Engine
- 2.5L Hybrid
YepThey ain't shutting down the assembly line. Keep building, fix later.
That's exactly the process Ford used when building the B24 Liberator at Willow Run during World War II. The government kept coming back with changes to the B24. Ford said, they aren't going to stop the assembly line for those changes, they'll make the changes at a different facility after the plane was built.
Sponsored
