Can Ford Actually Build All These MY22 Mavericks?

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
8
Messages
2,494
Reaction score
4,367
Location
GA
Vehicle(s)
2024 XLT Hybrid & 2024 Tesla M3P
Engine
2.5L Hybrid
I also ordered Lariat Lux Hybrid 10/13/2021

Scheduled 8/22
Pushed to 8/29
Pushed to 9/5
Production day 9/7
"In Production" with window sticker 9/1
Sponsored

 

Lou'sBluMav

2.5L Hybrid
Well-known member
First Name
Lou
Joined
Jun 14, 2022
Threads
5
Messages
131
Reaction score
112
Location
Upstate SC
Vehicle(s)
2004 Chevy Colorado(sold Oct) 2018 Subaru Forester
Engine
2.5L Hybrid
Recall they made 25880 MY'22 Mavericks in 2021. Together with the 61059 thru end of Aug that totals to nearly 87000. So IF they can hold to the 2022 avg of ~7632 per month for the next 2.8 months that would get to about 108000 by the announced model changeover date. So FORD could actually meet the Model '22 announced production.

Now that the regional scheduling for MY '22, is over, the plant will take over the actual scheduling according to parts in hand the week before build.

My question is how close to one's VIN # is the actual production order? If it's close, then one should be able to estimate one's build date.

Note that given FORD sold out the '22 Mavericks with virtually NO advertising, NO sales brochures, NO floor samples, and that the changeover is on the same day: anyone expecting any substantial physical changes in the Maverick, other than the announced color changes and at some point (after the converted '22 to '23 s are built) the Tremor, might be making the wrong bet.











vin
 

CasaKarl

Member
First Name
Karl
Joined
Dec 19, 2021
Threads
0
Messages
17
Reaction score
7
Location
Hereford AZ
Vehicle(s)
Chevy Avalanche, Toyota RAV4, Ford CMax
I hope not. My Lariat hybrid with lux package is scheduled for the week of 19
September.
Get ready for a "BUMPy" ride through the calendar. Mine was 8/22, 8/29, 9/19 and now (supposedly) 9/26.... It is what it is, unfortunately.... + dont expect to have Ford keep you up to date on the status. I have to check weekly with my dealer for the updates. Ford sucks at communication and scheduling - I know its all about availability of parts, but how does that screw up their ability to communicate?
 

Kath

2.5L Hybrid
Well-known member
First Name
Kath
Joined
Oct 26, 2021
Threads
2
Messages
50
Reaction score
52
Location
Arizona
Vehicle(s)
Maverick
Engine
2.5L Hybrid
I hope not. My Lariat hybrid with lux package is scheduled for the week of 19
September.
My lariat luxury was also scheduled for Sept but then the schedule disappeared and it went back to “order received.” I still have a VIN showing on the page.
 

Iraj

New member
First Name
Ira
Joined
Feb 15, 2022
Threads
0
Messages
1
Reaction score
0
Location
34292
Vehicle(s)
2012 Camry XLE
I have a Hybrid XLT ordered on 10/15/2021. I was given an August 15 build date, and have been pushed back three times so far to a 9/5 build date. I have been waiting all week for the email pushing me back to 9/12...haven't gotten it yet.
I ordered my Lariat hybrid 8/11/2021. I took delivery 8/1/2022, just 10 days shy of one year after ordering it. Now have 2030 miles on it. Getting over 44 mpg average. Worth the wait.
 

Sponsored

Richfrommo

2.0L EcoBoost
Active member
First Name
Richard
Joined
Dec 11, 2021
Threads
1
Messages
31
Reaction score
4
Location
Missouri
Vehicle(s)
Ford Maverick
Engine
2.0L EcoBoost
Maverick production ought to get really "interesting" between now and the end of the year. Based on everything I see on this forum, it seems typical for people to be bumped back 4-5 week from the original build date until their truck finally goes into production.

I just got scheduled this week for the week of 11/7, which is SUPPOSED to be the final week of MY22 Maverick production. However, considering that multiple push back are common, what are the odds Ford actually finishes MY22 Maverick production the week of 11/7? Let's just say I wouldn't bet big money on it.

And if they CAN'T get all the VINs they've assigned built by then, how long do they extend My22 production? I mean, at that point there will only be 7 weeks left in the calendar year. Ford can't build MY22 Mavericks in calendar year 2023!

Finally, what does all this mean for MY23 Mavericks? Will Ford again delay opening of order banks? Or will they. just delay the time before they actually start scheduling and building 23s?
My Eco-boost with luxury pkg & co-pilot is supposed be locked in on build date of 09/06/22 with ETA of 09/10/ to 09/15 hopefully that is true but can’t see how it can be built & delivery to Columbia,Mo that soon. Been pushed back several times but dealer tells me it’s locked in now. See if it goes to production tomorrow…
 

Timothyd

2.5L Hybrid
Well-known member
First Name
Tim
Joined
Nov 10, 2021
Threads
52
Messages
4,134
Reaction score
3,529
Location
Illinois
Vehicle(s)
Buick Encore, Miata, motorcycles
Engine
2.5L Hybrid
Clubs
 
Definitely could be true. It makes sense, but could be one more week. I think the goal is that all existing 22 vins be delivered before 2023. Getting a 22 brand new in 2023 just rings of bad publicity. Of course it's just speculation and anything could change and has all year.
Two days ago I got scheduled for 10/31. That's cutting it close.
 

MarkiNovi

2.5L Hybrid
Active member
First Name
Mark
Joined
Sep 13, 2021
Threads
0
Messages
37
Reaction score
33
Location
Novi, MI
Vehicle(s)
2019 Explorer Sport Trac
Engine
2.5L Hybrid
I don't think there is a 9/12 build week in play. My 9/5 hybrid got bumped to 9/19 yesterday. Hope yours goes through next week though. 2022 is the year of living dangerously.
My Hybrid XLT with Lux pckg and sibl is scheduled for the day of 9-14
 

Sk17kp36

2.5L Hybrid
Active member
First Name
Steve
Joined
Sep 27, 2021
Threads
2
Messages
33
Reaction score
28
Location
New Albany. IN
Vehicle(s)
94 Chevy C1500
Engine
2.5L Hybrid
My Iconic Silver Mettalic hybrid XLT was ordered on 9/20/21 with Lux pkg, SIBL, moonroof and rear manual windows, and CP-360. Ford customer service told me 2 weeks ago it is scheduled to be built the week of 10/3, VIN, and delivery ETA around 11/5. Keep the faith friends.
 
Sponsored

BoskoPColtrane

2.5L Hybrid
Well-known member
First Name
Bosko
Joined
Jul 14, 2022
Threads
3
Messages
546
Reaction score
441
Location
California
Vehicle(s)
Maverick
Engine
2.5L Hybrid
why are you so fixated on Negative "what if's" right now? Let the screwy process play itself out- there's nothing any of us buyers waiting for our trucks to be built can do to speed up or change the way it's going to play out :(

It's still SUMMER man! Get outside and enjoy it before Winter gets here :cool:
I think it’s because we have been waiting soo long to get our trucks. I am currently waiting on the chip hold, again. I’m going on 15 months, while people who ordered 3-4 months after me, the same package, have received their trucks. It’s not the product but the process that is bringing on so much negativity.
 

Old Ranchero

2.0L EcoBoost
Well-known member
Joined
Apr 1, 2021
Threads
26
Messages
2,587
Reaction score
3,511
Location
CO
Vehicle(s)
2018 F-150 2013 Jeep Grand Cherokee 2022 Maverick
Engine
2.0L EcoBoost
I think it’s because we have been waiting soo long to get our trucks. I am currently waiting on the chip hold, again. I’m going on 15 months, while people who ordered 3-4 months after me, the same package, have received their trucks. It’s not the product but the process that is bringing on so much negativity.
What Process?
 

MCF_USCG

2.5L Hybrid
Member
First Name
Steven
Joined
Mar 20, 2022
Threads
0
Messages
7
Reaction score
0
Location
Phoenix, AZ
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
Well, it will really stink if they build my truck in November, stick in a parking lot on chip hold for my luxury package and then I don't get my MY22 truck until March of 2023!
I ordered my Hybrid Lariat in Nov 2021 and I’m hoping to see something by Feb 2023
 

Grozk72

2.0L EcoBoost
Well-known member
First Name
Dennis
Joined
Jan 30, 2022
Threads
4
Messages
112
Reaction score
120
Location
SWMO
Vehicle(s)
Santa Cruz, Cayman, Mroadster
Engine
2.0L EcoBoost
My VIN (found out Friday) is B11xxx which I think corresponds to 110xxx and has a current build date of 10/31. So looks like they plan on completing >110K for the MY 2022