Sponsored

John Shutka

New member
First Name
John
Joined
Jul 21, 2021
Threads
0
Messages
2
Reaction score
0
Location
Hammond Indiana
Vehicle(s)
2022 maverick
Ordered June 9 XLT haven't heard a thing cept now getting cup holder upgrade thrown in
 

Philemon

2.0L EcoBoost
Well-known member
First Name
Kyle
Joined
Jan 3, 2022
Threads
6
Messages
97
Reaction score
94
Location
UP Michigan
Vehicle(s)
2022 Maverick XLT FX4
Engine
2.0L EcoBoost
Yes I did. Was busy all day, just got back on.
Ordered mine at Soo Motors, just picked up an Explorer for the wife there. Nice people but I don't think they get many more allocations than Mackinac Sales. Seems like Mackinac getting blasted on google with 1 star reviews for their service dept.
 

2cafn8d

2.5L Hybrid
Well-known member
First Name
Monica
Joined
Jun 21, 2021
Threads
35
Messages
997
Reaction score
2,137
Location
Huntington Beach CA
Vehicle(s)
2022 Maverick XLT
Engine
2.5L Hybrid
Clubs
 
@Delzona gave me the email addresses. I emailed on Monday, got a response on Tuesday asking for details on my order and was told they would check with the plant.

Let me suggest as you write...

Don't be angry, don't flip out. Be kind and professional in your words and express your disappointment.

Best of luck to everyone! I hope they schedule us all very soon.
 

JesTr

2.0L EcoBoost
Well-known member
First Name
Jesse
Joined
Jul 31, 2021
Threads
3
Messages
54
Reaction score
160
Location
Kentucky
Vehicle(s)
2010 Ford Focus SEL
Engine
2.0L EcoBoost
It's not impossible but time is ticking. I got my build date last week for last week of April. My order was from a very small dealer that changed ownership since I ordered. I also had constrained items (tonneau cover, spray-in liner). The way I figure, they are filling all the Jun, Jul, Aug orders. It can happen, have hope.
 

Sponsored

Vols44

2.5L Hybrid
Well-known member
Joined
Sep 19, 2021
Threads
0
Messages
755
Reaction score
721
Location
Missouri
Vehicle(s)
2018 Edge
Engine
2.5L Hybrid
Since nothing is improbable with Ford. I'd like to see how they compensate any unscheduled or built June orders. A 3k private offer would be a starting point.

When it gets down to the last few weeks I wonder which orders will be pushed so constrained items can be installed on FE's.
 

MightyNando

Well-known member
First Name
Fernando
Joined
Nov 6, 2021
Threads
0
Messages
62
Reaction score
104
Location
Albuquerque
Vehicle(s)
2005 Chevy Silverado, sounds like it's giving up.
Seriously hoping I get my email saying I'm up to be built.. 11 months waiting is enough...

Original order date June 14
Hybrid XLT, sibl, lux pkg, 360.
I feel yeah bro not a June order though but August 10 is a long wait to. I feel this is going too be your week good luck and good vibes!!
 

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
8
Messages
2,494
Reaction score
4,367
Location
GA
Vehicle(s)
2024 XLT Hybrid & 2024 Tesla M3P
Engine
2.5L Hybrid
Since nothing is improbable with Ford. I'd like to see how they compensate any unscheduled or built June orders. A 3k private offer would be a starting point.
Don't hold your breath on them compensating you for production delays due to constraints.
 

Kpettrey

Member
First Name
Kevin
Joined
Jan 10, 2022
Threads
0
Messages
7
Reaction score
17
Location
Virginia
Vehicle(s)
Maverick Lariat Hybrid
I was scheduled for 4/18, then bumped up to 4/11, now back to 4/18. We will see if it really happens. Anxious to see the delay between build and delivery.
 

onetequilatwo

2.5L Hybrid
Well-known member
First Name
Steve
Joined
Oct 29, 2021
Threads
15
Messages
859
Reaction score
676
Location
Massachusetts
Vehicle(s)
2022 Hybrid Lariat Maverick and 2019 RAV4
Engine
2.5L Hybrid
Read this thread with interest every week. It gives me a view into the status of things and if I'll take delivery in the range of Aug-December.

It is my extreme hope, that EVERYONE, who ordered in June and July is scheduled by April 28th. Then hoping August orders by June 23rd. September orders by August 4th and then my order month October by September 29th. Be interesting how things flow and how these quesses have to change if the guess dates miss.
 
Sponsored

Rickydragon

2.0L EcoBoost
Well-known member
Joined
Oct 29, 2021
Threads
8
Messages
171
Reaction score
192
Location
North America
Vehicle(s)
2.0 Eco AWD Lux Pack 4K Tow Shadow Black
Engine
2.0L EcoBoost
Read this thread with interest every week. It gives me a view into the status of things and if I'll take delivery in the range of Aug-December.

It is my extreme hope, that EVERYONE, who ordered in June and July is scheduled by April 28th. Then hoping August orders by June 23rd. September orders by August 4th and then my order month October by September 29th. Be interesting how things flow and how these quesses have to change if the guess dates miss.
I think if they ship without chips you will see them sooner than that. Tim Bartz said if there were no constraints Ford could build all the Mavericks.
 

onetequilatwo

2.5L Hybrid
Well-known member
First Name
Steve
Joined
Oct 29, 2021
Threads
15
Messages
859
Reaction score
676
Location
Massachusetts
Vehicle(s)
2022 Hybrid Lariat Maverick and 2019 RAV4
Engine
2.5L Hybrid
I think if they ship without chips you will see them sooner than that. Tim Bartz said if there were no constraints Ford could build all the Mavericks.
I'm hoping for them shipping without some chips, but there should be an option for those to opt out and get bumped to MY23.
 

Maryd

Active member
First Name
Mary
Joined
Sep 15, 2021
Threads
2
Messages
40
Reaction score
93
Location
Florida
Vehicle(s)
Edge
Seriously hoping I get my email saying I'm up to be built.. 11 months waiting is enough...

Original order date June 14
Hybrid XLT, sibl, lux pkg, 360.
I am not far behind you with a July 21 order. Hopefully all June and July orders get an email soon!
 

donbreiner

2.5L Hybrid
Well-known member
First Name
Don
Joined
Jun 26, 2021
Threads
30
Messages
244
Reaction score
286
Location
Springfield, IL
Vehicle(s)
2018 Tesla Model 3 Long Range, 2022 Ford Maverick
Engine
2.5L Hybrid
Seriously hoping I get my email saying I'm up to be built.. 11 months waiting is enough...

Original order date June 14
Hybrid XLT, sibl, lux pkg, 360.
Mavrick Lariat, Hybrid, Rapid Red, Lux Pkg, CoPilot 360, First Edition, ordered 7/26/21. Still waiting, hope we both get scheduled this week Thursday.
Sponsored

 
 







Top