Sponsored

DELAYED...,

Glenn

2.0L EcoBoost
Member
First Name
[email protected]
Joined
Sep 3, 2021
Threads
4
Messages
14
Reaction score
3
Location
Kentucky
Vehicle(s)
Escape, focus, mustang
Engine
2.0L EcoBoost
A month ago I received email saying my Lariat is scheduled for production week of Sept 5th, also got a VIN. Yesterday I received email saying production pushed back a week to Sept 12th. Anyone else get this? I wonder if it will get pushed back again
Sponsored

 

pa-outdoorsman

2.0L EcoBoost
Well-known member
Joined
Jan 26, 2022
Threads
120
Messages
2,190
Reaction score
4,651
Location
PA
Vehicle(s)
2022 Maverick XLT, EB, LUX, FX4, 4K, Cactus Gray
Engine
2.0L EcoBoost
Clubs
 
It is common for people's build dates to get move forward and back, often multiple times, before your truck is actually built. Based on hundreds of others who have posted the same thing on these forums, I would not worry about it...
 

Clive

2.5L Hybrid
Well-known member
Joined
Oct 22, 2021
Threads
10
Messages
309
Reaction score
439
Location
Los Angeles
Vehicle(s)
2022 Maverick XLT 2.0
Engine
2.5L Hybrid
Be thankful that it was only one week (so far). I was also initially scheduled for the week of 9/5. I was informed of the schedule via chat on 7/15, and then received the email with the same estimate on 8/18. But then last week I contacted customer service and they informed me that my build week was now pushed back to 9/26.

I have yet to receive the email from Ford notifying me of the change.
 

swmetal

2.0L EcoBoost
New member
First Name
Tobin
Joined
Feb 4, 2022
Threads
0
Messages
4
Reaction score
2
Location
Florida
Vehicle(s)
C8
Engine
2.0L EcoBoost
A month ago I received email saying my Lariat is scheduled for production week of Sept 5th, also got a VIN. Yesterday I received email saying production pushed back a week to Sept 12th. Anyone else get this? I wonder if it will get pushed back again
I got similar email about a month ago with a 9/5 build date, last week I Chatted with Ford and it was pushed to 9/16. Chatted with Ford yesterday and now its 9/25.
 

Ron Neal

2.0L EcoBoost
Well-known member
First Name
Ron
Joined
Apr 4, 2021
Threads
24
Messages
808
Reaction score
1,187
Location
SC
Vehicle(s)
Sold Ranger
Engine
2.0L EcoBoost
Yep, just talked to Ford and so far I went from 9/12 to 9/5 to 9/19 and today they said 9/26.
At least I have a VIN and a build month so no big worries but shifting dates is getting old.
I need to sell my current truck but can't do that until I get this one.
 

Sponsored

JazzyJockJeffcoat

2.5L Hybrid
Well-known member
Joined
Oct 11, 2021
Threads
0
Messages
99
Reaction score
140
Location
MD
Vehicle(s)
Chevy
Engine
2.5L Hybrid
Welcome to the scheduling dance, it seems like the average is around 3 to 5 reschedules.
 

hopsnbarley91

2.5L Hybrid
Well-known member
First Name
Aaron
Joined
Sep 27, 2021
Threads
1
Messages
158
Reaction score
178
Location
St. Louis, MO
Vehicle(s)
2014 Toyota Sienna, 2022 Ford Maverick XL
Engine
2.5L Hybrid
Clubs
 
Welcome to the scheduling dance, it seems like the average is around 3 to 5 reschedules.

Can confirm. I was originally scheduled for the week of June 20th. I finally just got my "built" status today.
 

projectvortex

Well-known member
Joined
Oct 19, 2021
Threads
2
Messages
880
Reaction score
1,597
Location
.
Vehicle(s)
.
Engine
Undecided
A month ago I received email saying my Lariat is scheduled for production week of Sept 5th, also got a VIN. Yesterday I received email saying production pushed back a week to Sept 12th. Anyone else get this? I wonder if it will get pushed back again
I do believe that everyone who ordered a Mav is getting them built during the promised week, if not before.

Picked a bad day to stop (start) drinking.
 
Sponsored

oilman300

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Oct 25, 2021
Threads
8
Messages
332
Reaction score
332
Location
Georgia
Vehicle(s)
2022 Velocity Blue XL Hybrid
Engine
2.5L Hybrid
A month ago I received email saying my Lariat is scheduled for production week of Sept 5th, also got a VIN. Yesterday I received email saying production pushed back a week to Sept 12th. Anyone else get this? I wonder if it will get pushed back again
My order was pushed back 4 times before it went into production.
 

day004

2.5L Hybrid
Active member
First Name
Dave
Joined
Sep 21, 2021
Threads
0
Messages
41
Reaction score
31
Location
Concord Ca
Vehicle(s)
2022 Ford Maverick Lariat Hybrid
Engine
2.5L Hybrid
I got my first build date back in May. Got a vin too. I've been rescheduled at least 5 times with the last being a "We got nothin" response. I'm loosing faith that I'll be driving a Ford this year. Might have to go look at the Santa Cruz.
 

Maverick2023

2.5L Hybrid
Well-known member
First Name
Kip
Joined
Oct 26, 2021
Threads
154
Messages
1,382
Reaction score
1,997
Location
Atlanta, GA
Vehicle(s)
Toyota Rav4
Engine
2.5L Hybrid
How close to your original build day do you get a push back email? My hybrid is scheduled o. 9/5 and I have not gotten any push back email. Does that mean I’m clear ?
 

hopsnbarley91

2.5L Hybrid
Well-known member
First Name
Aaron
Joined
Sep 27, 2021
Threads
1
Messages
158
Reaction score
178
Location
St. Louis, MO
Vehicle(s)
2014 Toyota Sienna, 2022 Ford Maverick XL
Engine
2.5L Hybrid
Clubs
 

Mikew555

2.0L EcoBoost
Well-known member
First Name
mike
Joined
Jun 4, 2022
Threads
6
Messages
109
Reaction score
62
Location
South Carolina
Vehicle(s)
ford maverick
Engine
2.0L EcoBoost
Yep, just talked to Ford and so far I went from 9/12 to 9/5 to 9/19 and today they said 9/26.
At least I have a VIN and a build month so no big worries but shifting dates is getting old.
I need to sell my current truck but can't do that until I get this one.
I did a very stupid thing! I sold my truck... I got to excited about a build date!
Sponsored

 
 







Top