Sponsored

Dealer States Can't Change Order After Placing

respi133

2.0L EcoBoost
Banned
Banned
Joined
Apr 8, 2022
Threads
7
Messages
286
Reaction score
218
Location
TX
Vehicle(s)
Maverick Maverick
Engine
2.0L EcoBoost
  • Thread starter
  • Banned
  • #1
Managed to get an 2023 XLT ordered on the last day, did a little more sleuthing and decided that Lariat will fit my needs better but the dealer is saying he "probably won't be able to alter your order - once it's in it's in."

Just curious if anyone else has run into this and how you managed to resolve with your dealer?
Sponsored

 

Jatrax

2.5L Hybrid
Well-known member
First Name
John
Joined
Jun 17, 2022
Threads
7
Messages
604
Reaction score
1,010
Location
PNW
Vehicle(s)
2023 VW ID.4
Engine
2.5L Hybrid
I believe that has been stated from several sources. After the book closes you cannot change the PEP code or the engine type.
 

JohnHartshorn

2.5L Hybrid
Well-known member
First Name
John
Joined
Jul 30, 2021
Threads
8
Messages
358
Reaction score
440
Location
Metro St Louis
Vehicle(s)
21 Toyota Sienna XSE - Mav Hybrid XLT LUX Area 51
Engine
2.5L Hybrid
Trim (XL, XLT, Lariat) & FWD/AWD/*AAWD (Tremor package) cannot be changed. EcoBoost to Hybrid cannot be changed. Hybrid to EcoBoost cannot currently be changed, but due to the severe constraint on Hybrid (35%) and the rumored number of orders (60+%), that may change.

* You may be able to remove the Tremor package, but you will not be able to add it.

Any of the add-ons, including LUX packages, can be changed at will up until either a VIN is assigned (Scheduled) or that item closes out.
 

Vols44

2.5L Hybrid
Well-known member
Joined
Sep 19, 2021
Threads
0
Messages
755
Reaction score
721
Location
Missouri
Vehicle(s)
2018 Edge
Engine
2.5L Hybrid
The only changes you cannot make (for now) are the body and PEP codes. It remains to been seen if you can change a 2.5L engine to a 2.0T and retain the original order date.
 

MostlySafeBear

2.5L Hybrid
Well-known member
Joined
May 29, 2022
Threads
18
Messages
523
Reaction score
689
Location
San Francisco, CA
Vehicle(s)
(Eventually) a Ford Truck
Engine
2.5L Hybrid
I read somewhere recently that your trim level choice and engine choice are locked in, so you're probably SOL on that.

On the other paw, maybe you could find someone with a Lariat that changed their minds, and arrange to do a like for like swap?

That person wouldn't be me, but you never know!
 

Sponsored

UberGadgetFreak

2.5L Hybrid
Well-known member
First Name
Joe
Joined
Jun 28, 2021
Threads
9
Messages
552
Reaction score
771
Location
Mt. Holly, NC
Vehicle(s)
03 Marauder, 21 Bronco, 22 Maverick
Engine
2.5L Hybrid
I made changes to mine after my order was in. My dealer noted as long as the change isn't changing trim level or engine/drivetrain configuration, its 'open season' until it gets a VIN for everything else.
 

crunchie_frog

2.0L EcoBoost
Well-known member
First Name
Todd
Joined
Sep 21, 2022
Threads
11
Messages
151
Reaction score
231
Location
Johnson City, TN
Vehicle(s)
2023 XLT 2.0 4K, 1999 & 2000 5.0 AWD Mountaineers
Engine
2.0L EcoBoost
Fwiw, I went back and forth between xlt and lariat and originally filled out the paperwork at the dealer on Saturday for a lariat because I thought it would have lane centering and ahead traffic speed control. After looking at what I ordered, I realized I needed to get the luxury with cp360 assist and I couldn’t talk myself up. I went back in on Tuesday and was able to change it to an xlt. I think I will like the xlt with 2.0 awd 4k. I am guessing you like the interior and the cp360 full package in the lariat? The seats are much nicer as well.
 
OP
OP

respi133

2.0L EcoBoost
Banned
Banned
Joined
Apr 8, 2022
Threads
7
Messages
286
Reaction score
218
Location
TX
Vehicle(s)
Maverick Maverick
Engine
2.0L EcoBoost
  • Thread starter
  • Banned
  • #8
Well that's pretty much it yeah thanks all!
Sponsored

 
 







Top