Ford Hermosillo Plant Shutdown

Anne in NC

2.5L Hybrid
Active member
First Name
Anne
Joined
Nov 18, 2022
Threads
0
Messages
28
Reaction score
13
Location
NC
Vehicle(s)
2006 Nissan Frontier; 2023 Ford Maverick
Engine
2.5L Hybrid
Is the plant shutdown the weeks of 8/7 & 8/14? No vehicles will be built during this time?
I haven't seen any news of shutdown since 2021, looking all over internet since I read your post.
Sponsored

 

Dmat

2.5L Hybrid
Well-known member
Joined
Oct 26, 2022
Threads
46
Messages
571
Reaction score
617
Location
Baton Rouge
Vehicle(s)
MAVERICK
Engine
2.5L Hybrid
Clubs
 
It was posted somewhere earlier in June but can not find it. However if you look at the scheduling e-mails from 6/15 which covered the period from 7/24 through 8/28 no one got scheduled for the weeks of 8/4 or 8/14
https://www.mavericktruckclub.com/forum/threads/📬-6-15-23-scheduling-email-received-group-emails-now-arriving.32957/
my original 7/31 scheduling eventually moved to 8/04, ive seen others with the tracker showing 8/05.


It has been showing ready for production, thats what i've been told the green dot indicates, but nothing has changed since 7/27.
 

MoveOver

2.5L Hybrid
Well-known member
First Name
Jan
Joined
Jun 16, 2023
Threads
3
Messages
75
Reaction score
61
Location
Rockville
Vehicle(s)
Maverick Hybrid
Engine
2.5L Hybrid

mattmckrell

2.5L Hybrid
Member
First Name
Matt
Joined
May 8, 2023
Threads
0
Messages
10
Reaction score
25
Location
Cary, NC
Vehicle(s)
Ford Escape, Toyota Highlander, Winnebago
Engine
2.5L Hybrid
Clubs
 
I've had the same numbers -- originally scheduled for week of 7/31, currently showing 8/4 with the green dot for "in production". However, the "last updated" changed to 8/4 today, and the modules have popped now!

Anyway, we're right in the same ballpark for where we are on the line. I think my build number is about 100 ahead of yours if I remember right.
 

Old Man

2.0L EcoBoost
Banned
Banned
First Name
Mike
Joined
Jan 6, 2023
Threads
6
Messages
1,332
Reaction score
1,731
Location
Nebraska
Vehicle(s)
2023 Lariat
Engine
2.0L EcoBoost
On July 14th @Automate said the plant would be shutdown the weeks of 8/7 and 8/14. Somebody could go to the Hermosillo plant Facebook page and see if they have it listed there.
 

Sponsored

Grammaton

2.0L EcoBoost
Active member
First Name
Ross
Joined
Mar 16, 2023
Threads
2
Messages
34
Reaction score
28
Location
Covina, CA
Vehicle(s)
2023 Ford Maverick AWD Lariat BAP 4K CP360+Assist
Engine
2.0L EcoBoost
What does thos site tell you? I entered VIN, but the file that downloaded I couldn't open
The list populates below the download button...no need to download just left click highlight all the BCE Module codes and highlight to copy (Ctrl+C) and paste (Crtl+V) into a Word Doc. Or screenshot the codes you need.
 

Automate

2.5L Hybrid
Well-known member
Joined
Jul 21, 2021
Threads
60
Messages
1,798
Reaction score
2,135
Location
Atlanta GA, USA (ATL)
Vehicle(s)
Fusion Hybrid, Mav XL Hybrid
Engine
2.5L Hybrid

garryjohnson

2.0L EcoBoost
Well-known member
First Name
Garry
Joined
Jan 2, 2022
Threads
16
Messages
300
Reaction score
356
Location
Pensacola, FL
Vehicle(s)
Ford Maverick XLT FX4 Atlas Blue
Engine
2.0L EcoBoost
Clubs
 
I just checked and the status of my build (scheduled 7/31 with 8/02 build day) and still says in production, not built. However, the modules are live, so it obviously is built. I think the scheduling tracker takes a few days to catch up. I will check again Monday.
 
Sponsored

Dmat

2.5L Hybrid
Well-known member
Joined
Oct 26, 2022
Threads
46
Messages
571
Reaction score
617
Location
Baton Rouge
Vehicle(s)
MAVERICK
Engine
2.5L Hybrid
Clubs
 

jdubblax

2.0L EcoBoost
Member
First Name
Justin
Joined
Aug 26, 2021
Threads
2
Messages
24
Reaction score
26
Location
Overland Park, KS
Vehicle(s)
Maverick
Engine
2.0L EcoBoost
Clubs
 
I hope the shutdown means they will ship my maverick.

built on 7/21 and hasn’t shipped yet.
 

Dmat

2.5L Hybrid
Well-known member
Joined
Oct 26, 2022
Threads
46
Messages
571
Reaction score
617
Location
Baton Rouge
Vehicle(s)
MAVERICK
Engine
2.5L Hybrid
Clubs
 
right at midnight production got a date and the build indicator has a green dot. im guessing the factory is still going full swing.
 

fordvideoguy

Well-known member
First Name
Tim
Joined
Jul 10, 2021
Threads
155
Messages
2,354
Reaction score
8,505
Location
Salina, KS
Website
www.long-mcarthur.com
Vehicle(s)
2022 F-150 Lightning, 2021 Ford Bronco
Engine
Undecided
Don't know, they usually tell us in the month when they schedule for that months production. Plants will usually shut down for maintenance for 2 weeks every year. Last year it shut down in July.
 

gyro

2.0L EcoBoost
Well-known member
First Name
Chris
Joined
Feb 9, 2023
Threads
3
Messages
47
Reaction score
36
Location
NJ
Vehicle(s)
Maverick
Engine
2.0L EcoBoost
Well that would be my luck and totally suck for my build week to be closed down. First build week was 7/31, then to 8/5, back to 8/2, and then to 8/5. Green dot "In Production" has been there since last week but no date under that still.

I can only cross my fingers at this point I guess