Sponsored

Ford Hermosillo Plant Shutdown

Hckyplyr08

2.5L Hybrid
Active member
Joined
Oct 8, 2022
Threads
10
Messages
30
Reaction score
29
Location
LA
Vehicle(s)
Maverick
Engine
2.5L Hybrid
Is the plant shutdown the weeks of 8/7 & 8/14? No vehicles will be built during this time?
Sponsored

 

JefCo

2.5L Hybrid
Active member
First Name
Jeff
Joined
Jul 25, 2023
Threads
0
Messages
30
Reaction score
44
Location
Clarksville, TN
Vehicle(s)
2016 Ford Escape
Engine
2.5L Hybrid
Where is the information on this? Everything I’ve read is how Ford has been adding more employees there to boost production.
Please post a link.
 
OP
OP

Hckyplyr08

2.5L Hybrid
Active member
Joined
Oct 8, 2022
Threads
10
Messages
30
Reaction score
29
Location
LA
Vehicle(s)
Maverick
Engine
2.5L Hybrid

JefCo

2.5L Hybrid
Active member
First Name
Jeff
Joined
Jul 25, 2023
Threads
0
Messages
30
Reaction score
44
Location
Clarksville, TN
Vehicle(s)
2016 Ford Escape
Engine
2.5L Hybrid
I know plants will shutdown for a short period to retool, but I’m wondering if they would schedule building trucks if they plan on a summer shut down.
 

Equator Guy

2.0L EcoBoost
Well-known member
First Name
Chris
Joined
Sep 17, 2022
Threads
2
Messages
69
Reaction score
87
Location
Topsham, ME
Vehicle(s)
2023 Maverick XL., 2015 Rav4. 2012 Suzuki Equator
Engine
2.0L EcoBoost
In the same boat: Production week was fluctuating 8/23-8/25, then saw In Production yesterday. Can't find any info on plant shutdown for 2023 but it makes sense, as this looks like something Ford does to most of its plants every summer.
 

Sponsored

MoveOver

2.5L Hybrid
Well-known member
First Name
Jan
Joined
Jun 16, 2023
Threads
3
Messages
75
Reaction score
61
Location
Rockville
Vehicle(s)
Maverick Hybrid
Engine
2.5L Hybrid

gkendric

2.5L Hybrid
Member
First Name
Gary
Joined
Aug 13, 2022
Threads
3
Messages
24
Reaction score
34
Location
Florence, Alabama
Vehicle(s)
Mercedes Benz GLE350, E350 former 2010 F150 Lariat
Engine
2.5L Hybrid
I got my VIN and was scheduled for August 22nd so if they do shut down I hope their restart will be seamless and successful.
 

cyberdog

2.5L Hybrid
Well-known member
First Name
Ray
Joined
Oct 15, 2021
Threads
5
Messages
663
Reaction score
785
Location
08084
Vehicle(s)
2023 Maverick Lariat Hybrid
Engine
2.5L Hybrid
Mine went into production 10 or so days early back in March. Could be earlier than expected delivery of restraint items, or fewer line stops than expected.
 

ejgroth2620

2.0L EcoBoost
Well-known member
First Name
Ed
Joined
Mar 31, 2023
Threads
5
Messages
154
Reaction score
130
Location
Bradenton, FL
Vehicle(s)
2023 Maverick Tremor
Engine
2.0L EcoBoost
I know plants will shutdown for a short period to retool, but I’m wondering if they would schedule building trucks if they plan on a summer shut down.
Not sure about Ford, but some factories shut down for 2 weeks during the summer and all eligible employees must take their vacation days at the same time.
 
Sponsored

Maverick504

2.0L EcoBoost
Member
First Name
Dan
Joined
May 25, 2023
Threads
1
Messages
24
Reaction score
26
Location
New Orleans
Vehicle(s)
2023 Ford Maverick Lariat FX4
Engine
2.0L EcoBoost
Is the plant shutdown the weeks of 8/7 & 8/14? No vehicles will be built during this time?
They occasionally shut down the factories to retool the production line in preparation for building a different model or maintenance. They are probably shutting down to either start building more Broncos or Mavericks as the stamping and building equipment for the two models are different.
I recently visited Ford’s River Rouge facility in Dearborn, Michigan and they have production shut down calendars listed at the factory like this.


The Dearborn Truck Plant will not be in active assembly during these dates in 2023, following the plant’s holiday and maintenance schedule. The dates include but aren’t limited to:
  • January 16
  • April 10
  • May 29
  • July 3 – 9
  • September 2 – 4
  • November 7
  • November 11
  • November 23 – 26
  • December 24-31
 

Superdog3657

2.5L Hybrid
Well-known member
Joined
Apr 13, 2023
Threads
1
Messages
51
Reaction score
96
Location
Ohio
Vehicle(s)
2011 ford Ranger Xlt waiting for xlt maverick hybr
Engine
2.5L Hybrid
Clubs
 
I worked for a tier 1 supplier for Ford for 30 years they always have a summer shutdown ,most of the time for two weeks we had to use 1 weeks vacation the 2nd week most people used as a waiting week for Unemployment. They also shut down between Christmas and New Years with pay. I always considered that a nice job perk , It made up for the week of vacation used during the summer shutdown.
 

Feldgary53

2.5L Hybrid
Well-known member
First Name
Gary
Joined
Mar 4, 2021
Threads
17
Messages
238
Reaction score
239
Location
Portland,Oregon
Vehicle(s)
‘23 Maverick Lariat Hybrid, ‘13 Porsche 911,’22 Porsche Macan S
Engine
2.5L Hybrid
If they are I just got lucky since mine went to plant 7/27 and the modules popped yesterday evening so it’s alive! Now I hope it’s still on track to ship without a two week delay 🧐
 

2lbgill

2.5L Hybrid
Well-known member
First Name
Don
Joined
May 20, 2023
Threads
45
Messages
423
Reaction score
477
Location
Upper Peninsula MI.
Vehicle(s)
2023 XLTHybrid
Engine
2.5L Hybrid
Clubs
 
I know plants will shutdown for a short period to retool, but I’m wondering if they would schedule building trucks if they plan on a summer shut down.
It probably started with a Chevy guy in a bar :cool:
 
Last edited:

huunvubu

2.5L Hybrid
Well-known member
First Name
Steve
Joined
Jul 21, 2021
Threads
57
Messages
2,755
Reaction score
4,703
Location
coppell tx
Vehicle(s)
2023 Ford Maverick Hybrid
Engine
2.5L Hybrid
 







Top