Sponsored

ShadowBlack XL440

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Jan 21, 2022
Threads
12
Messages
1,025
Reaction score
1,305
Location
Northern Ohio
Vehicle(s)
Non-Ford, not enought room to list..........
Engine
2.5L Hybrid
We have no longer have any orders previewing this morning , who knows if they're still scheduling this week because at this point it doesn't look promising, given our 5 previews went away back into the non scheduled list.
Chris, thanks for the information. May I ask where the previewing information comes from? Is that dealer or customer care provided?
Sponsored

 

over2000lbs

2.0L EcoBoost
Well-known member
First Name
Chris
Joined
Oct 4, 2022
Threads
1
Messages
47
Reaction score
73
Location
Texas
Vehicle(s)
2023 F150, 2023 Maverick (rollover from 2022)
Engine
2.0L EcoBoost
Update: all the Maverick orders appear to have been put on an emergency scheduling restriction looking at the preview report.
This may be due to the 22 order cancellations ongoing and they need more time to redo all the cancelled orders.

TL;DR: Maverick's are no longer scheduling this point in time due to a restriction on scheduling imposed by Ford
 
Last edited:

shurmanter

2.5L Hybrid
Well-known member
Joined
Aug 31, 2022
Threads
1
Messages
141
Reaction score
73
Location
Massachusetts
Vehicle(s)
Maverick
Engine
2.5L Hybrid
Update: all the Maverick orders appear to have been put on an emergency scheduling restriction looking at the preview report.
This may be due to the 22 order cancellations ongoing and they need more time to redo all the cancelled orders.

TL;DR: Maverick's are no longer scheduling this week due to a restriction on scheduling imposed by For
22 cancels are probably ongoing right now. I’ll get on chat with my 12/19 build week 22 and see if they have any changes
 

Mav101

Well-known member
First Name
Thom
Joined
Aug 10, 2022
Threads
1
Messages
302
Reaction score
395
Location
Tennessee
Vehicle(s)
Gm
Update: all the Maverick orders appear to have been put on an emergency scheduling restriction looking at the preview report.
This may be due to the 22 order cancellations ongoing and they need more time to redo all the cancelled orders.

TL;DR: Maverick's are no longer scheduling this week due to a restriction on scheduling imposed by For

That’s good, Ford shouldn’t build one 23 new order until all of the 22 rollovers are built.
 

Sponsored

Mav101

Well-known member
First Name
Thom
Joined
Aug 10, 2022
Threads
1
Messages
302
Reaction score
395
Location
Tennessee
Vehicle(s)
Gm
Of course although I do wonder if there are parts for the scheduled orders that will cancel, but due to regulations they have to push to 23

Whatever, just build the 22 rollovers in like kind before any 23 new order. Simple.
 

TdotMav

2.0L EcoBoost
Well-known member
Joined
Mar 8, 2022
Threads
8
Messages
195
Reaction score
90
Location
Toronto
Vehicle(s)
Acura MDX
Engine
2.0L EcoBoost
Same constraints, different model year
I would imagine if hybrid engines are main constraint then EB engines should get built even before 22 year hybrids.
 
Sponsored

shurmanter

2.5L Hybrid
Well-known member
Joined
Aug 31, 2022
Threads
1
Messages
141
Reaction score
73
Location
Massachusetts
Vehicle(s)
Maverick
Engine
2.5L Hybrid
Last edited:

SimonMore

Banned
Banned
Joined
Oct 24, 2022
Threads
0
Messages
32
Reaction score
55
Location
NY
Vehicle(s)
XLT
That’s good, Ford shouldn’t build one 23 new order until all of the 22 rollovers are built.
so you think that if they have one 22 lariat hybrid sitting there waiting for a constrained item, that they should shut the line down and not build any stripper XLT eco-boosts while they are waiting for a couple of mud guards on the 22?
 

Mav101

Well-known member
First Name
Thom
Joined
Aug 10, 2022
Threads
1
Messages
302
Reaction score
395
Location
Tennessee
Vehicle(s)
Gm
so you think that if they have one 22 lariat hybrid sitting there waiting for a constrained item, that they should shut the line down and not build any stripper XLT eco-boosts while they are waiting for a couple of mud guards on the 22?

“Like kind” 🤔
 

HybridOnOrder

2.5L Hybrid
Well-known member
First Name
Cee
Joined
Oct 24, 2021
Threads
3
Messages
252
Reaction score
278
Location
Virginia
Vehicle(s)
Going to be: Maverick XLT, Lux PKG, Moonroof, 360
Engine
2.5L Hybrid
Whatever, just build the 22 rollovers in like kind before any 23 new order. Simple.
I like the way you think. It matches my wishful mind.
If you think about it though, we were given a VIN. We WERE scheduled, so that would imply that they DO have the parts necessary. And they should be built first.

It would be extra great if this group of previously scheduled, '22 Mavericks turned '23 could be built with the stuff we ordered. Like the '22 luxury package items that are removed for '23s. And some people really wanted the Velocity Blue they ordered.

I hope you're right!
Sponsored

 
Last edited:
 







Top