All these trucks that rolled down the assembly line on Fridays. I'm glad mine is scheduled for a Tuesday.
Kidding aside, a later in the MY build means Hermosillo has more time to fix systemic issues and produce better quality trucks until 10-21.
Kidding aside, a later in the MY build means Hermosillo has more time to fix systemic issues and produce better quality trucks until 10-21.
Sponsored