Sponsored

October Hybrid Orders United

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
8
Messages
2,494
Reaction score
4,367
Location
GA
Vehicle(s)
2024 XLT Hybrid & 2024 Tesla M3P
Engine
2.5L Hybrid
Ordered 10/15/22. Status is "In Production" with window sticker visible, some of the modules turned on, and a blend date of 9/1. Has been in production since last Friday. Really hoping I see "built" today.
All of that is the same for me except blend date. Where do you see it?
Sponsored

 

Carl Racki

2.5L Hybrid
Active member
First Name
Dan
Joined
Jul 12, 2022
Threads
1
Messages
28
Reaction score
47
Location
IL
Vehicle(s)
2008 F-150 Lariat
Engine
2.5L Hybrid
Center bottom of mine it says "Special Order" and underneath that on the right it says 09 01 22.
 

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
8
Messages
2,494
Reaction score
4,367
Location
GA
Vehicle(s)
2024 XLT Hybrid & 2024 Tesla M3P
Engine
2.5L Hybrid
Center bottom of mine it says "Special Order" and underneath that on the right it says 09 01 22.
That's the invoice date, not blend date.
 

pistons pissing

2.5L Hybrid
Well-known member
First Name
Cody
Joined
Mar 7, 2022
Threads
1
Messages
249
Reaction score
402
Location
oklahoma
Vehicle(s)
2015 toyota camry
Engine
2.5L Hybrid
That's the invoice date, not blend date.
You probably will not see a blend date. Mine was built 8/24 and it has never shown a blend date. It shipped 11 days ago.
 

oGoditsNick

2.5L Hybrid
Member
First Name
Nick
Joined
Jan 19, 2022
Threads
1
Messages
16
Reaction score
14
Location
PA
Vehicle(s)
2015 Mazda CX-5
Engine
2.5L Hybrid
It should not be that long as did join @fordvideoguy , FB chat. They will be receiving 63 allocations for the month and with less than 100 roll overs would be close to 80% of them getting scheduled as MY23.
Thanks for the info! I hope your right, I'm going to see what happens on Monday when I go in. I'm loosing hope now more than ever
Over the past year I pumped over 6k of repairs into my CX-5 and its time to put it out to pasture. I just need it to hold out till this truck comes in.
 

Sponsored

Clive

2.5L Hybrid
Well-known member
Joined
Oct 22, 2021
Threads
10
Messages
309
Reaction score
439
Location
Los Angeles
Vehicle(s)
2022 Maverick XLT 2.0
Engine
2.5L Hybrid
Just did my weekly check-in with customer service. Now pushed from week of 9/26 to day of October 10. Happy to have it scheduled to the day, but still worried it might slip. Seems like every time I check the production date is 1 month away...
 

Automate

2.5L Hybrid
Well-known member
Joined
Jul 21, 2021
Threads
60
Messages
1,798
Reaction score
2,135
Location
Atlanta GA, USA (ATL)
Vehicle(s)
Fusion Hybrid, Mav XL Hybrid
Engine
2.5L Hybrid
Just received an update from Ford. The build date on my basic XL has been moved up from Oct 24 to Sept 26. So far, so good.
I wonder if the ones getting moved up do NOT have a 2K hitch and the ones getting moved back do HAVE a 2K hitch.
 

UnTruck

2.5L Hybrid
Well-known member
First Name
Layne
Joined
Mar 2, 2022
Threads
1
Messages
105
Reaction score
159
Location
Salt Lake City, UT
Vehicle(s)
2004 Honda Pilot
Engine
2.5L Hybrid
They scheduled my 10/25 XLT hybrid order this week. VIN too
Just got an email from Ford that they moved up the build week from 10/10 to 9/26! Strange things are afoot at the Circle K, man.
 

UnTruck

2.5L Hybrid
Well-known member
First Name
Layne
Joined
Mar 2, 2022
Threads
1
Messages
105
Reaction score
159
Location
Salt Lake City, UT
Vehicle(s)
2004 Honda Pilot
Engine
2.5L Hybrid
I wonder if the ones getting moved up do NOT have a 2K hitch and the ones getting moved back do HAVE a 2K hitch.
My hybrid has the hitch and 360
 
Sponsored

Carl Racki

2.5L Hybrid
Active member
First Name
Dan
Joined
Jul 12, 2022
Threads
1
Messages
28
Reaction score
47
Location
IL
Vehicle(s)
2008 F-150 Lariat
Engine
2.5L Hybrid
That's the invoice date, not blend date.
OK...friend of mine who got a Bronco told me that was the blend date...so...as with every other step in this process, who knows lol.
 

Hijeemoto

2.5L Hybrid
Well-known member
First Name
Nunya
Joined
Mar 31, 2022
Threads
0
Messages
87
Reaction score
79
Location
CT
Vehicle(s)
Mini
Engine
2.5L Hybrid
Just received an email from Ford stating that my 10/11/2021 hybrid Mav order (XLT) has a build date of September 26 now instead of the initial date of 10/10/2022. Woohoo. Fingers crossed it actually does get built sooner. It has a hitch, floor mats, spare tire for options. Removed SIBL months ago in hopes of getting built. Wish I had left it in since it didn’t help anything. Oh well.
 

Clive

2.5L Hybrid
Well-known member
Joined
Oct 22, 2021
Threads
10
Messages
309
Reaction score
439
Location
Los Angeles
Vehicle(s)
2022 Maverick XLT 2.0
Engine
2.5L Hybrid
Just got an email from Ford that they moved up the build week from 10/10 to 9/26! Strange things are afoot at the Circle K, man.
Just received an email from Ford stating that my 10/11/2021 hybrid Mav order (XLT) has a build date of September 26 now instead of the initial date of 10/10/2022. Woohoo. Fingers crossed it actually does get built sooner. It has a hitch, floor mats, spare tire for options. Removed SIBL months ago in hopes of getting built. Wish I had left it in since it didn’t help anything. Oh well.
Looks like you all got moved from 10/10 to 9/26, while I got moved from 9/26 to 10/10.

I do not have the hitch ¯\_(ツ)_/¯
 

Automate

2.5L Hybrid
Well-known member
Joined
Jul 21, 2021
Threads
60
Messages
1,798
Reaction score
2,135
Location
Atlanta GA, USA (ATL)
Vehicle(s)
Fusion Hybrid, Mav XL Hybrid
Engine
2.5L Hybrid
Looks like you all got moved from 10/10 to 9/26, while I got moved from 9/26 to 10/10.

I do not have the hitch ¯\_(ツ)_/¯
Maybe there is already a new constraint after the hitch constraint was eliminated.

Without Ford telling us anything we can only guess.
Sponsored

 
 







Top