I bet you get scheduled this week! Moving to a 2 at least means they were considering building yours haha. I didn't order til mid-July so I've got nothing to complain about.
Mine has been code 2 for over 2 months. Build dates are still the luck of the draw.
CO Lariat Lux Hybrid.
Good luck though.
 

Sponsored

haakepuck

2.5L Hybrid
Member
First Name
Rick
Joined
Aug 5, 2021
Threads
1
Messages
10
Reaction score
21
Location
Glen Ellyn Illinois
Vehicle(s)
2015 Ford Escape
Engine
2.5L Hybrid
How were you able to make this change being at Priority 02? I am as well and my dealer insists I can’t make a change.
My dealer said the same thing until I convinced him to call the rep. The rep changed my order while I was a 2.
 

Bbosley23

Member
First Name
Ben
Joined
Jul 29, 2021
Threads
0
Messages
11
Reaction score
7
Location
Baltimore
Vehicle(s)
Ram 1500 , maverick on order
Any one get a email yet been looking all morning no luck so far
 

Scupking

2.5L Hybrid
Well-known member
First Name
Matt
Joined
Aug 13, 2021
Threads
14
Messages
1,359
Reaction score
1,583
Location
CT
Vehicle(s)
2022 Ford Maverick Hybrid
Engine
2.5L Hybrid

Tourguide

2.5L Hybrid
Well-known member
First Name
Pete
Joined
Aug 6, 2021
Threads
1
Messages
159
Reaction score
241
Location
Wi
Vehicle(s)
2018 Escape
Engine
2.5L Hybrid
I'm being patient...First Edition, Rapid Red, 360! Jan 2022?? :)
Keep up the positive vibes, I'm in exactly the same boat. As I stated before, that's exactly what I ordered and by god, that's what I will wait for and that's a definitely maybe🥴🤪🤪.
 
Sponsored

Jon

Member
First Name
Jonathan
Joined
Aug 8, 2021
Threads
0
Messages
11
Reaction score
7
Location
Wv
Vehicle(s)
Chevy Cruze
Maverick will be scheduling next week (of 9/27) for production build week 11/22.


2022 Maverick scheudling week 9:27.jpg
Question. On my first email (and only lol) it had a link where I could read the status on line. Now even I click on the link I’m only getting a blank screen. Could this mean that Ford is looking at my truck as a possible schedule?
 

bbishop0806

Well-known member
First Name
brian
Joined
Sep 8, 2021
Threads
2
Messages
96
Reaction score
109
Location
Belleville, MI
Vehicle(s)
fiesta
What was the number again that people would call to check on status of build
 

Darnon

2.5L Hybrid
Well-known member
Joined
Jul 4, 2021
Threads
10
Messages
4,758
Reaction score
5,631
Location
WNY
Vehicle(s)
2022 Maverick
Engine
2.5L Hybrid
Question. On my first email (and only lol) it had a link where I could read the status on line. Now even I click on the link I’m only getting a blank screen. Could this mean that Ford is looking at my truck as a possible schedule?
The 'View Online' link in the upper right? That's in case whatever e-mail preview you're using doesn't render the confirmation e-mail properly. Ford must have changed something on their system though and now it's a nonfunctioning link for me as well.
 

Knight82

Member
First Name
Tim
Joined
Sep 14, 2021
Threads
1
Messages
8
Reaction score
26
Location
Upstate NY
Vehicle(s)
2011 Fiesta 2021 Escape
It's odd over the past 2 days I can no longer view my order. When I click on view order from the Ford order confirmation email it just goes to a page that now says "page can't be found".
Same here for my order..xlt lux fx4 4ktow copilot360 full spare ecoboost AWD alto blue ny state ordered 7/2....got first email 7/6...probably nothing....i am resigned to a march build and april delivery
 
Last edited:

MavrickEcoBoost

Well-known member
First Name
Chris
Joined
Aug 21, 2021
Threads
1
Messages
133
Reaction score
189
Location
Tennessee
Vehicle(s)
2019 Ranger
Just tried to add on a full size spare to my build and my dealer told me it is in review right now. And it would not let him add it. So hopefully I can get a production date this week!