Sponsored

Ham57

2.5L Hybrid
Active member
First Name
dean
Joined
Sep 26, 2022
Threads
1
Messages
33
Reaction score
18
Location
Mid Michigan Thumb
Vehicle(s)
2014 Ford Escape titanium 2.0L & 2019 MKC 2.0L
Engine
2.5L Hybrid
Anyone getting a Mav from Romeo Ford Mi. ? The reason I ask is I was told they’re getting deliveries of 40 mavs in November. And how was your experience with Romeo Ford?

still waiting on my 09.16.22 , XLT hybrid lux package 360, engine block heater silver rollover.
Sponsored

 

Robert C

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Apr 22, 2022
Threads
25
Messages
782
Reaction score
1,010
Location
48021
Vehicle(s)
2001 Ranger
Engine
2.5L Hybrid
Not sure what I did to deserve this "special" treatmernt. The tracking website tells me it is "In Production" as we speak, and that a window sticker will soon be available!
Odd how Ford assigns and shuffles VINs. Yours at 36XX will be one of the first 2024s built as they just started 2024s 2 days ago and you're in production, mine at 24XX originally scheduled even later at 10-23 has been bumped to 11-13.
 

Fletch_KC

2.5L Hybrid
Well-known member
Joined
Aug 9, 2022
Threads
11
Messages
125
Reaction score
268
Location
Kansas City
Vehicle(s)
2025 Maverick Lariat Hybrid AWD
Engine
2.5L Hybrid
I got the "scheduled for production" email last week. Anyone hear anything from Ford about the "private offer" for carryover orders?
 

DarrenDizz

2.0L EcoBoost
Well-known member
First Name
Darren
Joined
Sep 17, 2023
Threads
1
Messages
52
Reaction score
46
Location
Colorado
Vehicle(s)
2024 Ford Maverick XLT Tremor
Engine
2.0L EcoBoost
So I ordered 9/15/23 got a scheduled build date today not even 30 days after ordering. So I ordered a 2024 XLT Luxury Tremor 2.0. scheduled build date the week of December 11, 2023!! I'll believe it when i see it, according to people who waited a long time.


  • ⏰ 8:53am MST
  • 📅 December 11, 2023
  • 🔢 290XX
  • 🛻 Carbonized Metallic Grey 2024 Maverick 2.0 Eco-Boost, XLT Luxury, Tremor, C-P360
  • 📍 Western Slope Colorado
  • 🗓 09/15/2023 not a carry over order
  • 🕺 Glenwood Springs Ford, Glenwood Springs, CO.
Got updated with a bump ahead to a production date week of 10/30/2023!!
 

Jdgarrett1970

2.0L EcoBoost
Well-known member
First Name
Jd
Joined
Sep 5, 2023
Threads
4
Messages
89
Reaction score
30
Location
Western Kentucky
Vehicle(s)
2012 chevy sonic, soon 2024 maverick truck xlt ec
Engine
2.0L EcoBoost
Clubs
 
I got the "scheduled for production" email last week. Anyone hear anything from Ford about the "private offer" for carryover orders?
At least some has email, im still waiting, at least I have my order number. My dealer has told me that I'm one of 6 people that is waiting for the email.
 

Sponsored

Fibrepunk

2.5L Hybrid
Well-known member
Joined
Apr 11, 2022
Threads
5
Messages
398
Reaction score
455
Location
SoCal
Vehicle(s)
2023 Ford Maverick XLT Hybrid
Engine
2.5L Hybrid
Clubs
 
I got the "scheduled for production" email last week. Anyone hear anything from Ford about the "private offer" for carryover orders?
I read somewhere that Ford gave out certificate to someone for a 2024 schedule recently. Try calling Ford marketing and see if there is a certificate for you, if you are a rollover.
 

ilikebike

2.5L Hybrid
Well-known member
Joined
Feb 7, 2023
Threads
5
Messages
681
Reaction score
1,112
Location
SoCal
Vehicle(s)
2024 Ford Maverick Lariat Hybrid HPR w/ BAP
Engine
2.5L Hybrid
I got the "scheduled for production" email last week. Anyone hear anything from Ford about the "private offer" for carryover orders?
I believe the private offer is communicated from Ford to the dealer, they won't reach out to you directly. If you contact the dealer or Ford Marketing they should be able to give you more info if you need it.
 

Fibrepunk

2.5L Hybrid
Well-known member
Joined
Apr 11, 2022
Threads
5
Messages
398
Reaction score
455
Location
SoCal
Vehicle(s)
2023 Ford Maverick XLT Hybrid
Engine
2.5L Hybrid
Clubs
 
Okay, on transitional private offer for 23 -> 24 orders. If your dealer has done all the paperwork, the certificate is now active in Ford's computer system, I just got off the phone with Ford Marketing(800-334-4375). For 23 -> 24 certificate, it is a six digits number, and the digits don't match up with the order/sale codes like that of 22 -> 23 transitional private offer.

For those who already got a scheduled build, I highly recommend contacting Ford Marketing and make sure that your certificate is there than waiting until last minute to sort out the situation when there is an issue with your certificate.
 

Waterick

2.5L Hybrid
Well-known member
First Name
Richard
Joined
Oct 27, 2022
Threads
8
Messages
2,109
Reaction score
2,603
Location
Laurens county SC
Vehicle(s)
'24 Mav Lariat, '14 Prius, '83 'Stang, more...
Engine
2.5L Hybrid
Clubs
 
Maybe the strike shutdown of the Kentucky truck plant will free up some wheels/tires for the XL/XLT. Then again the Kentucky plant probably uses larger sizes.
Shame that they can't use the facility for maverick truck instead
Then the Maverick plant would be on strike too. I don't think we want that!
The Mavericks are made in Mexico, they are NOT UAW.
Now, tell me you're really following what's being said.
 

Texican

2.0L EcoBoost
Member
First Name
Tom
Joined
Oct 12, 2023
Threads
1
Messages
12
Reaction score
6
Location
Texas
Vehicle(s)
Rav4
Engine
2.0L EcoBoost
Ford emailed me last week with a build date for 12-11-23 but have now updated that to 11-13-23 for my 24MY XLT.
 
Sponsored

RDS

2.5L Hybrid
Active member
First Name
Ray
Joined
Oct 26, 2022
Threads
0
Messages
25
Reaction score
47
Location
Southwest OH
Vehicle(s)
2024 Lariat Hybrid
Engine
2.5L Hybrid
I just wonder how much longer the striking workers will continue to draw strike pay. The UAW had 825 million in their strike fund at the start of the strike. We now have 33,700 workers on strike plus the 5000 that the big three have laid off who will also draw strike pay. At $500 per week per person that fund is not going to last very long. Strike is now on day 28. Saw last night where the strikers were asking for donations. If my numbers are correct it's costing the union 19,350,000 a week.
33700 * $500 is $16.5million. So only 48 weeks of strike pay. I don't think the union is worried about that.
 

gwrace14651

2.5L Hybrid
Well-known member
First Name
David
Joined
Sep 2, 2022
Threads
47
Messages
950
Reaction score
923
Location
TX
Vehicle(s)
2024 Ford Maverick Lariat Hybrid
Engine
2.5L Hybrid
Clubs
 
33700 * $500 is $16.5million. So only 48 weeks of strike pay. I don't think the union is worried about that.
Those numbers constantly change as Ford continues to lay off workers and the UAW continues to add facilities to the strike. The union is really just spending the dues that members pay so it's not an issue for them. Not a win for anyone or the economy.
 

Dave49

2.0L EcoBoost
Member
First Name
Dave
Joined
Jul 19, 2023
Threads
1
Messages
13
Reaction score
51
Location
Saint Louis MO
Vehicle(s)
2005 Sports Trac
Engine
2.0L EcoBoost
Ford notice indicates it will be a Lariat day. Ford's actual scheduling software appears to be eyeballing XLs and XLTs as well. We'll see shortly.

Highest VIN beforehand: 19,9XX

Highest VIN Reported: 303XX

Please copy & paste the bullets below & provide the following info when you announce that you received your email:
  • ⏰ Time email was received (include time zone!)
  • 📅 Your scheduled build week
  • 🔢The last 5 digits of your VIN with the last two numbers X'd out (e.g.: 234XX)
  • 🛻 All relevant build info (e.g., atlas blue hybrid lariat lux + all weather mats)
  • 📍 Your region, if comfortable (e.g., southern California or even Los Angeles, CA)
  • 🗓 Your original order date (and whether or not you are a MY23 carryover)
  • 🕺 Dealer (e.g., Long McArthur Ford, Salina KS)
📸Screenshots are encouraged and don't forget to update the tracking spreadsheets here:
https://www.mavericktruckclub.com/f...ck-order-tracking-list-stats-enter-yours.165/

🗺 And be sure to use the order tracking tools here:
https://www.mavericktruckclub.com/forum/threads/🧭-maverick-build-tracking-links.2882/

If you just want to be notified, you don't need to add a comment to the thread! You can click on the watch button ☝ 👉


Ford Maverick 10/12/23 Scheduling Email Received Group [EMAILS NOW ARRIVING!] {filename}
Maybe a first. Ford sent me an updated email moving my build date from 12/11/23 to 11/06/23. I was sure when I saw the email it was going to go the other way.
Original
 

MoeMav

2.0L EcoBoost
Well-known member
First Name
Moe
Joined
Aug 16, 2023
Threads
3
Messages
48
Reaction score
167
Location
Baker, FL
Vehicle(s)
2024 XLT
Engine
2.0L EcoBoost
  • Time email received 9:32AM CST (Oct 12)
  • 📅 Your scheduled build week 12/18/23
  • 🔢The last 5 digits of your VIN with the last two numbers X'd out - 242xx
  • 🛻 All relevant build info - XLT EB, Atlas Blue, spray-in, hitch, FS spare, tri-fold
  • 📍 Your region - NW Florida
  • 🗓 Your original order date - Jul 23, not a carryover
  • 🕺 Dealer - World Ford, Pensacola
 
 







Top