Sponsored

theway-yay-ting

2.5L Hybrid
Well-known member
First Name
Al
Joined
Feb 2, 2022
Threads
39
Messages
1,396
Reaction score
2,345
Location
Virginia
Vehicle(s)
2014 Honda CR-V, 2019 Kia Sportage
Engine
2.5L Hybrid
All of us rollover orders on 9/29:

 

MvrkECWI

2.5L Hybrid
Well-known member
Joined
Apr 8, 2022
Threads
4
Messages
236
Reaction score
481
Location
54701
Vehicle(s)
Maverick, Crosstrek
Engine
2.5L Hybrid
As I watch my build week slowly creep into November, I seriously doubt they'll get the VIN assigned 22s built until December. Schedule away.
 
  • Like
Reactions: DJF

Sponsored

YukiTak

Member
First Name
Cole
Joined
Dec 16, 2021
Threads
0
Messages
13
Reaction score
11
Location
Northville, Mi
Vehicle(s)
Chevrolet Equinox 2018
My 2022 just went into production a few days ago, can look at my window sticker and everything
 

Glenn

2.0L EcoBoost
Member
First Name
[email protected]
Joined
Sep 3, 2021
Threads
4
Messages
14
Reaction score
3
Location
Kentucky
Vehicle(s)
Escape, focus, mustang
Engine
2.0L EcoBoost
My 2022 just went into production a few days ago, can look at my window sticker and everything
I got the same thing a month ago. SUPPOSED to be built week of Sept 5th, then I was told week of Sept 12th. Here it is Sept 19th and all I get is scheduled for production. Nothing else except vin and window sticker
 

YukiTak

Member
First Name
Cole
Joined
Dec 16, 2021
Threads
0
Messages
13
Reaction score
11
Location
Northville, Mi
Vehicle(s)
Chevrolet Equinox 2018
I got the same thing a month ago. SUPPOSED to be built week of Sept 5th, then I was told week of Sept 12th. Here it is Sept 19th and all I get is scheduled for production. Nothing else except vin and window sticker
My 2022 is currently in production,
 
Sponsored

Paulyz

2.0L EcoBoost
Well-known member
First Name
Paul
Joined
Oct 14, 2021
Threads
1
Messages
457
Reaction score
235
Location
Forestville, WI
Website
www.churchbelltoweradventure-suspense.com
Vehicle(s)
Maverick
Engine
2.0L EcoBoost
I got the same thing a month ago. SUPPOSED to be built week of Sept 5th, then I was told week of Sept 12th. Here it is Sept 19th and all I get is scheduled for production. Nothing else except vin and window sticker
Same here. First scheduled for production week of Sept. 5th. Then September 19th. Then October 3rd. Now October 10th.
I don't have Lux or 360, just Ecoboost XLT AWD with Towing package.
 

gwrace14651

2.5L Hybrid
Well-known member
First Name
David
Joined
Sep 2, 2022
Threads
37
Messages
877
Reaction score
847
Location
TX
Vehicle(s)
2024 Ford Maverick Lariat Hybrid
Engine
2.5L Hybrid
Clubs
 
I think the maverick truck club needs a kickback from all the YouTube content creators that use this site to create their videos. Nothing like rehashing the same content over and over again.
Sponsored

 
 




Top