Sponsored

October Hybrid Orders United

Mxer97

2.5L Hybrid
Well-known member
First Name
R
Joined
Oct 4, 2021
Threads
51
Messages
408
Reaction score
428
Location
H town
Vehicle(s)
2023 mav xlt
Engine
2.5L Hybrid
For all our other early August In Production status folks--my status finally shifted from in production to "Built." Hopefully you guys will see the same thing on the tracker!
hellllll yes! I know mine is close to yours, congrats PacMan!
Sponsored

 

dadd75

2.5L Hybrid
Well-known member
First Name
David
Joined
Oct 25, 2021
Threads
22
Messages
653
Reaction score
566
Location
Upstate South Carolina
Website
www.universityofheaven.com
Vehicle(s)
2022 Maverick Hybrid Lariat, 2013 Buick Encore
Engine
2.5L Hybrid
My son ordered on 10/25/21 Lariat with only full size spare and hitch. Got build date 8/26. Tracker shows built 9/1. No shipping info so far.
My order of 10-25-2021 Lariat Lux Hybrid got a VIN June 30th with a build week of 8/22, then 8/29, then Sept 5, then Sept 19. Then a build 'day' of Sept. 23, now, as of yesterday, Sept.24th. Vey!
 

oGoditsNick

2.5L Hybrid
Member
First Name
Nick
Joined
Jan 19, 2022
Threads
1
Messages
16
Reaction score
14
Location
PA
Vehicle(s)
2015 Mazda CX-5
Engine
2.5L Hybrid
I just called for customer support and it's official, I've been bumped to MY23. Told me to go to the dealer on the 12th to get the roll over process started.
I really hope I don't have to wait another 10 months
 

onetequilatwo

2.5L Hybrid
Well-known member
First Name
Steve
Joined
Oct 29, 2021
Threads
15
Messages
859
Reaction score
676
Location
Massachusetts
Vehicle(s)
2022 Hybrid Lariat Maverick and 2019 RAV4
Engine
2.5L Hybrid
I just called for customer support and it's official, I've been bumped to MY23. Told me to go to the dealer on the 12th to get the roll over process started.
I really hope I don't have to wait another 10 months
It should not be that long as did join @fordvideoguy , FB chat. They will be receiving 63 allocations for the month and with less than 100 roll overs would be close to 80% of them getting scheduled as MY23.
 

Sponsored

Rlb080

2.5L Hybrid
Well-known member
First Name
Jerry
Joined
Nov 12, 2021
Threads
0
Messages
58
Reaction score
121
Location
Phoenix, AZ
Vehicle(s)
2014 F150 xlt
Engine
2.5L Hybrid
It's official my Oct 26, 2021 hybrid Lariat lux with copilot360 wasn't scheduled today. Will be ordering a MY23 Lariat next Thursday. Looks like no Maverick for me until January or February 2023. (15-16 months after original order)
 

theway-yay-ting

2.5L Hybrid
Well-known member
First Name
Al
Joined
Feb 2, 2022
Threads
39
Messages
1,396
Reaction score
2,345
Location
Virginia
Vehicle(s)
2014 Honda CR-V, 2019 Kia Sportage
Engine
2.5L Hybrid
It should not be that long as did join @fordvideoguy , FB chat. They will be receiving 63 allocations for the month and with less than 100 roll overs would be close to 80% of them getting scheduled as MY23.
Wait I missed his chat… they are getting 63 MORE MY22 Orders scheduled?
 

bwf4

2.5L Hybrid
Well-known member
First Name
Bruce
Joined
Oct 21, 2021
Threads
3
Messages
53
Reaction score
91
Location
Syracuse, NY
Vehicle(s)
Maverick XLT Hybrid
Engine
2.5L Hybrid
Yes, I did 2 weeks ago. they scheduled me for 10/24 and moved me to 10/17 yesterday. I ordered a A51 XLT hybrid lux on 10/21/2021.
I just got my window sticker and Luxury package is on there!
 

MB_NLD

Member
Joined
Oct 4, 2021
Threads
0
Messages
19
Reaction score
22
Location
Baton Rouge LA
Vehicle(s)
NA
Engine
Undecided
Happy for everyone here who has been scheduled. Mine still has not been scheduled. I tried to have some of the constraints removed before the deadline a few months ago but my dealership said he wasn't able to, even though Ford confirmed that my order was submitted correctly. Not sure if the dealer knows what they're doing, they are relatively small which probably does not help either. This has been a really frustrating experience and probably my last one with Ford after taking delivery, if it's ever going to happen
 

onetequilatwo

2.5L Hybrid
Well-known member
First Name
Steve
Joined
Oct 29, 2021
Threads
15
Messages
859
Reaction score
676
Location
Massachusetts
Vehicle(s)
2022 Hybrid Lariat Maverick and 2019 RAV4
Engine
2.5L Hybrid
Wait I missed his chat… they are getting 63 MORE MY22 Orders scheduled?
No, they are the months allocation to be scheduled for MY23. While I, nor anyone else mention it, but the scheduling thread that shows the models and scheduling for the week has a note on the Maverick line, far right Sept 29th scheduling for MY23. Thread link Sept 05 scheduling

So perhaps those allocation will all be used in that first week of MY23 scheduling. Not sure, but later, perhaps @fordvideoguy can clarify on those 63 allocations.
 
Sponsored

oilman300

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Oct 25, 2021
Threads
8
Messages
332
Reaction score
332
Location
Georgia
Vehicle(s)
2022 Velocity Blue XL Hybrid
Engine
2.5L Hybrid
I just checked the tracker and the status of my Velocity Blue XL hybrid has been changed to Built.
 

Jamesrchapman1949

2.5L Hybrid
Well-known member
First Name
James
Joined
Jun 4, 2022
Threads
3
Messages
96
Reaction score
91
Location
48169
Vehicle(s)
Escape
Engine
2.5L Hybrid
Ford told me my xlt, lux, 360, sibl will be a M23.

sadly, I may also upgrade to a Lariat.
 

Carl Racki

2.5L Hybrid
Active member
First Name
Dan
Joined
Jul 12, 2022
Threads
1
Messages
28
Reaction score
47
Location
IL
Vehicle(s)
2008 F-150 Lariat
Engine
2.5L Hybrid
Ordered 10/15/22. Status is "In Production" with window sticker visible, some of the modules turned on, and a blend date of 9/1. Has been in production since last Friday. Really hoping I see "built" today.
Sponsored

 
 







Top