Sponsored

Dun4791

2.0L EcoBoost
Well-known member
First Name
Vincent
Joined
Jan 23, 2022
Threads
1
Messages
580
Reaction score
927
Location
Tennessee
Vehicle(s)
Chevy,dodge, ford,vw,honda
Engine
2.0L EcoBoost
Scheduling has nothing to do with present production. No scheduling means no new builds are being scheduled for a future date this week.
When the plant is not running production, the schedulers aren’t present either. Just maintenance and vehicle repair.

and yes you are correct, we are saying the same thing
Sponsored

 

Darnon

2.5L Hybrid
Well-known member
Joined
Jul 4, 2021
Threads
10
Messages
5,728
Reaction score
7,247
Location
WNY
Vehicle(s)
2022 Maverick
Engine
2.5L Hybrid
When the plant is not running production, the schedulers aren’t present either. Just maintenance and vehicle repair.

and yes you are correct, we are saying the same thing
Nice edit. Scheduling isn't done at the plant. The plant's present production and scheduling for the future are entirely different.
 

Dun4791

2.0L EcoBoost
Well-known member
First Name
Vincent
Joined
Jan 23, 2022
Threads
1
Messages
580
Reaction score
927
Location
Tennessee
Vehicle(s)
Chevy,dodge, ford,vw,honda
Engine
2.0L EcoBoost
Nice edit. Scheduling isn't done at the plant. The plant's present production and scheduling for the future are entirely different.
So planning and production are different? 🤔

Yes there are schedulers at the plant levels
 

Sponsored

SpacemanSpiff

2.5L Hybrid
Well-known member
First Name
Tyreese
Joined
Jun 23, 2021
Threads
11
Messages
354
Reaction score
811
Location
Mid-west
Vehicle(s)
F-15 Eagle
Engine
2.5L Hybrid

Dadmezz

2.5L Hybrid
Well-known member
Joined
Nov 16, 2021
Threads
5
Messages
331
Reaction score
327
Location
Akron, Ohio
Vehicle(s)
Subaru
Engine
2.5L Hybrid
Get it built so they can park it, in an empty lot in Mexico. I have a build date of March 7th but due to the chip shortage, I can't even be excited about it.
Ford didn't have much success with storing the F150s here in the states. Hope Mexico's climate is drier.. Ford should offer a wax undercoating if they take it upon themselves to store potentially their customer's vehicles. That would go a long way with customer confidence with Ford. Let alone the right thing to do.
 

Suzukiridr14

2.5L Hybrid
Well-known member
First Name
Frank
Joined
Oct 30, 2021
Threads
20
Messages
1,562
Reaction score
2,000
Location
Sarasota Florida
Vehicle(s)
1956 THunderbird , 2016 Acura MDX (Wifes car)
Engine
2.5L Hybrid
Clubs
 
It doesn't seem to matter when or what you ordered for your build date. I ordered my hybrid with just the lux package + 360 co-pilot that you must order with lux package, and Red pepper paint on 7/5/21. Nothing else. After finally getting a in production notice for 1/17 build, I checked to see where the truck was, only to find out that it went into production on 2/4/22, with a delivery date to my dealer (Sarasota Ford) on 3/13/22. Lots of people who ordered in Aug - Nov. with hybrid lux packages already have there trucks. It may have something to do with what dealer you ordered from.
 

Suzukiridr14

2.5L Hybrid
Well-known member
First Name
Frank
Joined
Oct 30, 2021
Threads
20
Messages
1,562
Reaction score
2,000
Location
Sarasota Florida
Vehicle(s)
1956 THunderbird , 2016 Acura MDX (Wifes car)
Engine
2.5L Hybrid
Clubs
 
Agreed, I will be 72 before I get my truck. I may have forgotten how to drive by then!
I ordered my truck on 7/5/21, I was 81 at that time. Hope to get mine before I'm 82! Look for me on the AMBER ALERTS "Old Man Lost in his new MAVRICK"
 
Sponsored

WaitingHaulDogs

2.5L Hybrid
Well-known member
First Name
Tucson
Joined
Feb 5, 2022
Threads
0
Messages
72
Reaction score
71
Location
Minnesota
Vehicle(s)
Lariat
Engine
2.5L Hybrid
For my Rapid Red First Edition Hybrid with Luxe Pkg and 360; it took 4 weeks of "In Production" and 10 days in "being built". I'm on the 3rd day in the "shipped" category with an estimated delivery date of March 5th. I'm in Nashville, TN. I ordered August 3rd.
 

Turtle

2.5L Hybrid
Well-known member
First Name
Dennis
Joined
Jul 26, 2021
Threads
54
Messages
765
Reaction score
888
Location
MD
Vehicle(s)
Escape Hybrid
Engine
2.5L Hybrid
With my luck, this is the week that I will be scheduled for production. Which would put the delivery estimate right when I am due for my 2 week European vacation which we have had cancelled on us twice already due to covid. Also with my luck, I will not have any build date changes or shipping delays. My dealer will not be able to get a hold of me overseas and therefore sell my truck to someone else... Perfect timing.
Work with your dealer to get the paperwork done before you vacation.
 

Turtle

2.5L Hybrid
Well-known member
First Name
Dennis
Joined
Jul 26, 2021
Threads
54
Messages
765
Reaction score
888
Location
MD
Vehicle(s)
Escape Hybrid
Engine
2.5L Hybrid
It means there is no production at the plant, so current orders are pushed and nothing is being scheduled for the future. Everyone but facility maintenance and vehicle repair floor is on lay off
Not necessarily there could be cars from other build weeks that didn’t get built and have now been rescheduled to that week.
Sponsored

 
 







Top