tkistre

2.5L Hybrid
Well-known member
First Name
Tom
Joined
Nov 4, 2022
Threads
2
Messages
114
Reaction score
104
Location
Louisiana
Vehicle(s)
2023 Ford Maverick Lariat
Engine
2.5L Hybrid
I am a transit driver for our local Ford Dealership. I got to drive a Maverick on a 3 hour delivery and knew I wanted one. I originally ordered on 01-12-2022. I wanted the hybrid because 90+ percent of my driving is in town, but no longer taking hybrid orders. So I ordered a Lariat with 2.0 EcoBoost, Lux package, CoPilot 360, in Area 51 color at that time. Never got a VIN or build date. So it was reordered on 09-16-2022. This time with the Hybrid. Got my email with VIN and build date, week of 12-19-2022.

Fingers crossed after everything I've read here.
Sponsored

 

vinnymac

2.0L EcoBoost
Well-known member
First Name
Vince
Joined
Oct 26, 2022
Threads
24
Messages
706
Reaction score
344
Location
Florida
Vehicle(s)
Maverick
Engine
2.0L EcoBoost
I didn't get the email, but chat gave me a build week and a VIN!

Original order confirmation: 11/4/2022
Reorder confirmation: 9/20/2022

Atlas Blue Hybrid XLT Lux with Bed Extender

I'm so sorry for those that are still waiting, I hope you get good news soon!
I didn't get the email, but chat gave me a build week and a VIN!

Original order confirmation: 11/4/2022
Reorder confirmation: 9/20/2022

Atlas Blue Hybrid XLT Lux with Bed Extender

I'm so sorry for those that are still waiting, I hope you get good news soon!
What is chat ? gave me a build week?
 

EclipseJTB

2.5L Hybrid
Member
Joined
Oct 24, 2021
Threads
3
Messages
21
Reaction score
23
Location
Utah
Vehicle(s)
Maverick Hybrid XLT Lux (built, awaiting shipment)
Engine
2.5L Hybrid
Ford chat took my order code and sales Code. Up to this point they have just told me my order awaits scheduling. Last night they told me my VIN and said I was scheduled for the week of Dec 19.
 
First Name
Jack
Joined
Nov 23, 2021
Threads
0
Messages
9
Reaction score
2
Location
Westfield, IN
Vehicle(s)
2019 Ford Fusion Hybrid, 2023 Mav XLT
Engine
2.5L Hybrid
I got the same email with scheduled date of Dec 19th and VIN. Ordered 11/6/21. Rolled over. First thing I have heard since the order and rollover confirmations. We shall see...
 

gwrace14651

2.5L Hybrid
Well-known member
First Name
David
Joined
Sep 2, 2022
Threads
47
Messages
950
Reaction score
923
Location
TX
Vehicle(s)
2024 Ford Maverick Lariat Hybrid
Engine
2.5L Hybrid
Clubs
 
I wonder if Ford chat is down. The option is listed but no link to startup.
 

Sponsored

Aherpa

2.5L Hybrid
Well-known member
Joined
Nov 17, 2021
Threads
38
Messages
916
Reaction score
1,268
Location
Iowa
Vehicle(s)
Edge, Maverick Lariat Hybrid
Engine
2.5L Hybrid
YOUR VEHICLE IS SCHEDULED FOR PRODUCTION
Dear Robert Cannaday,

Big things are happening right now. We are excited to let you know your 2023 Maverick XLT SuperCrew has been scheduled for production. Your vehicle is scheduled to be built the week of December 19, 2022.

Forecasting a specific build date can be complex. Sometimes unforeseen challenges occur, or the custom details of your order can add time to this estimate. But even if your schedule needs adjusting, we’re working to build a vehicle that is everything you expect from a Ford.

In your Built Order Status email, we will provide you an estimated delivery window of when your vehicle will arrive at Peacock Ford. While you wait, check out the status of your vehicle at any time by clicking the button below.

We have included your Vehicle Identification Number (VIN) for your reference: XXXXXXXXXXXXX
We got the 'scheduled for production' email for our converted 2022/2023 Cactus Grey Hybrid Lariat Lux 360 (ordered on Oct 23rd, 2021) on Nov 4, 2022. Nov 4, 2022 is the same day we bought a vacated order from our dealer. The vacated order has a moon roof but is otherwise the same vehicle.
Our converted order is scheduled for production for Nov 28th, 2022. We'll see what happens.
 

Franklin78

2.0L EcoBoost
Member
First Name
Brad
Joined
Nov 10, 2021
Threads
0
Messages
16
Reaction score
16
Location
Franklin, TN
Vehicle(s)
2023 Ford Maverick Lariat EB
Engine
2.0L EcoBoost
Clubs
 
12 months since order confirmed I finally got a production date email for December 19th.

Ford Maverick Scheduled for production email (received 11/3/22) !!!!!!!!!!!!!!!!!!!!!!! Gmail - Your 2023 Maverick LARIAT Order__Page_1
 

Kro-Man

2.5L Hybrid
Active member
First Name
Kendall
Joined
Sep 21, 2022
Threads
2
Messages
42
Reaction score
63
Location
Sachse
Vehicle(s)
2023 Maverick XL
Engine
2.5L Hybrid
Clubs
 
I ordered on 9/16/22, same day as my brother, he got a scheduled for production email and I did not.
I guess Ford does not want to build the base models. I ordered an XL Hybrid and only added the standard tow hitch.
Oh well... life goes on.
 

vinnymac

2.0L EcoBoost
Well-known member
First Name
Vince
Joined
Oct 26, 2022
Threads
24
Messages
706
Reaction score
344
Location
Florida
Vehicle(s)
Maverick
Engine
2.0L EcoBoost
I ordered on 9/16/22, same day as my brother, he got a scheduled for production email and I did not.
I guess Ford does not want to build the base models. I ordered an XL Hybrid and only added the standard tow hitch.
Oh well... life goes on.
Mine is XL base with AWD that’s it ordered October 20 2023
 

McStevie

2.0L EcoBoost
New member
First Name
Steve
Joined
Nov 8, 2022
Threads
0
Messages
4
Reaction score
1
Location
Port Orange, Fla
Vehicle(s)
2022 Maverick
Engine
2.0L EcoBoost
Hi all, I’m new to the forum.. Ordered my 2023 Hybrid Lariat with luxury, and 360 on 9/3.. I got an email from Ford on 9/14 saying they have my order. I know it’s a painful process but, anyone out there receive any other email from ford on any updates ??
I will keep an eye out on this forum.. But on the bright side, my local dealer had a demo ‘22 with 4k miles on it. It was a EB Lariat AWD , but not exactly what I wanted, but the dealer said when my one on order arrives, he will give me full price for this one, so, I guess I will count my blessings, and enjoy it for 6 months, a year, 2 years … who knows
 
Sponsored

Gary C

2.0L EcoBoost
Well-known member
First Name
Gary
Joined
Oct 27, 2021
Threads
5
Messages
100
Reaction score
61
Location
Allentown,Pa
Vehicle(s)
XLT Maverick
Engine
2.0L EcoBoost
Clubs
 
YOUR VEHICLE IS SCHEDULED FOR PRODUCTION
Dear Robert Cannaday,

Big things are happening right now. We are excited to let you know your 2023 Maverick XLT SuperCrew has been scheduled for production. Your vehicle is scheduled to be built the week of December 19, 2022.

Forecasting a specific build date can be complex. Sometimes unforeseen challenges occur, or the custom details of your order can add time to this estimate. But even if your schedule needs adjusting, we’re working to build a vehicle that is everything you expect from a Ford.

In your Built Order Status email, we will provide you an estimated delivery window of when your vehicle will arrive at Peacock Ford. While you wait, check out the status of your vehicle at any time by clicking the button below.

We have included your Vehicle Identification Number (VIN) for your reference: XXXXXXXXXXXXX


[Got my email on 11-03-22 almost 1 year from the time I order. Schedule 12-19-22.
order date 11-04-21 EB 2.0 AWD Carb Gray hitch and full size spare.
 

Drifter

2.5L Hybrid
Active member
First Name
Joe
Joined
Nov 9, 2022
Threads
2
Messages
38
Reaction score
57
Location
Ohio
Vehicle(s)
2023 Maverick Lariat Hybrid BO, 2008 Shelby GT500
Engine
2.5L Hybrid
YOUR VEHICLE IS SCHEDULED FOR PRODUCTION
Dear Robert Cannaday,

Big things are happening right now. We are excited to let you know your 2023 Maverick XLT SuperCrew has been scheduled for production. Your vehicle is scheduled to be built the week of December 19, 2022.

Forecasting a specific build date can be complex. Sometimes unforeseen challenges occur, or the custom details of your order can add time to this estimate. But even if your schedule needs adjusting, we’re working to build a vehicle that is everything you expect from a Ford.

In your Built Order Status email, we will provide you an estimated delivery window of when your vehicle will arrive at Peacock Ford. While you wait, check out the status of your vehicle at any time by clicking the button below.

We have included your Vehicle Identification Number (VIN) for your reference: XXXXXXXXXXXXX
YOUR VEHICLE IS SCHEDULED FOR PRODUCTION
Dear Joseph A,

Big things are happening right now. We are excited to let you know your 2023 Maverick LARIAT SuperCrew has been scheduled for production. Your vehicle is scheduled to be built the week of November 28, 2022.

Origional order was 8 NOV 21 for a loaded Lariat except moon roof. Pretty much gave up and bought another car. When reorder rolled around I really like the Blackout package, so I reordered on 16 SEP with full options including the 360 assist. I had no expectations it would be built this year or even next. Shocked when I received the email on 3 NOV.
 
Last edited:

jhammer221

2.0L EcoBoost
Active member
Joined
Sep 14, 2022
Threads
0
Messages
25
Reaction score
26
Location
Ankeny, IA
Vehicle(s)
2023 Maverick on order
Engine
2.0L EcoBoost
woohoo - me as well ... ordered from granger ford Jan 25th and rolled over in September. Scheduled to be built 12-12.

Carbonized gray
ECO - 4K - fx4 -Lux package- CP360- remote start - FS spare and sliding rear window.

Let's see when it actually gets built. hoping get it by end of Jan. that would be nice. : )
 
Last edited:

ClintonDix

2.0L EcoBoost
Well-known member
Joined
Oct 10, 2022
Threads
2
Messages
55
Reaction score
31
Location
Pennsylvania
Vehicle(s)
23 Maverick
Engine
2.0L EcoBoost
What is the order lead time for the Caravans?
Longer than any Maverick lead time. Thankfully they have finally killed off the mobile washing machine along with the Journey as well.