Sponsored

Rlb080

2.5L Hybrid
Well-known member
First Name
Jerry
Joined
Nov 12, 2021
Threads
0
Messages
50
Reaction score
109
Location
Phoenix, AZ
Vehicle(s)
2014 F150 xlt
Engine
2.5L Hybrid
I'm at 498 days. Friday with be 500 for me. I feel lucky that I'm scheduled and have a VIN. Got scheduled at the 476th day. The scheduled "week" has moved from 4/10, to 4/11, 4/12, to 4/15, which I don't understand because all of the dates are in the same week. I feel for the folks in the 500 club that have not been scheduled yet.
Sponsored

 

Derek's Maverick

2.5L Hybrid
Well-known member
First Name
Derek
Joined
Jul 14, 2021
Threads
21
Messages
170
Reaction score
179
Location
Michigan
Vehicle(s)
2022 Ford Maverick
Engine
2.5L Hybrid
503 days and counting. Unscheduled and forgotten. Still a big amount of Oct. 2021 orders still floating around. 600 days is becoming more a reality every week. An all around terrible experience. Now I realize why people hate Ford so much.
 

Jeddums

2.5L Hybrid
Well-known member
Joined
Sep 16, 2022
Threads
0
Messages
85
Reaction score
166
Location
Elkins Park, PA
Vehicle(s)
2023 Lariat Mav
Engine
2.5L Hybrid
Clubs
 
503 days and counting. Unscheduled and forgotten. Still a big amount of Oct. 2021 orders still floating around. 600 days is becoming more a reality every week. An all around terrible experience. Now I realize why people hate Ford so much.
June 13th will be 600 days for me. Assuming (ha, ha, ha) that I get scheduled next week for the beginning of May there is still almost no way it will be here by day 600.
 

deltapapa

2.5L Hybrid
Member
Joined
Jan 12, 2023
Threads
1
Messages
8
Reaction score
7
Location
Tinley Park, il
Vehicle(s)
2023 ATLAS BLUE Maverick XLT, 01 Mustang GT Convt
Engine
2.5L Hybrid
Ordered October 6th, 2021. 510+ days. Sooo much 2nd guessing. Went from Velocity
Blue to Cactus Grey, then at the reorder to Atlas Blue. Now I wish I'd ordered the Pilot
360, since I have that extra money for it. Still not sure if the ICE would have been a better
choice for me, too late for that now. Getting any truck with a MPG over 30 will be
amazing.
The hobby goes on, ha, even though I don't have the truck yet, I have a pile of
accessories growing at the back half of the garage. Ordered an XLT w/Lux &
remote start. Now scheduled for week of March 20th. Goes without saying:
I'll believe it when I see it. Difficult to overcome the many disappointments.
I want this, had I needed it, I'd been long gone. Hang in there crew.
It is what it is, and dissing Ford will only lessen the experience when that "Ghost Truck"
finally arrives - IMHO....
 
Last edited:

Hatonapug

2.5L Hybrid
Well-known member
First Name
Ian
Joined
Nov 17, 2021
Threads
8
Messages
198
Reaction score
256
Location
19380
Vehicle(s)
23 Maverick XLT
Engine
2.5L Hybrid
So, every 3 days ford is pushing the estimated arrival range by another 3 days (Currently 2/23-3/16) so I emailed my dealer to see if they have any more details... Their system shows it's arriving tomorrow... So if their system is correct... I WONT make the 550 club... 547 days if I get it tomorrow.

edit: Just realized that's exactly 1.5 years.
 

Sponsored

kimjongil

2.5L Hybrid
New member
First Name
Ben
Joined
Mar 1, 2023
Threads
0
Messages
2
Reaction score
0
Location
delaware
Vehicle(s)
Lariat Hybrid
Engine
2.5L Hybrid
if all goes to plan i will be at 507. order 10/19/2021 est arrival is 3/10/23
 

Cobraj

2.5L Hybrid
Well-known member
First Name
Jay
Joined
Sep 20, 2022
Threads
1
Messages
152
Reaction score
173
Location
Maine
Vehicle(s)
Maverick, Jeep Gladiator
Engine
2.5L Hybrid
Some day 3 or 4 years from now, when you see mavericks all over the place , they will be saying man remember when people would wait more that a year an a half to get one of these things and the money they got for them! Crazy!
 

MvrkECWI

2.5L Hybrid
Well-known member
Joined
Apr 8, 2022
Threads
4
Messages
236
Reaction score
481
Location
54701
Vehicle(s)
Maverick, Crosstrek
Engine
2.5L Hybrid
Picked mine up on day 501. Dealer redeemed themselves through a quick easy sale. Decent trade in, no hassles. Hope the same for all you 500 Clubbers.
 

MrC

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Oct 23, 2021
Threads
0
Messages
64
Reaction score
53
Location
NC
Vehicle(s)
Subaru Forester
Engine
2.5L Hybrid
Day 505. Was scheduled last December as a 22 before rollover. XL Hybrid.
Was a priority 2 now a 10. ???
I gave up trying to figure this out.
Anyone with a ‘new’ 23 order getting delivered, pray 🙏 for the 500 club.
 

CZaugg

2.5L Hybrid
Well-known member
First Name
Curtis
Joined
Oct 12, 2021
Threads
29
Messages
440
Reaction score
480
Location
Rio Rancho, NM
Vehicle(s)
2023 Maverick Lariat Hybrid, 2021 Toyota Venza
Engine
2.5L Hybrid
Let's just hope and pray it does not move up to Club 600. I am not sure I would have the patience you guys have. I ordered in 9/22 and have a build date in 2 weeks, and the5 months drove me crazy, so do not think it could take the almost year and a half.
The last time I checked the poll, there were NO members of the 600 club. I got a call from my dealer today to advise me my maverick arrived at the dealership. He expects the Maverick to be ready for pick up either Thursday or Friday. That would be 517 days and 518 days respectively. It's been such a long long long wait.
 
Sponsored
OP
OP
Alan Help

Alan Help

2.5L Hybrid
Member
First Name
Alan
Joined
Jan 28, 2022
Threads
2
Messages
24
Reaction score
30
Location
Manhattan Ks
Vehicle(s)
Ford Fusion 2013
Engine
2.5L Hybrid
the next scheduling will be next week none this week and the ones coming out next week will be for May. April 6 will be 18 months. I will be at about the 20 month mark before I even see the thing at this rate. not overly happy right now. I almost want to wait for a 4x4 hybrid. in 2024 what difference will another 6 months make.
 

GTBuzz

2.0L EcoBoost
Well-known member
Joined
Oct 9, 2021
Threads
9
Messages
355
Reaction score
438
Location
Georgia
Vehicle(s)
Mustang Maverick
Engine
2.0L EcoBoost
Well, today is 500 for me. Thought being built at end of Jan might keep me out of the club.
 

FWDMav

2.5L Hybrid
Well-known member
First Name
Frans
Joined
Nov 18, 2021
Threads
0
Messages
49
Reaction score
53
Location
Westerville, OH
Vehicle(s)
2023 Maverick XLT, 2021 EDGE, 2014 Fiesta ST
Engine
2.5L Hybrid
Initial Ordered and Dora Signed on Oct 1st 2021, 524 days and counting
I'm too lazy to count the days, but if 10/1/21 to now is 524 days, I should be close to 500 since I ordered on 10/25/21. My salesman said that it is still in a rail yard in Wayne, MI. So hopefully sometime this year I get it. LOL
 

Ceets

2.0L EcoBoost
Member
First Name
Judy
Joined
Oct 4, 2021
Threads
2
Messages
17
Reaction score
31
Location
Fulton mo
Vehicle(s)
Nissan Rogue sport
Engine
2.0L EcoBoost
Let's just hope and pray it does not move up to Club 600. I am not sure I would have the patience you guys have. I ordered in 9/22 and have a build date in 2 weeks, and the5 months drove me crazy, so do not think it could take the almost year and a half.
I ordered xlt awd sept 18, 2021, fird confirmed 9/21,21...moved me to a 2023 sept 2022. Was built week if Jan 23. Done by the 27th. Been in Kansas city for a month, waiting to go to jeff city mo. Keep moving my date. Supposed to be on the truck tomorrow. Hopefully they don't move the date....again
Sponsored

 
 




Top