- First Name
- Gene
- Joined
- Sep 20, 2022
- Threads
- 4
- Messages
- 13
- Reaction score
- 20
- Location
- Brooksville, FL
- Vehicle(s)
- Maverick XLT - Hybrid, Polestar 2, Jeep Wrangler
- Engine
- 2.5L Hybrid
- Thread starter
- #1
The way I figure it there are 5 build days (1 week) for each hour the orders were opened. This means if your Maverick was ordered at 2:00 on 9/18 then you will have to wait 8 1/2 months before your Maverick gets scheduled to build. 
Sponsored
Last edited: