Sponsored

Hermosillo Plant closed week of Christmas: Dec 26-30th?

TdotMav

2.0L EcoBoost
Well-known member
Joined
Mar 8, 2022
Threads
8
Messages
195
Reaction score
90
Location
Toronto
Vehicle(s)
Acura MDX
Engine
2.0L EcoBoost
Hi Does anyone know if the plant closes for the week of Christmas: Dec 26-30th or do they still build trucks except for stat holidays Dec 25th and Dec 26th?
Sponsored

 

mdguy

2.0L EcoBoost
Active member
First Name
Doug
Joined
Oct 15, 2022
Threads
1
Messages
26
Reaction score
54
Location
Maryland
Vehicle(s)
Hyundai Ioniq EV
Engine
2.0L EcoBoost
I was wondering the same thing. My truck is in production this week. Don't know if there will be a delay next week.
 

IdahoDirtFarmer

2.0L EcoBoost
Well-known member
First Name
Shane
Joined
Sep 27, 2022
Threads
1
Messages
437
Reaction score
650
Location
Caldwell, ID
Vehicle(s)
Ram 1500 ordered '23 XLT, Eco, AWD, FX4
Engine
2.0L EcoBoost
I think they close completely from now till January 2nd. My Bronco Sport is showing in production but build date is 1/05. Basically just consider next week as if it doesn't exist as far as production goes. If they were working my build date would be 12/29, but since it's closed, it's all shifted to the first week after New Years.
 

mdguy

2.0L EcoBoost
Active member
First Name
Doug
Joined
Oct 15, 2022
Threads
1
Messages
26
Reaction score
54
Location
Maryland
Vehicle(s)
Hyundai Ioniq EV
Engine
2.0L EcoBoost
How do you find the build date?
 

FischAutoTechGarten

2.0L EcoBoost
Well-known member
First Name
Peter
Joined
Sep 9, 2022
Threads
58
Messages
2,535
Reaction score
3,633
Location
Green Valley Arizona USA, Alamos Sonora MEX
Vehicle(s)
2024 Mav Lariat EB LUX AWD 4K HPR BAP
Engine
2.0L EcoBoost
Clubs
 
There is no way Ford could get enough people to work to build anything Christmas week. This country almost stops completely between Dec 15 - Jan 5. Seriously. Everybody calls off of their job. Tradesmen don't show up to complete projects.
 

Sponsored

commadorebob

2.0L EcoBoost
Well-known member
First Name
Bob
Joined
Sep 17, 2022
Threads
62
Messages
4,943
Reaction score
10,513
Location
Alabama
Vehicle(s)
2025 Expedition Max Platinum; 2023 Maverick Lariat
Engine
2.0L EcoBoost
There is no way Ford could get enough people to work to build anything Christmas week. This country almost stops completely between Dec 15 - Jan 5. Seriously. Everybody calls off of their job. Tradesmen don't show up to complete projects.
I'm one of five people on a team of ~45 showing up as "online" on Teams today... and two of those are the production on-call folks.

I'd just call it a wash until January 3. Ford may surprise us with scheduling next week but I'm not holding my breath.
 
OP
OP
TdotMav

TdotMav

2.0L EcoBoost
Well-known member
Joined
Mar 8, 2022
Threads
8
Messages
195
Reaction score
90
Location
Toronto
Vehicle(s)
Acura MDX
Engine
2.0L EcoBoost
I think they close completely from now till January 2nd. My Bronco Sport is showing in production but build date is 1/05. Basically just consider next week as if it doesn't exist as far as production goes. If they were working my build date would be 12/29, but since it's closed, it's all shifted to the first week after New Years.
Ah yah that's probably same situation for mine with build date Jan 5th but currently says in production.
 

BoricuaBeautyx

2.0L EcoBoost
Well-known member
First Name
Tatiana
Joined
Jan 26, 2022
Threads
18
Messages
331
Reaction score
275
Location
Madison, AL
Vehicle(s)
2023 Ford Maverick XLT
Engine
2.0L EcoBoost
Ah yah that's probably same situation for mine with build date Jan 5th but currently says in production.
How did you get your build date, if you don't mind me asking. I had a build week of 12/19 and never got a build date
 

mdguy

2.0L EcoBoost
Active member
First Name
Doug
Joined
Oct 15, 2022
Threads
1
Messages
26
Reaction score
54
Location
Maryland
Vehicle(s)
Hyundai Ioniq EV
Engine
2.0L EcoBoost
Ditto, I can see the production date on the sticker in the "special order" box. But how to determine the build date?
 

tkistre

2.5L Hybrid
Well-known member
First Name
Tom
Joined
Nov 4, 2022
Threads
2
Messages
114
Reaction score
104
Location
Louisiana
Vehicle(s)
2023 Ford Maverick Lariat
Engine
2.5L Hybrid
How did you get your build date, if you don't mind me asking. I had a build week of 12/19 and never got a build date
You can use Ford Chat or call Ford Marketing and they can tell your build date. That's how I got mine.
 
Sponsored

BClubb352

2.5L Hybrid
Well-known member
First Name
Brandon
Joined
Sep 21, 2022
Threads
4
Messages
47
Reaction score
52
Location
Ocala, Florida
Vehicle(s)
2023 Ford Maverick Hybrid
Engine
2.5L Hybrid
You can use Ford Chat or call Ford Marketing and they can tell your build date. That's how I got mine.
Same here. You can only get estimated built date from Ford CS chat or call. However, I believe it's not on the same screen/app as all the other information and some reps don't know how to find it. Took me 3-4 attempts talking to different people before someone had an answer and it took them a couple minutes to find. My build week was 12/19 with an estimated build day 12/20, but it didnt actually get built til 12/21. Now waiting for shipping.
 

bbhaag

Well-known member
Joined
Jul 21, 2021
Threads
15
Messages
1,796
Reaction score
3,298
Location
Illinois
Vehicle(s)
Maverick XLT, Mustang Mach-E GT Performance
Engine
Undecided
Last year my Mav went into production on the 22nd and was built on the 29th. So yes the factory is still open during the Christmas holiday. Most likely in a limited capacity but still operational.

Ford Maverick Hermosillo Plant closed week of Christmas: Dec 26-30th? delivered1
 

fossil

2.0L EcoBoost
Well-known member
First Name
ernie
Joined
Aug 23, 2020
Threads
48
Messages
3,432
Reaction score
5,791
Location
ohio
Vehicle(s)
95 SVT Cobra Mustang, HPR Lariat Tremor
Engine
2.0L EcoBoost
There is no way Ford could get enough people to work to build anything Christmas week. This country almost stops completely between Dec 15 - Jan 5. Seriously. Everybody calls off of their job. Tradesmen don't show up to complete projects.
Due to the nature of assembly line production it's easier for Ford to have mass downtime rather than a large number of folks wanting vacation during the summer when kids are off school. Each person on vacation requires a trained replacement or quality and production suffers. If vacations were scattered throughout the year many people would be forced to take theirs during the winter months.
A week over Christmas and two weeks during the summer (usually July) are traditional for auto workers and part of the labor agreement. It's not what the workers want, they want vacation when they want it.
Tradesmen/ maintenance workers as a rule work those down weeks often seven twelve hour shifts per week for projects and serious maintenance. In my 36yrs as a maintenance electrician I was probably allowed/forced off during July shutdown 3 or 4 times but usually took vacation when I wanted it.
 

scourgio

2.0L EcoBoost
Active member
Joined
Aug 14, 2022
Threads
1
Messages
27
Reaction score
22
Location
PA
Vehicle(s)
Maverick XLT (first ever truck)
Engine
2.0L EcoBoost
There is no way Ford could get enough people to work to build anything Christmas week. This country almost stops completely between Dec 15 - Jan 5. Seriously. Everybody calls off of their job. Tradesmen don't show up to complete projects.
Thank you.
 

st3v

2.5L Hybrid
Well-known member
Joined
Mar 4, 2022
Threads
6
Messages
119
Reaction score
151
Location
Los Angeles, CA
Vehicle(s)
2024 Ford Maverick XLT Hybrid
Engine
2.5L Hybrid
My Maverick was scheduled to be built on 12/15. However, it took until 12/23 for the status to change to "Built". The status was "In body shop" until 12/23, when I got the email that it was "Built" and is awaiting shipment. As of today (12/27) it is still awaiting shipment (it has not been shipped yet).
Sponsored

 
 







Top