Sponsored

All September orders

Padre

2.5L Hybrid
Well-known member
First Name
Fr. Paul
Joined
Sep 13, 2021
Threads
16
Messages
116
Reaction score
209
Location
Twin Cities
Vehicle(s)
2023 Maverick XLT w/ Lux, CP360
Engine
2.5L Hybrid
September 13 order. Hybrid XLT Lux CP360. Called the hotline today and was told I am still in order processing.
Sponsored

 

Stive

2.5L Hybrid
Well-known member
First Name
Mark
Joined
Jan 10, 2022
Threads
11
Messages
229
Reaction score
200
Location
Ohio
Vehicle(s)
Mini Cooper, Lexus RX350, Maverick XL Hybrid
Engine
2.5L Hybrid
9/20 order built 5/23. XL Hybrid CP 360 and hitch. The shipped notification is marked but no date. I suspect it is not “actually” shipped but in the shipping yard.
 

Vols44

2.5L Hybrid
Well-known member
Joined
Sep 19, 2021
Threads
0
Messages
755
Reaction score
721
Location
Missouri
Vehicle(s)
2018 Edge
Engine
2.5L Hybrid
I've read about plenty of September hybrid orders slotted for June build dates. I've gotta wonder if this is part of Ford's grand plan to build them in the date they were ordered?

@fordvideoguy , won't have time to review the hundreds of hybrid order scheduled to see if this is true. It would be equally interesting to see the different dates for Lux/360 versus non Lux/360 build weeks or months.

In general terms Ecoboots are taking four months and hybrids eight. Not sure where FE's are slotting because June to January is a pretty large time span.
 

Tazgarde

2.5L Hybrid
Well-known member
First Name
Travis
Joined
Nov 14, 2021
Threads
3
Messages
94
Reaction score
93
Location
Brampton, Ontario
Vehicle(s)
2023 Ford Maverick XLT Hybrid2015 Honda CBR300RA
Engine
2.5L Hybrid
Clubs
 
Ordered September 11. XLT Hybrid Lux, Hard Rolling Tonneau, Bed Mat, & Floor Mats/Liners.

Delivered May 4, picked up May 16, in the shop for repairs May 30!
 

Captain

2.0L EcoBoost
Well-known member
First Name
Jim
Joined
Sep 19, 2021
Threads
13
Messages
896
Reaction score
1,185
Location
Union County, NJ
Vehicle(s)
63 Nova Convertible /
Engine
2.0L EcoBoost
Clubs
 
I've read about plenty of September hybrid orders slotted for June build dates. I've gotta wonder if this is part of Ford's grand plan to build them in the date they were ordered?

@fordvideoguy , won't have time to review the hundreds of hybrid order scheduled to see if this is true. It would be equally interesting to see the different dates for Lux/360 versus non Lux/360 build weeks or months.

In general terms Ecoboots are taking four months and hybrids eight. Not sure where FE's are slotting because June to January is a pretty large time span.
Ordered September 18, XLT AWD Lux and CoPilot with rear window. 02 priority and clean unscheduled…. I’m waiting now 9 months.
 

Sponsored

RAMS

2.0L EcoBoost
Well-known member
First Name
Rob
Joined
Oct 6, 2021
Threads
3
Messages
61
Reaction score
78
Location
NJ
Vehicle(s)
2020 Kia Sorento SX & 2007 Infiniti M35x
Engine
2.0L EcoBoost
Ordered 9/4. Run around since then. Got a VIN #, two weeks ago. Still shows in processing. Dealership told me it’s being built. Marketing told me im a 7/4 schedule build. Called today they said 8/1 build. Who knows who to believe or trust anymore. 🤦🏾🤦🏾🤷🏽‍♂️🤷🏽‍♂️ Just pray it arrives.
 
Last edited:

JMitch91

Member
First Name
Justin
Joined
Jan 27, 2022
Threads
0
Messages
12
Reaction score
13
Location
North Carolina
Vehicle(s)
1965 Ford Mustang, 15 Mazda3, 13 CT200h
Went to the dealer to order 9/23, they didn't actually place the order until I had Ford customer service get on them on 9/29. Ordered hybrid lariat with luxury package. Been sitting at priority 2 for about 2 months now with absolutely no communication from Ford and next to nothing from the dealer.

Honestly, I'm hoping to get pushed to 23. I know it's petty but I don't like getting a 22 when the 23's are about to roll off the line. Yeah it's still new but already a model year old. Kind of over this whole thing, if Toyota announces their version before I get my order, I'll probably just wait for that.
 

JazzyJockJeffcoat

2.5L Hybrid
Well-known member
Joined
Oct 11, 2021
Threads
0
Messages
99
Reaction score
140
Location
MD
Vehicle(s)
Chevy
Engine
2.5L Hybrid
Build week just got pushed back again via Ford email.

6/6 > 6/13 > 6/20 > 6/27
 

Espeer

2.5L Hybrid
Well-known member
Joined
Sep 13, 2021
Threads
0
Messages
334
Reaction score
439
Location
Virginia
Vehicle(s)
2012 focus, 2003 expedition
Engine
2.5L Hybrid
Build week just got pushed back again via Ford email.

6/6 > 6/13 > 6/20 > 6/27
I was told 6/6 via chat, first email was for 6/13, and got a bump to 6/20 today via email. Hopefully no more push backs for either of us!
 
Sponsored

pndwind

Well-known member
Joined
Oct 17, 2021
Threads
7
Messages
443
Reaction score
703
Location
Heart of Dixie
Vehicle(s)
F450 Amb
Engine
Undecided
OP
OP
Meintc

Meintc

2.5L Hybrid
Well-known member
First Name
Lynette
Joined
Oct 4, 2021
Threads
18
Messages
1,712
Reaction score
2,292
Location
Northern Lower TC Michigan
Vehicle(s)
2022 CO Hybrid Maverick
Engine
2.5L Hybrid
After watching Tim's live stream yesterday I contacted my dealer about rolling over to a 2023 if I don't get a build date. I still want my truck but want it with my specs. I'm not removing anything. I Just hope the color doesn't get eliminated. I'm really looking forward to my Cyber Orange.
 

WTFlavio

New member
First Name
Flavio
Joined
Mar 18, 2022
Threads
0
Messages
3
Reaction score
2
Location
Chicago
Vehicle(s)
Nissan Sentra
09/04/21 order date. Area51 Hybrid First Edition with all constraints still on. Talked to dealer today via email and they advised me to wait till next week to remove anything just in case I do get scheduled. Priority code 02 and unscheduled-clean. As far as I know its been priority 02 for about a month minimum now.

Ford Maverick All September orders Screenshot_20220610-221549_Gmail
 
 







Top