Thank you very muchMy signature block shows my whole time frames. But to copy/paste info here for easy viewing...
-Surprised Scheduled Email: 7/13/23 6:15PM CST. Scheduled for Week 8/28/23
-Tracker Date Changes: 9/1/23, 8/29/23, 8/28/23, 9/2/23
-In Production 9/2/23--Built 9/6/23--Shipped 9/13/23--Delivered 10/2/2023
So from finding out it was scheduled to when I got it in my driveway... 7/13/2023 - 10/2/2023 = almost 3 months.