Sponsored

Anyone who placed an order in 2021 still waiting for their Maverick?

Mjmilsted

2.5L Hybrid
Member
First Name
Mike
Joined
Oct 12, 2022
Threads
0
Messages
16
Reaction score
13
Location
Odenton md
Vehicle(s)
Escape
Engine
2.5L Hybrid
My XLT base with 4pin Hitch and inverter initially ordered 12/10/21 was just built Monday 1/25/23 and has just shipped. So you should be getting close but have more chance of constraint, of course. Good luck.
Great. Mine is getting closer also. It is scheduled for production week of February 9. I should get it in March, after a 17 month wait
Sponsored

 

Lou'sBluMav

2.5L Hybrid
Well-known member
First Name
Lou
Joined
Jun 14, 2022
Threads
5
Messages
131
Reaction score
112
Location
Upstate SC
Vehicle(s)
2004 Chevy Colorado(sold Oct) 2018 Subaru Forester
Engine
2.5L Hybrid
15 Months today. Awaiting shipment for over 2 weeks after waiting over an extra week for it to finish production. But it least it seems to exist!
 

BradnChristine

2.5L Hybrid
Well-known member
First Name
Brad
Joined
Nov 3, 2021
Threads
43
Messages
2,463
Reaction score
3,077
Location
Wyoming
Vehicle(s)
'23 Maverick Lariat Hybrid (towed); '25 Ranger Lariat; '15 C-Max; '20 Transit RV
Engine
2.5L Hybrid
15 Months today. Awaiting shipment for over 2 weeks after waiting over an extra week for it to finish production. But it least it seems to exist!
They must still be tweaking mine...still says IN Production since 1/12/23...but due to my dealer Saturday...;);)
 

99Lincoln

2.5L Hybrid
Member
First Name
Gary
Joined
Nov 6, 2022
Threads
0
Messages
6
Reaction score
2
Location
San Diego
Vehicle(s)
Maverick
Engine
2.5L Hybrid
Yes sept 29-2021. Good news it’s in San Diego but not quite at the dealership yet

871B2CB4-9ED5-465C-A4AB-010288FF3951.jpeg
Would Imagine once at dealership 2-3 days dealer add ons prep. Prob not they’re top priority
 

Stovebolt

2.0L EcoBoost
Member
Joined
Dec 14, 2022
Threads
3
Messages
20
Reaction score
22
Location
Planet Earth
Vehicle(s)
1953 Volkswagen
Engine
2.0L EcoBoost
First week of Nov 2021 EB XLT. Email from Ford today says shipping to dealer 22nd - 28th this month. 16 months is not all that bad considering supply chains extending outside the US during pandemic.
 

Sponsored

Michigan Bill

2.5L Hybrid
Well-known member
First Name
Bill
Joined
Jan 22, 2022
Threads
6
Messages
204
Reaction score
252
Location
S.E. Michigan
Vehicle(s)
2023 Maverick XLT Hybrid Lux, 2017 Chevy Equinox
Engine
2.5L Hybrid
Original order October 20, 2021. XLT Hybrid Lux. I should be picking it up from the dealer tomorrow. That'll be 471 days.
 

JennyLink

2.5L Hybrid
Active member
First Name
Jeanne
Joined
Apr 12, 2022
Threads
0
Messages
41
Reaction score
20
Location
Columbus, Georgia
Vehicle(s)
Maverick XLT Hybrid-in my garage 3-6-23
Engine
2.5L Hybrid
Good news and not so good news. After much frustration, I contacted Ford about my rollover order. They were able to give me a VIN and projected production week (which is now). It's in production, I've printed out the window sticker and projected delivery is March 14, 2023. After the rollover, I never received any emails directly from Ford, I couldn't get any answers from the dealer, which prompted me to contact Ford. I've been on the lookout for my "private offer" and just yesterday contacted Ford customer svc., again. They sent me back to the dealer. The dealer didn't know anything about a "private offer" but offered to check. I found out just like some others, I wasn't going to get the famed "private offer"! Why? Because I moved and my original address on my 2021 order doesn't match the 2023 rollover order! REALLY FORD! I'm a senior, on a fixed income and because I moved to a place that's more affordable, I pay the full 2023 price because they couldn't deliver my MY2022 Maverick! Pretty sad PR if you ask me.
 

Proflig8tor

2.5L Hybrid
Well-known member
Joined
Oct 28, 2021
Threads
14
Messages
160
Reaction score
237
Location
Atlanta, GA
Vehicle(s)
Gulfstream / Grumman AA5B
Engine
2.5L Hybrid
Ordered 10/11/21. Re ordered 9/15/22. Hybrid Lariat Lux ... nothing but priority ten since
 

Jozell

2.5L Hybrid
Well-known member
First Name
James
Joined
Jun 21, 2022
Threads
9
Messages
207
Reaction score
363
Location
Oklahoma
Vehicle(s)
Maverik<on order> Subaru Impreza
Engine
2.5L Hybrid
Ordered 10/9/21. Had a vin, converted to a 23. I'm built and on a very slow train.
 

7Litre

2.5L Hybrid
Well-known member
First Name
Robin
Joined
Oct 25, 2021
Threads
12
Messages
260
Reaction score
260
Location
Maine
Vehicle(s)
2020 Sonata Hybrid, 2023 Maverick XLT Hybrid
Engine
2.5L Hybrid
I've been tracking my railcar since 2/2 after getting the car# from my salesman. The CSX tracker has been a pleasure to work with despite the occasional misunderstood letters by the bot. With the railcar on CSX track, I was given an ETA of 3:45PM on Sunday, Feb 12 in East Brookfield MA. From there, it's all of 4.5 hours upta my dealership in Bangor (say Bang-gore). Time to get a couple dealer-installed items ordered up in case it arrives early.
 
Sponsored

Spiffster

2.5L Hybrid
Well-known member
First Name
Jeremy
Joined
Oct 3, 2021
Threads
2
Messages
51
Reaction score
73
Location
Denver, CO
Vehicle(s)
Ford Fusion Energi
Engine
2.5L Hybrid
I have been waiting since October 3rd 2021. Its been built and now Ford is trying to screw me out of the $2750 private offer. I have a 2022 VIN that has been cancelled and a 2023 VIN that is shipping to the dealer as we speak... No discount has been applied. I called Ford CR and they said there is no discount available under my account and to speak with the dealer. My god what a racket. Not even the first time Ford has screwed me, but it will be the last, Im done with Ford.
 

lbcoach34

2.5L Hybrid
Member
First Name
b
Joined
Jan 19, 2023
Threads
2
Messages
14
Reaction score
3
Location
no
Vehicle(s)
Maverick Hybrid Lariat pack
Engine
2.5L Hybrid
YEs, October 21st, 2021 - Hybrid LAriat - no VIN# order has been "in processing" for 16 months and counting
 

Privateer

2.5L Hybrid
New member
Joined
Nov 7, 2021
Threads
0
Messages
4
Reaction score
3
Location
Cookeville, TN
Vehicle(s)
2010 Prius
Engine
2.5L Hybrid
Looks like another scheduling date has come and gone. I believe most of us in this thread have been fairly patient and understanding, but it is baffling how similar or identical builds ordered much later than ours are being built. Today is 474 days since original order and best case scenario based on current production scheduling would result in a build date of April 17 - 541 days.

I hope others had better luck today and got scheduled!
 

CACTI_HYBRID

2.5L Hybrid
Well-known member
First Name
Rick
Joined
Feb 15, 2021
Threads
66
Messages
830
Reaction score
1,243
Location
Meridian, ID
Vehicle(s)
2022 Ford Maverick XL Hybrid
Engine
2.5L Hybrid
A huge part of the problem is that everything is far more complicated than necessary. How is it I can order anything from Amazon online, track the order as it's processed, moves through shipping, know when it will be delivered, track the truck move through the neighborhood and then get a photo of it sitting on my doorstep once it arrives, yet Ford operates like this? The "Private Offer" should be electronically tied to the order, a printed copy of which could be put in the glove box of the delivered vehicle with a confirmation number the dealer could compare against when final sales paperwork is being done.
 

theway-yay-ting

2.5L Hybrid
Well-known member
First Name
Al
Joined
Feb 2, 2022
Threads
39
Messages
1,396
Reaction score
2,345
Location
Virginia
Vehicle(s)
2014 Honda CR-V, 2019 Kia Sportage
Engine
2.5L Hybrid
Looks like another scheduling date has come and gone. I believe most of us in this thread have been fairly patient and understanding, but it is baffling how similar or identical builds ordered much later than ours are being built. Today is 474 days since original order and best case scenario based on current production scheduling would result in a build date of April 17 - 541 days.

I hope others had better luck today and got scheduled!
Today is 472 for me, still no end in sight. 🤷‍♂️
Sponsored

 
 







Top