- Thread starter
- #1
Hello All,
I’m located in NE Texas and ordered a Maverick from 3 dealers the first hour the order banks opened in Sept. 22 after trying to secure a 2022 hybrid XL from dealerships within 250 miles of me for months. All the 2022 hybrids had a large markup. My orders were all Cactus Gray XL hybrids with only trailer hitch added. One got scheduled on 11/23/22, had an estimated build of 12/19/22, but built 01/04/23 and has shipped. The other two orders are confirmed by Ford with email communications of delays every 45 days. So, I switched one XL order to an XLT recently when I saw the XL hybrids were oversold. Was this a good move? Should I switch the other open order to an XLT to increase the likelihood of a quicker production? Or, does making a change cause further delays?
I’m located in NE Texas and ordered a Maverick from 3 dealers the first hour the order banks opened in Sept. 22 after trying to secure a 2022 hybrid XL from dealerships within 250 miles of me for months. All the 2022 hybrids had a large markup. My orders were all Cactus Gray XL hybrids with only trailer hitch added. One got scheduled on 11/23/22, had an estimated build of 12/19/22, but built 01/04/23 and has shipped. The other two orders are confirmed by Ford with email communications of delays every 45 days. So, I switched one XL order to an XLT recently when I saw the XL hybrids were oversold. Was this a good move? Should I switch the other open order to an XLT to increase the likelihood of a quicker production? Or, does making a change cause further delays?
Sponsored