Sponsored

Waiting 11 months might be a good thing....

NolaRad

2.5L Hybrid
Active member
First Name
Jim
Joined
Sep 29, 2021
Threads
6
Messages
32
Reaction score
64
Location
Temescal Valley, CA
Vehicle(s)
Maverick Hybrid
Engine
2.5L Hybrid
After reading the issues with an improperly manufactured battery cable, I can understand how my Hybrid build date moved 4 times from June 6 to its current August 6. Are there possibly some other gremlins being modified? Maybe waiting will be good in the long run.
Sponsored

 

CoryDallas8123

2.5L Hybrid
Well-known member
First Name
Cory
Joined
Jul 2, 2021
Threads
17
Messages
864
Reaction score
1,720
Location
Dallas, TX
Vehicle(s)
Audi A4, Chevy Chevelle SS, 2022 Maverick XLT
Engine
2.5L Hybrid
Yep. I just watched @fordvideoguy Tuesday video and it makes more sense why I went from June 27th to August 15th. The damn near 2 month delay, on top of the original delay in tryin to get scheduled, sucks but it is what it is.
 

n0maverick

2.5L Hybrid
Well-known member
Joined
Dec 27, 2021
Threads
0
Messages
326
Reaction score
471
Location
MidMO
Vehicle(s)
2022 Tiguan, 2022 Maverick, 2013 Escape
Engine
2.5L Hybrid
No doubt. would be nice to have cliff notes weekly from the live stream. Life is too busy around here.
 

Bad Actor

2.0L EcoBoost
Well-known member
First Name
Christopher
Joined
Jan 15, 2022
Threads
7
Messages
471
Reaction score
1,015
Location
SE Missouri
Vehicle(s)
01 Ranger XLT, 73 Mustang Base, 02 Toyota Camry
Engine
2.0L EcoBoost
Apparently, loads of problems producing Mavericks. In addition to constrained items and possible stop sales due to manufacturing issues, I just read that they are also struggling to keep the plants open in Mexico due to Covid.
 

ITSATRUCK

Well-known member
First Name
TIM
Joined
Oct 31, 2021
Threads
2
Messages
409
Reaction score
713
Location
CANADA
Vehicle(s)
MAVERICK
Yes, mine was built in May. Fingers crossed they got a bunch of stuff figured out. I wait until Oct to order as I wanted them to build enough of them to figure some stuff out. Don't want to be the first few thousand.
 

Sponsored

James D

2.5L Hybrid
Well-known member
First Name
James
Joined
Nov 13, 2021
Threads
2
Messages
494
Reaction score
387
Location
Utah
Vehicle(s)
Volkswagon
Engine
2.5L Hybrid
Bummer you had to delete 360 Tim because it also adds power mirrors to the XL. On the road by yourself, you will have to pull over to adjust the right side mirror. I saw how 360 works on the Ford Maverick Maniac Youtube channel. Maybe you can add it back in.
 

fordvideoguy

Well-known member
First Name
Tim
Joined
Jul 10, 2021
Threads
155
Messages
2,354
Reaction score
8,505
Location
Salina, KS
Website
www.long-mcarthur.com
Vehicle(s)
2022 F-150 Lightning, 2021 Ford Bronco
Engine
Undecided
They are scheduling 2 months out. June scheduling for August dates. July scheduling for September/October. That way all the 22MY scheduling will be done before the 23MY order banks open up August 15th.
 

999

Banned
Banned
Joined
Oct 25, 2021
Threads
6
Messages
690
Reaction score
1,055
Location
Florida
Vehicle(s)
Boxster, Yamaha FJ1300, Maverick XL
I hear the 2025s will be perfect.
 

Chance301

2.5L Hybrid
Well-known member
Joined
Aug 12, 2021
Threads
3
Messages
115
Reaction score
142
Location
West Virginia
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
Have an unscheduled xlt hybrid lux ordered July 21. Based on what I read on this site, I may be close to getting the last 2022 produced!
 

Deleted member 1483

Guest
Have an unscheduled xlt hybrid lux ordered July 21. Based on what I read on this site, I may be close to getting the last 2022 produced!
I feel bad. Mine was July and I was able to get mine in April, and it seems like I missed all the problems as well.
 

fordvideoguy

Well-known member
First Name
Tim
Joined
Jul 10, 2021
Threads
155
Messages
2,354
Reaction score
8,505
Location
Salina, KS
Website
www.long-mcarthur.com
Vehicle(s)
2022 F-150 Lightning, 2021 Ford Bronco
Engine
Undecided
I mentioned August, they are scheduling August build dates in the month of June (this month). They are scheduling September/October build dates in the month of July.

fordvideoguy said:
They are scheduling 2 months out. June scheduling for August dates. July scheduling for September/October. That way all the 22MY scheduling will be done before the 23MY order banks open up August 15th.
Sponsored

 
 







Top