I just got pushed out 5 weeks.
I've been driving a borrowed car because I made the big (my) mistake of selling my car for good profit when I ordered. At least my stepdad's ford ranger 2001 with manual transmission is still going. but the heater doesn't work =O

  • Ordered 7/06
  • Originally scheduled in December for 21FEB week
  • Today rescheduled for 28MAR week
I hear ya. You will win. Watch some YouTube vids, order your parts, borrow those tools and fix that heater. The older they are the easier they are to fix. Hang tough!
Sponsored

 

midcoastme

2.5L Hybrid
Well-known member
First Name
Jim W
Joined
Aug 12, 2021
Threads
12
Messages
173
Reaction score
216
Location
The Mid-Coast of Maine
Vehicle(s)
2 PT Cruisers & Maverick Lariat Hybrid.
Engine
2.5L Hybrid
Clubs
 
Got the coveted scheduled for production email six days ago, scheduled for March 13. New date is April 11.
Aaaaaaaand Whammyyyyyyyyy!
Not shocked. Not gonna piss and moan about it, just sharing the update. Details in my signature.
Same here. Glad I still like my C-maxes.
 
OP
OP

L26bar-man

Member
First Name
Dan
Joined
Dec 26, 2021
Threads
1
Messages
22
Reaction score
46
Location
Massachusetts, USA
Vehicle(s)
1997 Jeep Cherokee Sport (original owner)
Herb chambers in westboro. I never recieved my confirmation email but 3 people confirmed my order is in
Herb in Braintree flat out told me in August they are marking up their Mavericks so I thanked them for their honesty and moved on.
 

Randy H.

2.5L Hybrid
Well-known member
First Name
Randy
Joined
Aug 25, 2021
Threads
45
Messages
612
Reaction score
940
Location
Bristol, CT
Vehicle(s)
Maverick & Civic
Engine
2.5L Hybrid
Pushed from Feb28 to Mar28. Hybrid also.
 

Lone Star Proud

2.5L Hybrid
Well-known member
First Name
William
Joined
Aug 31, 2021
Threads
20
Messages
645
Reaction score
1,548
Location
Central Texas
Vehicle(s)
Ford Maverick XLT
Engine
2.5L Hybrid
These delays don't bode well for those of us that haven't got a build date at all. If you guys are being pushed into mid April already, where are they going to fit in the rest of us? I'm a late August guy and can realistically see another five months to go.

I find it hard to believe that Ford is going to be able to fill all the 2022 orders.
 

Sponsored

Rob Cactus Gray

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Sep 16, 2021
Threads
27
Messages
1,838
Reaction score
4,121
Location
Sierra Vista AZ
Vehicle(s)
11 Prius
Engine
2.5L Hybrid
Six days to reschedule? Six days?
I completely understand constraints and what not but really, what has changed that they didn’t know six days ago? At least wait a few weeks to seem a little more credible. Hahaha!
What changed was Fords stock dropping 8 percent (20 percent in 12 days). Also, the reallocation of micro chips to more profitable F150s to appease share holders but not consumers. I sold my Ford shares at $24.50 so I hope it falls and I will buy it back on sale.

those things seem plausible. Until you get the info that people have been getting delayed constantly since August. I’m pretty sure I got delayed the next day and then two more delays on my first build (I walked due to price gouging). I agree that this is a poor practice. Ford should be scheduling with very few unknowns at this point or not scheduling. At least they updated you and didn’t leave you in production purgatory for 4-5 weeks.
 
Last edited:

NotAnonymous

2.5L Hybrid
Well-known member
Joined
Jun 9, 2021
Threads
2
Messages
871
Reaction score
1,257
Location
Indiana
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
My original build week was 1/31 but just got pushed back to 2/7 a couple of days ago. Now, last night, I got another email pushing it back to 2/14 (it's a hybrid). June order here and based on the emails you guys are getting I full anticipate getting pushed into March at the very least. This way maybe I can enjoy the soon to be rising interest rates! 😬
 

WFred8

Active member
First Name
Bill
Joined
Aug 10, 2021
Threads
2
Messages
26
Reaction score
54
Location
33884
Vehicle(s)
Ford Fusion
I hear ya too! Mine was scheduled for Feb 7, now moved to Feb 28th. It's almost seems its par for the course now. It seems usually two delays before the time it actually gets built, so I'm expecting one more delay. At least we know they are commited to building our trucks, rather than just a note that they have received our order.
 

Mav_27

2.0L EcoBoost
Banned
Banned
Joined
Sep 18, 2021
Threads
11
Messages
334
Reaction score
435
Location
Michigan
Vehicle(s)
Ford Maverick
Engine
2.0L EcoBoost
Got the coveted scheduled for production email six days ago, scheduled for March 13. New date is April 11.
Aaaaaaaand Whammyyyyyyyyy!
Not shocked. Not gonna piss and moan about it, just sharing the update. Details in my signature.
Same exact order 2 months earlier still nothing scheduled
 
Sponsored

PIJane

Active member
Joined
Sep 2, 2021
Threads
2
Messages
29
Reaction score
45
Location
Boston, MA
Vehicle(s)
Q5
I got the same email today. Grrrrr
All of this feels completely random. I ordered from Quirk Ford in Quincy. (Shout out to Tom who explained the process easily and I had a confirmation email right away. A few dealers I spoke with sounded like they were making sh*t up and got a little condescending when I suggested my research didn’t match what they were telling me 😡). I finally got a 3/7 build date last week…but fortunately for me, got an email last night saying it was moved up to 2/21. (Ordered 9/2/21). I have no confidence I won’t get another email telling me it’s been bumped to April/May so it is hard to get excited by this. I feel most for all the people who haven’t even got an order confirm from Ford but their dealer is telling them it’s in…that would give me high anxiety…(not saying the order isn’t in!)
 

Mark Rash

2.5L Hybrid
Well-known member
First Name
Mark
Joined
Jul 30, 2021
Threads
0
Messages
173
Reaction score
233
Location
Knoxville, TN
Vehicle(s)
2022 Ford Maverick, 2015 Nissan Rogue
Engine
2.5L Hybrid
Got the coveted scheduled for production email six days ago, scheduled for March 13. New date is April 11.
Aaaaaaaand Whammyyyyyyyyy!
Not shocked. Not gonna piss and moan about it, just sharing the update. Details in my signature.
I feel ya. I just got pushed back from week of Feb 28 to week of Mar 28. Ugh. Oh well. Just glad to have a date.
 

johnpbrewer

2.5L Hybrid
Well-known member
First Name
John
Joined
Oct 29, 2021
Threads
4
Messages
118
Reaction score
115
Location
Chaska, MN
Vehicle(s)
2008 Ford Ranger
Engine
2.5L Hybrid
Mine got picked last week for 3/7, now moved to 4/4. Not complaining, I got a build date so I'm good.

It was a hybrid order. I'm wondering if all the reschedules are on Hybrids?

Anyway, it's sure to increase the anxiety of those hoping to get picked tomorrow.
Yep
 

stoptothink

2.5L Hybrid
Well-known member
Joined
Jul 30, 2021
Threads
1
Messages
845
Reaction score
1,389
Location
Utah
Vehicle(s)
'17 VW jetta
Engine
2.5L Hybrid
Got scheduled last week for March 7th, got the email this morning that it's been pushed back to March 28th. At this point we may be fortunate to get our truck a year after we ordered.
 

machoneguy

2.5L Hybrid
Member
First Name
Jack
Joined
Dec 9, 2021
Threads
1
Messages
12
Reaction score
13
Location
43506
Vehicle(s)
2023 Escape , 1972 Mach 1 Mustang
Engine
2.5L Hybrid
We got same email it was 3-14 build date now 4-11 wife is pissed, At the rate Ford is going it will be 12 months before we see it, We ordered 6-14. Why is it that June orders are always getting screwed over?