Sponsored

Moving production date

s.ober

2.5L Hybrid
Well-known member
Joined
Apr 26, 2022
Threads
14
Messages
118
Reaction score
55
Location
97304
Vehicle(s)
2015 Prius; 1998 Sienna
Engine
2.5L Hybrid
First the production date was the week o9f August 29, then September 12th and now it's back to September 5th. Hybrid, Lariat, Lux, Co Pilot, SIBL. Ordered October 26.
Sponsored

 

oilman300

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Oct 25, 2021
Threads
8
Messages
332
Reaction score
332
Location
Georgia
Vehicle(s)
2022 Velocity Blue XL Hybrid
Engine
2.5L Hybrid
My first week was July 25th, then it was moved to August 22nd, then it was moved again to August 29th. Who knows what it will be this week.
 

CoryDallas8123

2.5L Hybrid
Well-known member
First Name
Cory
Joined
Jul 2, 2021
Threads
17
Messages
864
Reaction score
1,720
Location
Dallas, TX
Vehicle(s)
Audi A4, Chevy Chevelle SS, 2022 Maverick XLT
Engine
2.5L Hybrid
My first week was July 25th, then it was moved to August 22nd, then it was moved again to August 29th. Who knows what it will be this week.
August 29th must be the new week for XLT w/ Lux and CP360. Mine was moved to the 29th as well.

I’m sure we’ll be moved to September sooner than later too.
 

oilman300

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Oct 25, 2021
Threads
8
Messages
332
Reaction score
332
Location
Georgia
Vehicle(s)
2022 Velocity Blue XL Hybrid
Engine
2.5L Hybrid
August 29th must be the new week for XLT w/ Lux and CP360. Mine was moved to the 29th as well.

I’m sure we’ll be moved to September sooner than later too.
Maybe it's CP360 as I have an XL so no Lux. I hope it's not moved to September. It'll be a year since I ordered mine before I get it.
 

Scott Asheville

2.0L EcoBoost
Well-known member
First Name
Scott
Joined
Oct 4, 2021
Threads
79
Messages
2,320
Reaction score
5,449
Location
Asheville, NC
Vehicle(s)
2022 AWD XLT ECO LUX CP360 HPR
Engine
2.0L EcoBoost
I just got my third "your build week has slipped" email. I seem to get them very consistently every Tuesday night.
 

Sponsored

xlt-doug

2.0L EcoBoost
Well-known member
First Name
Ed
Joined
Oct 17, 2021
Threads
3
Messages
273
Reaction score
417
Location
New York
Vehicle(s)
Maverick (soon) Escape (current)
Engine
2.0L EcoBoost
August 29 as well. I don’t receive ford emails ever, so I’ll never know if I get bumped. Don’t see many ecos getting pushed so I may be good.
 

Z_ealot

2.0L EcoBoost
Well-known member
Joined
Dec 4, 2021
Threads
5
Messages
360
Reaction score
404
Location
Albuquerque
Vehicle(s)
Nissan 370Z, Honda Civic, Ford Maverick
Engine
2.0L EcoBoost
I've never received even one email.
Have received a total of about 4 emails since ordering, as far as scheduling I only ever received one stating my build week was scheduled for august 1st, before that I had contacted ford directly and was told my build week was august 8th and just last week after receiving no status updates after the 1st had passed I learned my build week had been moved to august 15th…..round and round on the production schedule we go, where we land not even ford knows lol
 

meanmanphillip

Active member
First Name
phillip
Joined
Apr 5, 2022
Threads
5
Messages
39
Reaction score
27
Location
Redding
Vehicle(s)
honda pilot
Order confirmed 7-22. First build date was 6-13, then 6-20, 6-27, 7-25, 7-30 , 8-1. 8-15.
As of monday chat said" I see that the status of your vehicle order is "Scheduled to Day". This means the order has been assigned a build day (2022-08-19) and a rotation number. It is 'locked-in' and cannot be amended. " Anyone know if that means the truck is actually going to be built?
 

oilman300

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Oct 25, 2021
Threads
8
Messages
332
Reaction score
332
Location
Georgia
Vehicle(s)
2022 Velocity Blue XL Hybrid
Engine
2.5L Hybrid
I've only got the first email when i placed my order and then the email suggesting I remove the CP360 in order to get scheduled. I hav to visit my dealer or call Ford to find out my build week and all the changes.
 
Sponsored

oilman300

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Oct 25, 2021
Threads
8
Messages
332
Reaction score
332
Location
Georgia
Vehicle(s)
2022 Velocity Blue XL Hybrid
Engine
2.5L Hybrid
It sounds like by next it will be built.
 

Bad Actor

2.0L EcoBoost
Well-known member
First Name
Christopher
Joined
Jan 15, 2022
Threads
7
Messages
471
Reaction score
1,015
Location
SE Missouri
Vehicle(s)
01 Ranger XLT, 73 Mustang Base, 02 Toyota Camry
Engine
2.0L EcoBoost
Went on Ford Chat today. Build week pushed to 9/5. Lovely....
 

ccmjr77

2.5L Hybrid
Well-known member
First Name
Cal
Joined
Jul 20, 2021
Threads
6
Messages
685
Reaction score
1,259
Location
Reidsville, NC
Vehicle(s)
22 Maverick XLT Hybrid, 22 Hyundai Sonata Hybrid
Engine
2.5L Hybrid
Seems like every time I go to Ford Customer service, my production week is pushed back.
Got VIN in May, original production week was 7/4/22, 4 or more delays later, it is supposed to be built week of 8/29/22. Originally ordered 7/7/21.
 

buyacar

2.5L Hybrid
Well-known member
Joined
Sep 11, 2021
Threads
4
Messages
149
Reaction score
76
Location
New York, NY
Vehicle(s)
Maverick
Engine
2.5L Hybrid
Order confirmed 7-22. First build date was 6-13, then 6-20, 6-27, 7-25, 7-30 , 8-1. 8-15.
As of monday chat said" I see that the status of your vehicle order is "Scheduled to Day". This means the order has been assigned a build day (2022-08-19) and a rotation number. It is 'locked-in' and cannot be amended. " Anyone know if that means the truck is actually going to be built?
Not really. I got and build day before but still got pushed back
 

pistons pissing

2.5L Hybrid
Well-known member
First Name
Cody
Joined
Mar 7, 2022
Threads
1
Messages
249
Reaction score
402
Location
oklahoma
Vehicle(s)
2015 toyota camry
Engine
2.5L Hybrid
Order confirmed 7-22. First build date was 6-13, then 6-20, 6-27, 7-25, 7-30 , 8-1. 8-15.
As of monday chat said" I see that the status of your vehicle order is "Scheduled to Day". This means the order has been assigned a build day (2022-08-19) and a rotation number. It is 'locked-in' and cannot be amended. " Anyone know if that means the truck is actually going to be built?
I have the same build day! I sure hope we get them built next week. Let's go Ford!
Sponsored

 
 







Top