First the production date was the week o9f August 29, then September 12th and now it's back to September 5th. Hybrid, Lariat, Lux, Co Pilot, SIBL. Ordered October 26.
Sponsored
August 29th must be the new week for XLT w/ Lux and CP360. Mine was moved to the 29th as well.My first week was July 25th, then it was moved to August 22nd, then it was moved again to August 29th. Who knows what it will be this week.
Maybe it's CP360 as I have an XL so no Lux. I hope it's not moved to September. It'll be a year since I ordered mine before I get it.August 29th must be the new week for XLT w/ Lux and CP360. Mine was moved to the 29th as well.
I’m sure we’ll be moved to September sooner than later too.
I've never received even one email.I just got my third "your build week has slipped" email. I seem to get them very consistently every Tuesday night.
Have received a total of about 4 emails since ordering, as far as scheduling I only ever received one stating my build week was scheduled for august 1st, before that I had contacted ford directly and was told my build week was august 8th and just last week after receiving no status updates after the 1st had passed I learned my build week had been moved to august 15th…..round and round on the production schedule we go, where we land not even ford knows lolI've never received even one email.
Not really. I got and build day before but still got pushed backOrder confirmed 7-22. First build date was 6-13, then 6-20, 6-27, 7-25, 7-30 , 8-1. 8-15.
As of monday chat said" I see that the status of your vehicle order is "Scheduled to Day". This means the order has been assigned a build day (2022-08-19) and a rotation number. It is 'locked-in' and cannot be amended. " Anyone know if that means the truck is actually going to be built?
I have the same build day! I sure hope we get them built next week. Let's go Ford!Order confirmed 7-22. First build date was 6-13, then 6-20, 6-27, 7-25, 7-30 , 8-1. 8-15.
As of monday chat said" I see that the status of your vehicle order is "Scheduled to Day". This means the order has been assigned a build day (2022-08-19) and a rotation number. It is 'locked-in' and cannot be amended. " Anyone know if that means the truck is actually going to be built?