- First Name
- Nate
- Joined
- Sep 1, 2021
- Threads
- 0
- Messages
- 2
- Reaction score
- 3
- Location
- Lexington, Ky
- Vehicle(s)
- 2022 XL, 1988 FJ62
- Engine
- 2.5L Hybrid
Ordered an XL hybrid with 4-pin and all weather mats on 9/1. In April I received my VIN and a build week of 5/23. On 5/20 I got an email that changed the build week to 6/13. Then to 6/20. Then to 6/27. Just got one that changed it to 7/4 - which makes me glad production is in a different country. I don't mind waiting, but I have grown to hate opening email the week before my build weeks. - I ordered the Maverick the day after I accepted a job 60 miles from home. The ole Xterra sure ain't a Prius.
Sponsored