OMG! There’s no hope:-(
Sponsored
I have a production date of 10/19, and an 'ETA End Date' (whatever that mean) of 11/09, and a blend date of 10/07 on my sticker. I also see modules, but have no idea if it is all of them or not. I am guessing it will be finished in the next couple of weeks, depending on part needed.I'm confused. Truck was in production week of 10/25. Never showed a date under in production when I tracked it. All of a sudden Friday it shows 10/29 and my window sticker changed the date on the very bottom, but the blend date stayed the same (10/21).
Truck shows modules so I assumed it was built but now I'm guessing they started it on the 29th. So now it's probably sitting there half built on the line.![]()
I have had my EB orderd since 6/30. They haven't built it yet. My salesman said they have the mats..don't know why mine is in limbo.Wonder if it’s mostly hybrids. I had no delays or issues getting my 2.0
The ones of us who ordered AWD do, because we are supposed to get Snowmaggedon 2.0 here in Texas this winter. That's my whole reason behind ordering the Maverick.I do I do,
Well I am in Texas![]()
Yes, hybrids are the UnicornHoping to get mine by my birthday at end of February...
It was kind of awesome last week getting my scheduled build the week of 12/20/2022 email until about 24 hours later I received another one saying it would now be two weeks later, on 1/3/2022.
Basically, at this point I have no expectations. This truck is a unicorn.
Got my notice. 2.0 moved from 11/08 to 11/15...I have my EB 2.0 scheduled for the week of November 8th....this does not look good...![]()
When did you receive your notice?Got my notice. 2.0 moved from 11/08 to 11/15...
All metals are up. Domestically, scrap steel is up about 600% from pre-pandemic levels, Copper, Aluminum & Brass up about 80%, lead about 100%. If you are planning on purchasing any durable/hard good do it as soon as possible. I just ordered another Maverick(Ecoboost this time) and will be buying a Nissan Frontier soon. If you THINK you need it, BUY IT NOW!!!This is a total shocker!!
Material are up 3x for steel only. The automotive companies screwed their self by canceling just on time contracts during the pandemic. The suppliers shifted their chips to other pandemic business. Now the chip and steel supplier want a premium to reactivate their previous contracts with the auto industry. Who is getting harmed at the end??
My built date was November 8th. I told others the best case scenario it would be 3 mouths late. It is looking more like up to a year.
My blend day was 10/13 . Build started on 10/22 that was the first time the date on my sticker changed. That was also the day my modules went active . I have had the window sticker date change 3 times last time was 10/28. Still shows in production as of 11/1 at 8pm.I'm confused. Truck was in production week of 10/25. Never showed a date under in production when I tracked it. All of a sudden Friday it shows 10/29 and my window sticker changed the date on the very bottom, but the blend date stayed the same (10/21).
Truck shows modules so I assumed it was built but now I'm guessing they started it on the 29th. So now it's probably sitting there half built on the line.![]()
I just checked and I was moved to "In Production" A major milestone in my eyes!If you went in production last week that means your truck is probably on the assembly line so material shortages will probably only affect builds that haven't begun yet I would assume. Mine went in production last week also (10/25 build week).
We are in the exact same boat. In production 10-28. HybridHad a 10/25 build week. Wonder if they hit pause on Friday at 5 pm and left it on the assembly line until further notice.