- First Name
- Don
- Joined
- Jun 26, 2021
- Threads
- 30
- Messages
- 244
- Reaction score
- 286
- Location
- Springfield, IL
- Vehicle(s)
- 2018 Tesla Model 3 Long Range, 2022 Ford Maverick
- Engine
- 2.5L Hybrid
Ordered 7/26/21 Lariat Hybrid, First Edition, Rapid Red, Lux Pkg, CoPilot 360 - I've had my window sticker since May 27th, subsequently changed to June 27th, been pushed back like twelve times now. This past week I called CS, was told it was set for production August 7th, called the very next day & I'm told it was just updated to August 13th production. At this rate I expect the next time I call it will be pushed back again. She could not tell me why except probably a component or two missing. I told her I've seen the exact build ordered two months or so after mine & they have there trucks. Could not tell me why. I was told by my dealer that it had been built on July 4th but no eta indicated. Early July CS told me an eta of July 30th to August 3rd. No eta's show now. I'll call again Monday, & I won't be surprised if it is again pushed back another week. It is what it is!!!I agree, they should just work from earliest to latest and if there's a constraint item it should get put on the earliest order date first until that one is built. I think lots of us in October would be built by now doing that.
Sponsored