How realistic is "8-12 weeks" from order date?

omniphil

New member
Joined
Nov 26, 2021
Threads
1
Messages
2
Reaction score
0
Location
NH
Vehicle(s)
Ranger
This is what the dealer told us when we placed an order mid Oct 2021. (This is a 2.0 and not the Hybrid)

Just wondering how realistic that time frame is given the Maverick's popularity or if that is just the general numbers the dealer gives people.
It seems to me that folks that placed their orders way back when this started have only started to get their Mavericks, so I would have to imagine that an order placed in mid Oct has TONS of people in front them.
Sponsored

 

Hyfly11

2.5L Hybrid
Well-known member
First Name
Hyrum
Joined
Sep 25, 2021
Threads
9
Messages
96
Reaction score
89
Location
Idaho
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
I ordered a maverick 2.0 EB early Oct and still no production date. Keep in mind that production dates are being scheduled about 6-8 weeks out from what I have seen. And then another 4 weeks for delivery roughly.
So even if you get scheduled this week you would still be roughly 10-12 weeks away before it is delivered probably.
 

jc888888888

2.0L EcoBoost
Well-known member
First Name
Joe
Joined
Nov 3, 2021
Threads
12
Messages
377
Reaction score
465
Location
Saint Augustine Florida
Vehicle(s)
Lariat eco boost, Mustang Mach E , Porsche Boxster
Engine
2.0L EcoBoost
From what have seen ..12 weeks for an eco boost would be totally FAST .8 weeks doubtful .i ordered 11/3 I would be dancing in the street if it came inside of 4 month,s.:)
 

Big_T

2.5L Hybrid
Well-known member
First Name
T
Joined
Jun 10, 2021
Threads
51
Messages
1,745
Reaction score
3,489
Location
North Carolina
Vehicle(s)
2022 Maverick XL Hybrid
Engine
2.5L Hybrid
I think you got it right when you said 8 to 12 weeks is their standard answer. That said, 12 weeks may be possible but not likely. I'd say maybe early spring might be a better guess.
 
OP
OP

omniphil

New member
Joined
Nov 26, 2021
Threads
1
Messages
2
Reaction score
0
Location
NH
Vehicle(s)
Ranger
I ordered a maverick 2.0 EB early Oct and still no production date. Keep in mind that production dates are being scheduled about 6-8 weeks out from what I have seen. And then another 4 weeks for delivery roughly.
So even if you get scheduled this week you would still be roughly 10-12 weeks away before it is delivered probably.
So basically 6-8 weeks before you even get a build date. And then 4 weeks for build and delivery?
 

Sponsored

Big_T

2.5L Hybrid
Well-known member
First Name
T
Joined
Jun 10, 2021
Threads
51
Messages
1,745
Reaction score
3,489
Location
North Carolina
Vehicle(s)
2022 Maverick XL Hybrid
Engine
2.5L Hybrid
So basically 6-8 weeks before you even get a build date. And then 4 weeks for build and delivery?
More like 8 weeks at best to get a build date, 2 weeks for blend and build, 4 weeks for delivery. So 14 weeks in a perfect world which this isn't.
 

Evil2ltr

Well-known member
First Name
Kevin
Joined
Oct 22, 2021
Threads
9
Messages
312
Reaction score
393
Location
Asheville, NC
Vehicle(s)
2022 Alto Blue Maverick XLT AWD
8 to 10 months....if you ordered now.
 

Davidod

2.0L EcoBoost
Well-known member
First Name
David
Joined
Sep 4, 2021
Threads
5
Messages
63
Reaction score
51
Location
St johns, michigan
Vehicle(s)
2022 Ford Maverick
Engine
2.0L EcoBoost
So basically 6-8 weeks before you even get a build date. And then 4 weeks for build and delivery?
I ordered on 6-19. Build date is 11-29. That’s over 5 months and delivery will probably be another month. Ordered an awd 2.0 .
 

Hdang1980

2.5L Hybrid
Well-known member
Joined
Aug 14, 2021
Threads
17
Messages
958
Reaction score
1,783
Location
Elk Grove, CA
Vehicle(s)
2022 Ford Maverick Hybrid
Engine
2.5L Hybrid
This is what the dealer told us when we placed an order mid Oct 2021. (This is a 2.0 and not the Hybrid)

Just wondering how realistic that time frame is given the Maverick's popularity or if that is just the general numbers the dealer gives people.
It seems to me that folks that placed their orders way back when this started have only started to get their Mavericks, so I would have to imagine that an order placed in mid Oct has TONS of people in front them.
I think "optimistic" would be the better word.
 
Sponsored

Evil2ltr

Well-known member
First Name
Kevin
Joined
Oct 22, 2021
Threads
9
Messages
312
Reaction score
393
Location
Asheville, NC
Vehicle(s)
2022 Alto Blue Maverick XLT AWD

Hyfly11

2.5L Hybrid
Well-known member
First Name
Hyrum
Joined
Sep 25, 2021
Threads
9
Messages
96
Reaction score
89
Location
Idaho
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
A lot of it also depends on your dealer. How many orders they have vs how many allocations they get.
 

Stumblios

2.0L EcoBoost
Active member
First Name
Brad
Joined
Nov 6, 2021
Threads
3
Messages
26
Reaction score
53
Location
Lucasville
Vehicle(s)
2022 Ford Maverick 2023 ford bronco sport
Engine
2.0L EcoBoost
Ordered july 28, took delivery nov 3rd. Xlt lux fx4 4k to a dealership in nova scotia canada. So maybe?
 

LowLeadAV

2.0L EcoBoost
Well-known member
First Name
Ryan
Joined
Nov 18, 2021
Threads
9
Messages
261
Reaction score
503
Location
Lexington SC
Vehicle(s)
Niro
Engine
2.0L EcoBoost
My dealer said 12-14 weeks. ordered 11/15 EB, 4K, sliding window, spray on liner and inverter
 

bbhaag

Well-known member
Joined
Jul 21, 2021
Threads
15
Messages
1,796
Reaction score
3,298
Location
Illinois
Vehicle(s)
Maverick XLT, Mustang Mach-E GT Performance
Engine
Undecided
IMO 12 weeks is pretty optimistic but possible. My experience is anecdotal but I'll walk you through it.

On 8/16 Ford forced me to reorder my Maverick so we will use this date NOT my original order date.

So production officially started mid September so lets say 9/16. I didn't receive a VIN until 10/21 with a build date of 12/13. If that goes to plan it should take around a week for production then lets estimate 4 weeks for shipping.

So for me 9/16 when production started to 10/21 equals 4.5 weeks to get a VIN. Add an additional 3 weeks from 10/21 until the tentative build date of 12/13. So now we are at 7.5 weeks from when production started until my build date.
Now we have to add an additional 4 weeks for shipping so that brings me to a penitential wait time of 12-13 weeks which is close to the longer end that your dealer said it would take.

Lets face it dealers are optimistic anyway especially when talking to customers so a 13-14 week wait wouldn't surprise me.